Phase II - Final Design Sample Clauses

Phase II - Final Design. 2.3.1 The Engineer shall submit to the Director within ten days of any Notice to Proceed for Phase II, the Project Schedule updated to reflect firm dates for the beginning and end of each activity set forth therein and the review dates for such activities.
AutoNDA by SimpleDocs
Phase II - Final Design. Based upon approved preliminary design Documents and any further adjustments in the scope or quality of the Project authorized by the Director, Phase II services include, but are not limited to, the following:
Phase II - Final Design. 2.3.1 The engineering and design plans shall be developed in accordance with the latest edition and revisions of the State’s Highway Design Division Operations and Procedures Manual or the American Association of State Highway and Transportation Official’s A Policy on Geometric Design of Highways and Streets, the Department of Transportation’s 1993 Standard Specifications for Construction of Highways, Streets and Bridges, federal regulations for conformity with the Clean Air Act air quality requirements, the EPA-National Pollutant Discharge Elimination System requirements, the Texas Accessibility Standards of the Architectural Barriers Act, and the Texas Manual on Uniform Traffic Control Devices, hereinafter collectively referred to as ”TxDOT Specifications”.
Phase II - Final Design. 1.1.1 The Engineer shall provide overlay and curb ramps quantities and cost estimates. The Engineer shall develop graphic curb ramp layout design sketches over photographs and a graphical limit of the overlay.

Related to Phase II - Final Design

  • Final Design A.4.1. Provide OWNER with proposed final construction drawings and detailed opinions of probable total Project construction costs in writing for OWNER' s review, prior to completion of the final Contract Documents, so that any changes that may be necessary in accordance with Project' s budgetary schedule can be made prior to bid.

  • Commencement of Final Design This contract does not obligate the State to proceed with final design for any alternative. On completion of environmental documentation, the State will consider all reasonable alternatives in a fair and objective manner. Notwithstanding anything contained elsewhere in the contract or in any work authorization, the Engineer may not proceed with final design until after all relevant environmental decision documents have been issued.

  • Final Design Phase A. After acceptance by Owner of the Preliminary Design Phase documents, revised opinion of probable Construction Cost as determined in the Preliminary Design Phase, and/or any other Right of Way plan documents, subject to any Owner-directed modifications or changes in the scope, extent, character, or design requirements of or for the Project, and upon written authorization from Owner, Engineer shall:

  • Notice to Proceed - Site Improvements The Recipient shall not commence, or cause to be commenced, any site improvements or other work on the Land until the Director has issued a Notice to Proceed to the Recipient. Such Notice to Proceed will not be issued until the Director is assured that the Recipient has complied with all requirements for the approval of a grant under Revised Code Sections 164.20 through 164.27 and has completed any land acquisition required by the Project. A Notice to Proceed shall be required for all Project prime contractors or direct procurement initiated by the Recipient following execution of this Agreement.

  • Asset Improvement 5. (a) The Bank shall not, directly or indirectly, extend or renew any credit to or for the benefit of any borrower, including any related interest of the borrower, who is obligated to the Bank in any manner on any extension of credit or portion thereof that has been charged off by the Bank or classified, in whole or in part, “loss” in the Report of Examination or in any subsequent report of examination, as long as such credit remains uncollected.

  • PUBLIC IMPROVEMENT DISTRICTS If the Property is in a public improvement district,

  • Final Certificate, Design Professional’s Certificate of Final Completion The Certificate issued by the Design Professional stating that all work has been completed in accordance with the terms of the Contract Documents. See Section 6,

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • ROAD WORK PHASE APPROVAL Purchaser shall obtain written approval from the Contract Administrator upon completion of each of the following phases of road work:  Drainage installation  Subgrade compaction  Rock compaction SUBSECTION RESTRICTIONS

  • School Improvement Plan As permitted under IC § 20-10.2-3-1.5, the Charter shall serve as the Charter School's strategic and continuous school improvement and achievement plan (hereafter, the "School Improvement Plan"). To the extent that IC § 20-10.2 applies to the Charter in its function as the School Improvement Plan, the Organizer shall comply with the requirements under IC § 20-10.2.

Time is Money Join Law Insider Premium to draft better contracts faster.