Schematic Design Drawings. Schematic Design Drawings means, at a minimum, a site development plan, building plans, elevations, sections, and perspective sketches sufficient to convey comprehensive design intent.
Schematic Design Drawings. City has approved the Schematic Design Drawings listed on Exhibit A.
Schematic Design Drawings. Vicinity Plan
Schematic Design Drawings. Based on Owners’ prior approval of the preliminary design set forth in the Proposal, the Contractor will initially prepare and submit to the Owners 50% Schematic Design drawings as set forth in Attachment “A” (the “Schematic Design”). The Schematic Design will include blocking/stacking exercises, preparation of schematic drawings and construction specifications in sufficient detail to clearly define all items which may affect the Project Budget. During the Schematic Design phase, the design will be refined and input will be solicited from the staff of the School Board and City. In preparing Schematic Design documents, the Contractor will, among other usual and customary tasks, lead the Project team in developing building concepts and design parameters; conduct required research of codes applicable to the Project; obtain existing drawings, documentation and files of existing site and buildings; provide topographic and boundary surveys; develop preliminary plans, elevations, and sections for review; review the construction schedule; and provide a preliminary estimate of the construction costs to be included in the Project Budget. The Schematic Design documents shall identify major building systems and construction materials. The Contractor will consider the use of alternative materials, building systems and equipment in developing a design for the Project that is consistent with the Program, the preliminary Project Schedule and the then- current estimates of the Project Budget. At the end of the Schematic Design phase, the Contractor will present to the Owners the 95% Schematic Design drawings described on Attachment “A” for review and approval, as well as revised construction cost estimates to be included in an updated version of the Project Budget. The Contractor will meet with City personnel and School Board personnel before the Schematic Design submission to determine any necessary zoning approvals and other land-use permits from the City. The Parties will use the Schematic Design phase to test and validate or adjust the Program.
Schematic Design Drawings. Developer shall prepare and submit to Authority and the County Board its Schematic Design Drawings for Phase I. October 31, 2014 Definitive Agreement Submission. Developer shall submit to Authority for its review a definitive Hotel Operator Agreement and Equity Investment Agreement for the hotel/retail development between Developer and Hotel Operator. October 31, 2014 Requirement Deadline Fully Executed Agreements Developer shall submit to Authority copies of the following fully executed definitive agreements (i) Hotel Management Agreement with SBE Hotel Group, LLC; and (ii) Limited Liability Company Operating Agreement of RS Grand Ave. Holdings, LLC. as required by Section 3 (ii) of the November 2014 Letter Agreement to which this Parcel Q Schedule of Performance is attached. January 15, 2015 Review and Approval – Schematic Design Drawings. Authority and the County Board shall review and approve or disapprove the Schematic Design Drawings. February 16, 2015 Meet and Confer - Public Space Improvements. Developer and Authority to meet and confer regarding Public Space Improvements per Section 4.4(b) of the Fourth Amendment to DDA. February 15, 2015 to March 16, 2015
Schematic Design Drawings. 1. Produce two (2) defined options of preliminary drawings depicting:
i. Defined site layout with dimensions of parking stalls, driveways, and building envelope, including trash enclosure, emergency generator, fencing, etc.
ii. Building layout (including future programs), with room names, walls, doors, and major equipment identified.
iii. 2D Exterior Building Elevation line drawings.
Schematic Design Drawings. In accordance with the Plan Schedule, Developer, at its cost and expense, shall submit the Schematic Design Drawings to City for its review and approval. Within ten days after City receives the Schematic Design Drawings, City shall deliver to Developer written notice that it approves or rejects the Schematic Design Drawings; provided that, if City rejects all or any part of the Schematic Design Drawings, then such notice shall: (i) specify the part or parts that City is rejecting; and (ii) include the specific basis for such rejection. Upon approval of the Schematic Design Drawings, the Schematic Design Drawings shall be the final schematic design drawings with respect to construction of the Project, subject to modifications by Change Orders.
Schematic Design Drawings. The Developer shall prepare and submit Schematic Design Drawings, along with outline specifications, which generally describe the project design for the Site and which are more specific and detailed than the Concept Plan and the Master Plan. The submittal shall illustrate how the Project addresses and resolves the urban design and development objectives, criteria and issues related to the development of the Site consistent with the Scope of Development, the Concept Plan and the Master Plan. The submittal shall include the phasing plan and the refined delineation of parcel boundaries for the Project improvements and phasing, on- and off-site improvements, any easements, and schematic architectural and landscape design drawings (site plan, ground level building plans, floor and roof plans, building elevations and sections, signage, landscape/hardscape scheme, pedestrian plazas and other elements, vehicular and pedestrian access and circulation, parking, site lighting and site perimeter treatment) showing among other details as pertinent, the location, type, size and quality of materials, design treatments and features. A schematic Art Plan shall be included which shall indicate the design, location and artist of all components of the submittal. The Schematic Design Drawing submittal shall include sufficient detail and all related documents required to obtain land use entitlements for the Project from the City as well as any other related documents reasonably required by the Agency.
Schematic Design Drawings. The Developer shall cause the Schematic Design Drawings to Logically Evolve from the approved Concept Drawings. For purposes of this Agreement, the term “Logically Evolve” means a change that is an adaptation, refinement or amplification of previously-approved drawings. The Developer shall cause the Schematic Design Drawings to include bedroom sizes, floor plans, elevations, features in common or public areas, landscape features, locations for signs, parking facilities with all spaces indicated, and major building materials under consideration, potential exterior materials, the colors and textures to be used, and any off-site public improvements to be implemented by Developer. The Developer shall cause the Schematic Design Drawings to show key interior and exterior dimensions and a detailed tabulation of the floor area by use.
Schematic Design Drawings. Redeveloper shall prepare Schematic Drawings for the Phase One Redeveloper Public Improvements and the Phase Two Redeveloper Public Improvements to be constructed by Redeveloper on the Redevelopment Project Site. The Schematic Drawings shall show all Redeveloper Public Improvements for each phase be made on the Redevelopment Project Site as each Phase proceeds. The Schematic Drawings of the Redeveloper Public Improvements shall be submitted to the City for approval and shall be reviewed and approved by the Director of Urban Development and Public Works department for conformance with the Project, the Redevelopment Plan, and this Agreement. Such Schematic Drawings shall also be submitted to the Historic Preservation Commission for its review and approval.