Roadway Plans Sample Clauses

Roadway Plans. 5.1 The plans and specifications for improvements to Olympia Drive prepared by Xxxxxx and approved by Landlord, entitled “Olympia Drive Plan,” prepared by Xxxxxx & Associates, Inc., dated July 20, 2012, included as Sheets C8 and C9 of the Approved Plans, a copy of which plans and specifications are on file with Landlord, Tenant, and the Amherst Town Clerk.
AutoNDA by SimpleDocs
Roadway Plans. Garver will perform the following as applicable:
Roadway Plans. Title sheet; detailed index; general notes; typical sections; summary of quantities; estimated quantities; plan-profile sheets; special design sheets; construction sequencing sheets (when necessary), traffic signal sheets, traffic control plan; complete form grades for interchange ramps, loops, and channelized intersections (in accordance with current Design Manual, at 25 feet intervals); permanent directional signing sheets that include layouts, details (signs and overhead assemblies), and estimated quantities; detailed pavement marking sheets; Right-of-Way Coordinate Sheet(s), final cross- sections; and all notes and data used to develop the plans.
Roadway Plans. Printing Costs (bond) = $0.45 per square foot (sq. ft.) Reduced Sheets (11"x17") = Full-Size Sheets (22"x34") = Full-Size Mylar Sheets = 1.3 sq. ft. 5.2 sq. ft. $7.50 each Total Number of Sheets = 55 Pre-Final Submittal IDOT Oswego Utilities N/A Total Reduced Plan Sets 5 2 10 17 Subtotal: $546.98 Final Submittal IDOT Oswego Utilities N/A Total Reduced Plan Sets 5 2 10 17 Subtotal: $546.98 Subtotal: $140.00 ($10.00 per specifications book X 14 sets of specifications) Subtotal: $1,233.95 2.8 Meetings and Coordination Mileage Rate: $0.655 Mileage Number Destination Round-Trip of Trips HRG (Aurora) to Client 22 2 Mileage: $28.82 Subtotal: $28.82 2.11 Administration Postage Allowance $ 200.00 Subtotal: $200.00 TOTAL: $93,260.92 Exhibit D 0000 Xxxxx Xxxx Xxxxxx Xxxxxxx, Xxxxxxxx 00000 Phone (000) 000-0000 xxx.xxxxxxx.xxx May 4, 2022 Xx. Xxxxx Xxxxxxxx, PE Project Manager - Transportation XX XXXXX, INC. 0000 Xxxxxxx Xxxxx, Xxxxx 000 Aurora, IL 60506 Re: Proposal for Geotechnical Engineering Services Xxxxxxx Road Bridge over Xxxxxx Creek Phase II Engineering Services Oswego, Kendal County, Illinois Wang No. P220417 Dear Xx. Xxxxxxxx: Xxxx Engineering, Inc. (Xxxx) is pleased to present this proposal to provide geotechnical drilling, laboratory testing, engineering analyses, and recommendations for the Phase II engineering services for the proposed replacement of the bridge carrying Xxxxxxx Road Bridge over Xxxxxx Creek, in Oswego, Kendall County, Illinois. Xxxx prepared a structure geotechnical report (SGR) during Phase I design. This proposal is for a roadway geotechnical roadway report (RGR) and preliminary environmental site assessment for soil disposal. The following describes our proposed scope of work, cost estimate, and assumptions made in developing the cost estimate.
Roadway Plans. The Roadway Expansion will be designed by the City Engineer, or such other engineer as is selected by the City, in accordinace with applicable rules and regulations. Upon completion of the preliminary plans and specifications for the Roadway Expansion (the “Roadway Plans”), the City Engineer will submit a set of the Roadway Plans to Developer for review. Developer may, at its election, provide a written request to the City specifically identifying any requested additions to the Roadway Plans, which may include a deceleration lane into or other improvements serving the Development, within thirty (30) days of receipt. If Developer fails to provide such written request within this thirty (30)-day period, Developer will be deemed to have requested no additions to the Roadway Plans. In the event that Developer does timely request additions to the Roadway Plans as set forth herein, the City agrees to cooperate with Developer to agree on modifications to the Roadway Plans, provided that the City and Developer will enter into a cost sharing agreement pursuant to which Developer will fund all costs incurred by the City in connection with the design, permitting and construction of such additions.
Roadway Plans. The roadway plans are working drawings that show the location, configuration and dimensions of the prescribed work that includes: layouts, profiles, structures and other necessary details. The civil plan set will consist of the following drawings: o Title Sheet 1 Sheet o Index of Sheets, IDOT Standards and General Notes 1 Sheet o Summary of Quantities 3 Sheets o Schedule of Quantities – Earthwork only 4 Sheets o Existing and Proposed Typical Sections 1 Sheet o Alignment, Ties and Benchmarks 1 Sheet o Traffic Control and Protection (Detour Plan) 1 Sheet o Traffic Control and Protection (Detour Notes & Details) 1 Sheet o Removal Plan 1 Sheet o Roadway Plan & Profile 2 Sheet o Erosion and Sediment Control Plan 1 Sheet o Erosion and Sediment Control Notes and Details 3 Sheets o Grading Plan – Bridge and Channel 2 Sheet o Grading Plan – Compensatory Storage 1 Sheet o Pavement Marking and Signing Plan 1 Sheet o Construction Details 2 Sheets o District Three Standard Drawings 6 Sheets o Cross Sections – Channel 2 Sheets o Cross Sections – Roadway 6 Sheets Total 40 Sheets • The work under this task will include a guardrail design and analysis to support the guardrail features shown on the plans. Deliverable will be a Barrier Warrant Analysis. • The work under this task will include developing a pavement design for full depth HMA pavement. • A disposition of comments will be provided for each submittal. • Provide Internal QA Review.

Related to Roadway Plans

  • Service Plans 2.1 Standard Price Service Standard Price Term Home Basic Broadband 100 HK$168 Monthly Plan 24 consecutive months HomeFibre 500 HK$178 Monthly Plan 24 consecutive months HomeFibre 1000 HK$198 Monthly Plan 24 consecutive months

  • Meal Plans Residents living in Residence Facility are required to purchase a University meal plan. Information regarding the meal plan options can be obtained by contacting the meal plan office at 000-000-0000.

  • As-Built Plans Within thirty (30) days after completion of Tenant’s Changes requiring the submission of plans to Landlord, Tenant shall furnish to Landlord a complete set of “as-built” plans and specifications.

  • Group Health Benefit Plans, Carrier and Premiums 7.1.1 When enrolment and other requirements for group participation in various plans have been met, the Employer will sponsor such plans to the portion agreed upon and such sponsorship shall not exceed that which is authorized or accepted by the benefit agency.

  • SEP Plans Under a simplified employee pension (SEP) plan that meets the requirements of IRC Sec. 408(k), your employer may make contributions to your Traditional IRA. Your employer is required to provide you with information which describes the terms of your employer’s SEP Plan. No SEP plan contributions may be made to a Xxxx XXX.

  • Insurance Plans The Executive is eligible to participate in the life, health, dental, short and long-term disability plans made available to the employees of the Company pursuant to the terms and conditions of such plans.

  • Irrigation Systems The Project Area either has no irrigation system or a low-volume drip irrigation system. If a watering system is used, it is a drip irrigation system equipped with a filter, pressure regulator and emitters rated at twenty (20) gallons per hour (gph) or less. The system is maintained free of leaks and malfunctions. No spray irrigation is applied to the Project Area, including spray from irrigation systems adjacent to the Project Area.

  • Loop Makeup Response Time - Electronic This report measures the average interval and the percent within the interval from the electronic submission of a Loop Makeup Service Inquiry (LMUSI) to the distribution of Loop Makeup information back to the CLEC. Exclusions Manually submitted inquiries Canceled Requests Business Rules The response interval starts when the CLEC’s Mechanized Loop Makeup Service Inquiry (LMUSI) is submitted electronically through the Operational Support Systems interface, TAG. It ends when BellSouth’s Loop Facility Assignment and Control System (LFACS) responds electronically to the CLEC with the requested Loop Makeup data via the TAG Interface. LSRs submitted via LENs will be reflected in the results for the TAG interface.

  • Benefit Plans The Executive shall be entitled to participate in any benefit plans relating to stock options, stock purchases, awards, pension, thrift, profit sharing, life insurance, medical coverage, education, or other retirement or employee benefits available to other senior executive employees of the Company, subject to any restrictions (including waiting periods) specified in such plans.

  • Medical Plans The Employer will maintain the current health (including vision) and dental insurance programs and practices. The Employer shall contribute 80% of the premium charge for PPO plans, 83% of premium for the POS plan, 85% of premium for the HMO plan, 80% for the prescription drug plan and 50% for the dental plan. There shall be no change in the State’s premium subsidy for health benefits plans in Fiscal Year 2012.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!