Preliminary Design Review Sample Clauses

Preliminary Design Review. 2.3.1 The Construction Manager shall actively and jointly participate with the County and the Professional in formation of the final Project design.
AutoNDA by SimpleDocs
Preliminary Design Review. The PDR purpose, scope and deliverables are defined in paragraph 3.2.4.3. Each Functionality Release shall have a PDR. The PDR for [***] may be combined with the SRR by mutual consent.
Preliminary Design Review. SpaceX shall conduct a Preliminary Design Review (PDR) in accordance with the PDR definition in Appendix 3. Success Criteria: - Successful completion of the PDR per Appendix 3 criteria - Explanation of SpaceX plans for PCBM fabrication and verification prior to flight, including identification of associated schedule and risks. Amount: $22,000,000 Date: June 2008
Preliminary Design Review. A Preliminary Design Review (PDR) will be held at Endwave's facility. This PDR will cover the technical approach of all [*] bands and project plan at that point in time.
Preliminary Design Review a. Within sixty (60) days after receipt by the Artist of Notice to Proceed issued to the Artist by the Director of DAV, the Artist shall prepare and submit to the City detailed preliminary working drawings of the Work and the Site, together with such other graphic material as may reasonably be requested by the City in order to permit the City to carry out preliminary design review and to certify the compliance of the Work with the finally approved preliminary design of the Work. Upon request by the Artist, the City shall promptly furnish all readily available information and assistance required by the Artist in connection with said submission. However, the City does not guarantee its information, materials and assistance, and assumes no liability therefore. The Artist shall be solely responsible for designing the Work in compliance with all applicable City, State and/or Federal statutes, ordinances, and/or regulations.
Preliminary Design Review. (PDR) FFD shall conduct a Preliminary Design Review (PDR) in accordance with the PDR definition in Appendix 4. Success criteria: Successful completion of the PDR Jan 2016
Preliminary Design Review. The Developer shall refer to the “Submittal Requirements for Utility Developer Extensions” for submittal requirements. Incomplete submittals will not be processed. Plans must comply with the Utility Engineering Standards.
AutoNDA by SimpleDocs
Preliminary Design Review. (PDR) FFD shall conduct a Preliminary Design Review (PDR) in accordance with the FFD Project Control Plan. Success criteria: Successful completion of the PDR Milestone 7: Spacesuit Assembly (SSA) Fabrication Complete FFD shall complete assembly of an SSA in accordance with the FFD Project Control Plan for use in testing. Success Criteria: Successful completion, and confirmed pressurization of SSA.
Preliminary Design Review. (PDR) for Second Mission Astrobotic shall conduct a System PDR in accordance with the PDR definition. Success criterion: Review requirements, design and operations as baseline for detailed design. Establishes the ‘design-to’ baseline. January 2017 LUNAR CATALYST ANNUAL REVIEW March 2017
Preliminary Design Review. (PDR) shall mean review of the Preliminary Design Documentation as provided in Section 3.12.3.3 of the Scope of Work.