Phase II - Design Development. 2.3.1 After receiving approval from Owner and based on the approved Schematic Design Documents and any adjustments authorized by Owner in the Project Scope, Project Schedule or Project Budget, the Consultant shall prepare, submit and present for review by Owner and Construction Manager and approval by the Owner, Design Development Phase documents, comprised of the SREF requirements for Design Development documents and the following: .1 "Project Transmittal Form" as required by the Facilities and Construction Management Division's Design Section.
Phase II - Design Development. Phase II requirements in relation to the State of Florida Department of Education and School Board of Broward County Building Department, shall be included as part of the Phase III 50% Construction Document submission. All Phase II requirements included in this agreement shall not be submitted as an independent submittal, and shall have no percentage of total fee associated with the development or progress of Phase II requirements.
Phase II - Design Development. 2.3.1 Only after receiving a fully approved and executed ATP and Purchase order (See 5.2.3), from Owner and based on the approved Schematic Design Documents and any adjustments authorized by Owner in the Project Scope, Project Schedule or Project Budget, the Consultant shall prepare, submit and present for review and approval by the Owner, Design Development Phase documents, comprised of the SREF requirements for Design Development documents and the following: .1 "Project Transmittal Form" as required by the Facilities and Construction Management Division's Design Section. .2 OEF form 208 (a) "OEF Space Chart Form" formatted to follow the sequence of spaces listed in the SREF Size of Space and Occupant Design Criteria Table.
Phase II - Design Development. 2.3.1 Only after receiving a fully approved and executed ATP and Purchase order (See 5.2.3), from Owner and based on the approved Schematic Design Documents and any adjustments authorized by Owner in the Project Scope, Project Schedule or Project Budget, the Consultant shall prepare, submit and present for review by Owner and Construction Manager and approval by the Owner, Design Development Phase documents, comprised of the SREF requirements for Design Development documents and the following: .1 "Project Transmittal Form" as required by the Facilities and Construction Management Division's Design Section. .2 OEF form 208 (a) "OEF Space Chart Form" formatted to follow the sequence of spaces listed in the SREF Size of Space and Occupant Design Criteria Table.
Phase II - Design Development. 2.3.1 After written Authorization to Proceed from Owner and based on the approved Schematic Design Documents and any adjustments authorized by Owner in the Project Scope, Project Schedule or Project Budget, the Consultant shall prepare, submit and present for review by Owner and Construction Manager and approval by the Owner, Design Development Phase documents, comprised of the SREF requirements for Design Development documents and the following: .1 "Project Transmittal Form" as required by the Facilities and Construction Management Division's Design Section. .2 OEF form 208 (a) "OEF Space Chart Form" formatted to follow the sequence of spaces listed in the SREF Size of Space and Occupant Design Criteria Table.
Phase II - Design Development. 2.2.1 Based on the approved Schematic Design documents and any adjustments in the Project, schedule, and/or construction budget, as authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner Design Development documents consisting of drawings and other documents to fix and describe the size and character of the Project as to the Architect/Engineer, structural, civil, landscape, mechanical, and/or electrical engineering, recommended material, and such other elements that might be deemed appropriate for the Project.
2.2.1.1 Design Development documents shall not be delivered all at one time, but rather on an ongoing basis for use by the Owner and the GC.
2.2.2 The Architect/Engineer shall advise the Owner of any adjustment to the preliminary estimate of construction cost.
Phase II - Design Development. During this phase, the Contractor shall prepare design development documents which includes contract drawings (Revision 0 set) and other documents. The design development documents define the Contractor’s scope of work.
Phase II - Design Development. 3.04.01 After written Notice to Proceed from Contract Administrator and based on the approved Schematic Design Documents and any adjustments authorized by the Contract Administrator in the Project Scope or Project Budget, Consultant shall prepare, submit and present for approval by the Contract Administrator, Design Development Phase documents, comprised of the following:
(A) “Project Transmittal Form" as required by County's Construction Management Division.
(B) Drawing and Specification Documents including, in addition to Phase I requirements, the following:
1) Civil site plan(s) showing, in addition to Phase I site survey requirements, landscaping, drainage, water retention ponds, sewage disposal and water supply system, chilled water supply and return piping and such physical features that may adversely affect or enhance the safety, health, welfare, visual environment, or comfort of the occupants.
2) A statement, signed and dated by Consultant or designated Subconsultant, included on the site plan identifying the number of existing trees, the number of required trees, and the number of new trees to be planted.
3) Soil testing results including a copy of the Geotechnical Engineer's report on the site including soil borings and other testing necessary to determine the subsurface conditions on site. When unusual soil conditions or special foundation problems are indicated, submit the proposed method of treatment and any recommendations for additional special testing.
4) Floor plan(s) including, but not be limited to, the following:
a. A floor plan drawn at an architectural scale that will allow the entire facility to be shown on one sheet, without breaklines and which indicates project phasing as applicable to the Project.
b. Floor plans drawn at 1/8 inch or larger scale showing occupied spaces or special rooms with dimensions, equipment and furnishing layouts, sanitary facilities, stairs, elevators, and identification of accessible areas for the disabled.
c. A furniture and equipment plan at an architectural scale that will allow the entire facility (or respective floor of a multi-story building) on a single drawing sheet.
d. Floor plans for additions to an existing facility: Indicate the connections and tie-ins to the existing facilities, including all existing spaces, exits, plumbing fixtures and locations, and any proposed changes thereto. Distinguish between new and existing areas for renovation, remodeling, or an addition.
e. Large scale plans (at a...
Phase II - Design Development a. Provide detailed Equipment and Furnishing Schedules: In addition to those preliminary furniture and equipment schedules required as Basic Services, provide listing of at least three sources for each furniture type from vendors listed on state and local contracts or purchasing agreements. Provide documentation for each furniture item which includes manufacturer's and/or vendor discounts, installation and freight costs, dimensions, finishes available, furniture features, pricing and furniture lead times.
Phase II - Design Development. 2.2.1 Based on the approved Schematic Design documents and any adjustments in the Project, schedule and/or construction budget, as authorized by the Owner, the Architect shall prepare, for approval by the Owner Design Development documents consisting of drawings and other documents to fix and describe the size and character of the Project as to the architectural, structural, civil, landscape, mechanical, and/or electrical engineering, recommended material, and such other elements that might be deemed appropriate for the Project.