Pipeline design Sample Clauses

Pipeline design. Drilling of Xxxxx Preparation of areas and/or access routes to the location. Maritime and/or air transportation of personnel, Materials and/or equipment. Support services. Well drilling services. Performance of formation tests. Supplies and Materials. Well completion. Safety, Health and Environment Environmental impact studies. Prevention and detection of fire and gas leaks Treatment and disposal of residues. Environmental restoration. Safety audits. Environmental audit. [illegible signatures] Development General Technical economic evaluations. Contract administration. Development plan with detailed engineering. Administration, management of activities and general project expenses. Geophysical Detailed seismic reinterpretation. Seismic data processing and reprocessing. Geology Geological – petrophysical characterization of Reservoirs Geochemical analysis of samples. Stratigraphic studies Hydrocarbon analysis.
AutoNDA by SimpleDocs
Pipeline design. CONSULTANT will prepare the pipeline design for both the North City to San Xxxxxxx and the North City to Miramar conveyance systems, including hydraulic analysis, plan and profiles, identify necessary manholes, blow-offs, relief valves, junction structures, air venting, pressure reducing stations, surge protection devices, other appurtenant facilities, Instrumentation, and recommendations for pipe material and joints. There are up to three (3) existing Pressure Reducing Stations (PRS) that are connected to the existing 36-inch recycled water line. The existing valves will be assessed; Operations and Maintenance records reviewed, and the manufacturer will be consulted to determine if the existing valves are suitable for service when the NCCS project is commissioned. It is anticipated that the existing valves can be used, however if they aren’t rated for the pressures required, they will be replaced during construction of the NCCS. CONSULTANT will provide hydraulic profiles for minimum and maximum flows. CONSULTANT will provide hydraulic calculations pertaining to air/vacuum and air release valves, blow-off assemblies and other appurtenances that are required. CONSULTANT will provide site hydrologic and hydraulic calculations and structural design calculations for pipe supports. As part of the Thirty Percent design, the CONSULTANT will define construction staging requirements; spoil disposal requirements, and all supporting facilities and requirements including field office facilities and locations for the CITY. The CONSULTANT shall investigate and provide recommendations including the location and size of work areas, equipment and material storage, haul roads, equipment set up areas. CONSULTANT will provide a drawing index and table of contents for the contract documents including cover sheet, location map and index sheets, plans and profiles, structures, appurtenances, and details. Specification table of contents will include all known General Requirements and Technical Specifications titles. The Table of Contents for the anticipated Specifications for the pipeline shall be in conformance with the Standard Specifications for Public Works Construction format.
Pipeline design. Provide consulting services for the design of water mains, transmission mains, siphons and associated appurtenances. Provide preliminary and final design services including the preparation of plans, specifications, and cost estimates. Provide bidding assistance, construction support, and final as-builts as needed for projects.
Pipeline design. CONSULTANT will prepare the Force main, Brine Pipeline, and 36" and 16 diameter water mains, including hydraulic analysis, plan and profiles, identify necessary manholes, blow-offs, relief valves, junction structures, air venting, pressure reducing stations, surge protection devices, other appurtenant facilities, Instrumentation, and recommendations for pipe material and joints. CONSULTANT will provide hydraulic profiles for minimum and maximum flows. CONSULTANT will provide hydraulic calculations pertaining to air/vacuum and air release valves, blow-off assemblies and other appurtenances that are required. CONSULTANT will provide site hydrologic and hydraulic calculations and structural design calculations for pipe supports. As part of the Thirty Percent design, the CONSULTANT will define construction staging requirements; spoil disposal requirements, and all supporting facilities and requirements including field office facilities and locations for the CITY. The CONSULTANT shall investigate and provide recommendations including the location and size of work areas, equipment and material storage, haul roads, equipment set up areas. Design of Morena Pump Station June 20, 2016 And Conveyance Pipelines (HI66635) A-20 CONSULTANT will provide a drawing index and table of contents for the contract documents including cover sheet, location map and index sheets, plans and profiles, structures, appurtenances, and details. Specification table of contents will include all known General Requirements and Technical Specifications titles. The Specifications for the pipelines shall be in conformance with the Standard Specifications for Public Works Construction format. The CONSULTANT shall comply with the requirements stated in attached checklist at each stage of the design submittals.

Related to Pipeline design

  • Project Design Applicants must design a project that provides access to health services to enable eligible women and men experiencing health needs to secure and maintain safe and accessible quality screening and diagnostic services, comprehensive family planning, and/ or other women’s health services. A. Applicants are encouraged to emphasize the following components in the design of their projects. Projects must: 1. Use a collaborative approach to maximize existing community resources and avoid duplication of effort; 2. Enhance systems and local processes to make it easier for people to transition to, from, and between services; 3. Address barriers to ensure services are accessible to people regardless of setting or location; and 4. Promote improvement and positively impact health and well-being through coordinated service delivery. B. To be effective, services and activities provided or made available as part of the Proposed Project should have policies and procedures in place and include with the application as an attachment that: 1. Delineate the timely provision of services; 2. Deem Client eligibility and service provision as soon as possible and no later than 30 calendar days from initial request; 3. Require staff to assess and prioritize Client needs; 4. Implement with model fidelity to an evidence-based program or based upon best available research; 5. Plan in partnership with the person and are inclusive; 6. Provide in an environment that is most appropriate and based on a person’s preference including reasonable clinic/reception wait times that are not a barrier to care; 7. Provide referral sources for Clients that cannot be served or receive a specific service; 8. Are culturally and linguistically sensitive; 9. Tailor services to a person’s unique strengths and needs; 10. Manage funds to ensure established Clients continuity of care throughout budget year; 11. Continue to provide services to established Clients after allocated funds are expended; 12. Have processes to identify and eliminate possible barriers to care; 13. Do not deny services due to inability to pay; 14. Have appropriate key personnel and required staff to meet the medical and health needs of Clients; 15. Bill services appropriately and timely through TMHP; 16. Effectively communicate and document information related to health care needs with next steps available to Client; 17. Establish outreach and education plan for the community; and 18. Outline successful delivery of direct clinical services to Clients By submitting an Application under this RFA, the Applicant certifies that Applicant has or will have at time of grant award services, policies, or procedures that conform with the requirements in this section as applicable. HHSC, in its sole discretion, may request to review relevant documentation during the project period as necessary to ensure program fidelity.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and PCS, PCS shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks and the Entrance Facility, on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs. 2.4.2 Prior to ordering any Two-Way Interconnection Trunks from Verizon, PCS shall meet with Verizon to conduct a joint planning meeting (“Joint Planning Meeting”). At that Joint Planning Meeting, each Party shall provide to the other Party originating Centium Call Second (Hundred Call Second) information, and the Parties shall mutually agree on the appropriate initial number of Two-Way End Office and Tandem Interconnection Trunks and the interface specifications at the Point of Interconnection (POI). Where the Parties have agreed to convert existing One-Way Interconnection Trunks to Two-Way Interconnection Trunks, at the Joint Planning Meeting, the Parties shall also mutually agree on the conversion process and project intervals for conversion of such One-Way Interconnection Trunks to Two-Way Interconnection Trunks. 2.4.3 Two-Way Interconnection Trunks shall be from a Verizon End Office or Tandem to a mutually agreed upon POI. 2.4.4 On a semi-annual basis, PCS shall submit a good faith forecast to Verizon of the number of End Office and Tandem Two-Way Interconnection Trunks that PCS anticipates Verizon will need to provide during the ensuing two (2) year period to carry traffic from PCS to Verizon and from Verizon to PCS. PCS’s trunk forecasts shall conform to the Verizon CLEC trunk forecasting guidelines as in effect at that time. 2.4.5 The Parties shall meet (telephonically or in person) from time to time, as needed, to review data on End Office and Tandem Two-Way Interconnection Trunks to determine the need for new trunk groups and to plan any necessary changes in the number of Two-Way Interconnection Trunks. 2.4.6 Two-Way Interconnection Trunks shall have SS7 Common Channel Signaling. The Parties agree to utilize B8ZS and Extended Super Frame (ESF) DS1 facilities, where available. 2.4.7 With respect to End Office Two-Way Interconnection Trunks, both Parties shall use an economic Centium Call Second (Hundred Call Second) equal to five (5). 2.4.8 Two-Way Interconnection Trunk groups that connect to a Verizon access Tandem shall be engineered using a design blocking objective of Xxxx-Xxxxxxxxx B.005 during the average time consistent busy hour. Two-Way Interconnection Trunk groups that connect to a Verizon local Tandem shall be engineered using a design blocking objective of Xxxx-Xxxxxxxxx B.01 during the average time consistent busy hour. Verizon and PCS shall engineer Two-Way Interconnection Trunks using BOC Notes on the LEC Networks SR-TSV-002275. 2.4.9 The performance standard for final Two-Way Interconnection Trunk groups shall be that no such Interconnection Trunk group will exceed its design blocking objective (B.005 or B.01, as applicable) for three

  • Purpose of Interconnection Facilities Except as may be required by Applicable Laws and Regulations, or as otherwise agreed to among the Parties, the Interconnection Facilities shall be constructed for the sole purpose of interconnecting the Large Generating Facility to the Participating TO’s Transmission System and shall be used for no other purpose.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from Onvoy to Frontier, Onvoy, at Xxxxx’s own expense, shall: 2.3.1.1 provide its own facilities for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA; and/or 2.3.1.2 obtain transport for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA (a) from a third party, or, (b) if Frontier offers such transport pursuant to a Frontier access Tariff, from Frontier. 2.3.2 For each Tandem or End Office One-Way Interconnection Trunk group for delivery of traffic from Onvoy to Frontier with a utilization level of less than sixty percent (60%) for final trunk groups and eighty-five percent (85%) for high usage trunk groups, unless the Parties agree otherwise, Onvoy will promptly submit ASRs to disconnect a sufficient number of Interconnection Trunks to attain a utilization level of approximately sixty percent (60%) for all final trunk groups and eighty-five percent (85%) for all high usage trunk groups. In the event Onvoy fails to submit an ASR to disconnect One-Way Interconnection Trunks as required by this Section, Frontier may disconnect the excess Interconnection Trunks or bill (and Onvoy shall pay) for the excess Interconnection Trunks at the rates set forth in the Pricing Attachment. 2.3.3 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from Frontier to Onvoy, Frontier, at Frontier’s own expense, shall provide its own facilities for delivery of the traffic to the technically feasible Point(s) of Interconnection on Frontier’s network in a LATA.

  • Interconnection 2.1 This section applies to linking with suppliers providing public telecommunications transport networks or services in order to allow the users of one supplier to communicate with users of another supplier and to access services provided by another supplier, where specific commitments are undertaken.

  • Participating TO’s Interconnection Facilities The Participating TO shall design, procure, construct, install, own and/or control the Participating TO’s Interconnection Facilities described in Appendix A at the sole expense of the Interconnection Customer. Unless the Participating TO elects to fund the capital for the Participating TO’s Interconnection Facilities, they shall be solely funded by the Interconnection Customer.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • Initiating Interconnection 4.1 If ENT determines to offer Telephone Exchange Services and to interconnect with Verizon in any LATA in which Verizon also offers Telephone Exchange Services and in which the Parties are not already interconnected pursuant to this Agreement, ENT shall provide written notice to Verizon of the need to establish Interconnection in such LATA pursuant to this Agreement. 4.2 The notice provided in Section 4.1 of this Attachment shall include (a) the initial Routing Point(s); (b) the applicable technically feasible Point(s) of Interconnection on Verizon’s network to be established in the relevant LATA in accordance with this Agreement; (c) ENT’s intended Interconnection activation date; (d) a forecast of ENT’s trunking requirements conforming to Section 14.2 of this Attachment; and (e) such other information as Verizon shall reasonably request in order to facilitate Interconnection. 4.3 The interconnection activation date in the new LATA shall be mutually agreed to by the Parties after receipt by Verizon of all necessary information as indicated above. Within ten (10) Business Days of Verizon’s receipt of ENT’s notice provided for in Section 4.1of this Attachment, Verizon and ENT shall confirm the technically feasible Point of Interconnection on Verizon’s network in the new LATA and the mutually agreed upon Interconnection activation date for the new LATA.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!