Preliminary Monitoring Plan Sample Clauses

Preliminary Monitoring Plan. (All Applications >=30 kW and/or projects paired with on-site renewable generators) Two-Step Applications should also include all applicable Proof of Project Milestone Documents (as outlined in Section 5.4.2) as part of their Reservation Request
AutoNDA by SimpleDocs
Preliminary Monitoring Plan. (All Applications >=30 kW and/or projects paired with on-site renewable generators) The preliminary monitoring plan should demonstrate the following components: Description of the proposed SGIP system: Description of the system with an overview of the energy services to be provided by the system to the host site; the major components making up the system; and the intended operation of the system (e.g., demand charge management of the facility or specific end-use equipment, TOU energy arbitrage, shifting excess renewable generation, etc.); Include photos and/or diagrams of the system if available. A description of the existing load at the Site and identification of the sources of the fuel that would be displaced by operation of the SGIP system (i.e., electricity provided by XYZ utility or natural gas provided by ABC utility) and photos of the interface locations where the SGIP system would be located to displace the load. Description of the metering system and metering approach: An overview of the performance data to be collected and a simplified layout of the system showing major components and location of the proposed metering points and data to be collected at those points is required. Description of the approach to be used for collecting, storing and transferring the necessary performance data: • For example, if electrical energy performance data is to be collected, the reasoning behind the selected metering points • Frequency with which the data is to be collected (e.g., 15 min intervals) • Data storage capability and approach for transfer of data (e.g., cell modem) and frequency of reporting to PDP (e.g., daily, weekly) [this could also include frequency for reporting of data to Program Administrators, such as monthly] Identification of the metering system components by performance data type (including manufacturer and model number) • Electrical metering equipment (AC meters must be listed on the CEC’s list of Eligible System Performance and Revenue Grade Meters to be found on xxxx://xxx.xxxxxxxxxxxxxxxxx.xx.xxx/equipment/index.html) • Thermal energy metering equipmentData acquisition (i.e., logger) system Systems Pairing with On-site Renewable Generators: Energy storage systems paired with on-site renewable generators must provide a description of: • The anticipated charge and discharge schedule of the system demonstrating that the system complies with ITC operational requirements or, for projects not claiming the ITC, will be charged at least 75%...
Preliminary Monitoring Plan. (All 3-Step Applications >=30 kW) 6.
Preliminary Monitoring Plan. (All 3 Step Applications >=30 kW) The preliminary monitoring plan should demonstrate the following components: Description of the proposed SGIP system: Description of the system with an overview of the energy services to be provided (e.g., generation, waste heat recovery, storage, etc.) by the system to the host site; the major components making up the system; and the general operating schedule of the system (e.g., is it 24x7x365 or 10x6x365, etc.); Include photos of the system if available. Break out subsystems such as waste heat recovery systems in order to provide context for thermal energy metering systems. Provide similar descriptions for other important subsystems such as energy storage when combined with wind systems. A description of the existing load at the Site and identification of the sources of the fuel that would be displaced by operation of the SGIP system (i.e., electricity provided by XYZ utility or natural gas provided by ABC utility) and photos of the interface locations where the SGIP system would be located to displace the load. Description of the metering system and metering approach: An overview of the performance data to be collected (e.g., electrical, useful thermal energy, fuel consumption, etc.) and a simplified layout of the system showing major components (e.g. generator, waste heat recovery, storage etc.) and location of the proposed metering points and data to be collected at those points (i.e. electrical, flow, temp, fuel etc.) is required. Two Step Applications will include (as part of their Reservation Request) a Proposed Monitoring Plan as outlined in Section 6.10.2.

Related to Preliminary Monitoring Plan

  • Monitoring Plan keep up with the objectives from the cadetship practice booklet; taking daily notes as well as learning new information every day; currently reporting to the supervisor. Evaluation plan: the final result should be in accordance with the traineeship’s aims and objectives, achieving an improvement of specialty knowledge and language skills. The level of language competence9 in English that the trainee already has or agrees to acquire by the start of the mobility period is: A1 ☐ A2 ☐ B1 ☐ B2 ☒ C1 ☐ C2 ☐ Native speaker ☐ Table B - Sending Institution Please use only one of the following three boxes: 10 The traineeship is embedded in the curriculum and upon satisfactory completion of the traineeship, the institution undertakes to:Award ……...…ECTS credits (or equivalent)11 Give a grade based on: Traineeship certificate ☒ Final report ☒ Interview ☐ Record the traineeship in the trainee's Transcript of Records and Diploma Supplement (or equivalent). Record the traineeship in the trainee's Europass Mobility Document: Yes ☒ No ☐ The traineeship is voluntary and, upon satisfactory completion of the traineeship, the institution undertakes to: Award ECTS credits (or equivalent): Yes ☐ No ☐ If yes, please indicate the number of credits: …. Give a grade: Yes ☐ No ☐ If yes, please indicate if this will be based on: Traineeship certificate ☐ Final report ☐ Interview ☐ Record the traineeship in the trainee's Transcript of Records: Yes ☐ No ☐ Record the traineeship in the trainee's Diploma Supplement (or equivalent). Record the traineeship in the trainee's Europass Mobility Document: Yes ☐ No ☐ The traineeship is carried out by a recent graduate and, upon satisfactory completion of the traineeship, the institution undertakes to: Award ECTS credits (or equivalent): Yes ☐ No ☐ If yes, please indicate the number of credits: …. Record the traineeship in the trainee's Europass Mobility Document (highly recommended): Yes ☐ No ☐ Accident insurance for the trainee The Sending Institution will provide an accident insurance to the trainee (if not provided by the Receiving Organisation/Enterprise): Yes ☐ No ☒ The accident insurance covers: - accidents during travels made for work purposes: Yes ☐ No ☒ - accidents on the way to work and back from work: Yes ☐ No ☒

  • Preliminary Engineering In order to receive City review and approval of the Extensions, Developer shall furnish two (2) copies of the plat map, topographic map and proposed roads profile sheets in electronic format prior to the City’s ordering of the engineering plans from its Engineer. The contour elevation and road profile elevations shall be referenced to NAVD ‘88 datum. In the event Developer’s engineer prepares the construction plans and specifications, the above information shall be a part of the extension construction plans to be reviewed and approved by the City’s Engineer. The final plat map shall be to the scale of 1-inch = 20 feet. The contour map shall have a scale of 1-inch = 20 feet and contour intervals of two (2) feet or less. The road profile sheets shall be to the scale of 1-inch = 20 feet. Developer shall provide a minimum of one benchmark, datum being NAVD ‘88, on the project site; and the elevation and location of the benchmark shall be indicated on the maps furnished by Developer.

  • Preliminary Evaluation Site evaluation and planning functions should proceed concurrently with the accomplishment of Schematic Design, Design Development, and Construction Documents. The Design Professional shall conduct a preliminary review of the site based on information furnished by the Owner. The Design Professional will advise the Owner of potential site-related problems that the Design Professional notes from such review.

  • Implementation Schedule TIME IS OF THE ESSENCE with regard to all dates and time periods set forth and/or incorporated herein. Any material modification or deviation from an approved schedule described in this Agreement shall occur only upon approval of the City and RDA, with any such approvals required to be in writing as an amendment to this Agreement, and which approvals shall not be unreasonably withheld. City shall cooperate and act promptly with respect to any and all permits or approvals necessary for completion of the Project. Notwithstanding the above, this Agreement shall not limit the discretion of the City, or any of its duly appointed and authorized governing bodies, boards or entities, in approving or rejecting any aspect of the Project or improvements contemplated on or about the Property.

  • Preliminary Design § 4.3.1 Upon the Owner’s issuance of a written consent to proceed under Section 4.2.3, the Design-Builder shall prepare and submit a Preliminary Design to the Owner. The Preliminary Design shall include a report identifying any deviations from the Owner’s Criteria, and shall include the following:

  • Project Implementation Manual The Recipient, through the PCU, shall: (i) take all action required to carry out Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4 (ii) of the Project in accordance with the provisions and requirements set forth or referred to in the Project Implementation Manual; (ii) submit recommendations to the Association for its consideration for changes and updates of the Project Implementation Manual as they may become necessary or advisable during Project implementation in order to achieve the objective of Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4(ii) of the Project; and (iii) not assign, amend, abrogate or waive the Project Implementation Manual or any of its provisions without the Association’s prior agreement. Notwithstanding the foregoing, if any of the provisions of the Project Implementation Manual is inconsistent with the provisions of this Agreement, the provisions of this Agreement shall prevail and govern.

  • Construction Progress Schedule A schedule indicating proposed activity sequences and durations, milestone dates for receipt and approval of pertinent information, preparation, submittal, and processing of Shop Drawings and Samples, delivery of materials or equipment requiring long-lead time procurement, and proposed date(s) of Material Completion and Occupancy and Final Completion. The schedule will be developed to represent the sixteen or seventeen CSI Specification Divisions. It shall have a minimum number of activities as required to adequately represent to Owner the complete scope of work and define the Project’s critical path and associated activities. If the Project is to be phased, then each individual Phase should be identified from start through completion of the overall Project and should be individually scheduled and described, including any Owner’s occupancy requirements and showing portions of the Project having occupancy priority. The format of the schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, Material Completion and Occupancy Date, final inspection dates, Punchlist, and Final Completion date.

  • Preliminary Schedule A preliminary schedule of construction indicating the starting and completion dates of the various stages of the Work, including any information and following any form as may be specified in the Specifications. Once approved by District, this shall become the Construction Schedule. This schedule shall include and identify all tasks that are on the Project’s critical path with a specific determination of the start and completion of each critical path task as well as all Contract milestones and each milestone’s completion date(s) as may be required by the District.

  • Preliminary Design Phase During the Preliminary Design Phase, the CONSULTANT shall, if requested by the CITY and accepted by the CONSULTANT as part of a Services Authorization:

  • Construction Progress Schedule; Overall Project Schedule The Contractor shall submit for review by the Design Professional and approval by the Owner a Construction Progress Schedule based upon the Design Professional’s Preliminary Design and Construction Schedule and prepared using a CPM (Critical Path Method) process within sixty days after the Effective Date of the Contract, utilizing a full-featured software package in a form satisfactory to the Design Professional and Owner, showing the dates for commencement and completion of the Work required by the Contract Documents, including coordination of mechanical, plumbing, and electrical disciplines, as well as coordination of the various subdivisions of the Work within the Contract. Milestones must be clearly indicated and sequentially organized to identify the critical path of the Project. The Construction Schedule will be developed to represent the CSI specification divisions. It shall have the minimum number of activities required to adequately represent to the Owner the complete scope of Work and define the Project’s (and each Phase’s if phased) critical path and associated activities. The format of the Construction Progress Schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, inspections for Material Completion and Occupancy Date, and Final Completion Date. The Contractor shall submit, along with the Construction Progress Schedule, the Submittal Schedule for approval by the Design Professional, correlating the associated approval dates for the documents with the Construction Progress Schedule. Upon recommendation by the Design Professional and approval by the Owner, the Construction Progress Schedule shall become the Overall Project Schedule, which shall be utilized by the Design Professional, Owner and Contractor. The Contractor must provide the Design Professional and the Owner with monthly updates of the Overall Project Schedule indicating completed activities and any changes in sequencing or activity durations, including approved change orders. See also Article 3.3.5.