Site Readiness Sample Clauses

Site Readiness. The Buyer shall notify the Seller in writing on the exact date when the Equipment may be installed at least 4 weeks prior to such date, ensuring that the deadline for the performance hereunder is maintained. The Buyer shall invite the Seller, with sufficient advance prior to the Equipment installation, to inspect the premises into which the Equipment will be installed, so that any potential defects or deficiencies may be removed prior to installation pursuant to Section 4.1. The Buyer shall be obliged to allow the Seller, once the deadline set forth in Section 8.1 hereof expires, to install the equipment at the place of performance. The Buyer reserves the right to extend the installation deadline by a written notification to the Seller (delivered to the address specified in 1.2 hereof), if organizational reasons on his part warrant so.
AutoNDA by SimpleDocs
Site Readiness. Site readiness describes the minimum Site requirements related to circuit entrance and/or demarcation extension, power (including an alternative or power source), environmental, ground, security, and overall Site preparations for a successful installation of Business Wi-Fi. Customer is responsible for all negotiations, permits and communications with the building owner/leasing agent as it relates to Site construction and readiness, including but not limited to: (i) notifying Sprint and the LEC when all Site readiness requirements have been met and (ii) providing a suitable environment for equipment based on manufacture specifications. Business Wi-Fi requires a consistent power source. Therefore Customer must provide a back-up power source via generator, uninterrupted power supply, or other conventional backup/conditioning devices.
Site Readiness. ONG cannot construct facilities until “Site Readiness” is achieved. A construction site for a new facility (i.e. new building) is ready when: Site development permit with limits of construction inclusive of gas installation per the ONG Design Map (Exhibit A) is obtained from appropriate agency; grading and staking are complete; water and wastewater systems, and all dry utilities have been installed; and area for gas installation per the ONG Design Map is clear and accessible. A construction site for an existing facility that requires relocation, replacement, or a new service is ready when: staking is complete; area for the gas installation per the ONG Design Map is clear and accessible; owner has notified tenants of work; and traffic control has been coordinated, if applicable. If applicable for commercial sites, the external plumbing kick out must be installed and desired riser location marked.
Site Readiness. 28 • Validate System for production use. • Conduct operational readiness assessment. 29 • Ensure all items on Go Live readiness checklist have been completed prior to Go Live. 30 • Manage site communication plan. 31 • Create Go Live schedule for COUNTY resources in conjunction with the contractor. 32 • Provide command center for Go Live period.
Site Readiness. The Project Site, the Shared Facilities, and the Property shall be fully energized.
Site Readiness a) It is the developer's responsibility to notify SWS if the site layout / design are amended and/or any circumstances or conditions on site change subsequent to an accepted Offer. b) SWS reserves the right to revoke, at any time any Offer and to re-estimate and issue a revised Offer (and amend the Agreement) should it become aware subsequently that the proposed installation for any mains and/or services traverses through ground that is considered by SWS to be of an artificial construction and/or is found to be contaminated and/or it materially differs from the basis upon which the Offer was made. c) The Offer is made based on the final accepted version of the developer‟s site layout drawing and the number of units to be developed and occupied. d) In the event that the developer fails to install ducts in accordance with SWS‟s final approved mains and services design (drawing referenced as detailed in the Offer letter) or the developer‟s subsequent actual site installation differs from the approved design SWS shall re-measure and recalculate the Offer in accordance with its published charges.
Site Readiness. If the Subcontractor enters onto a job site that has not been cleaned by the prior xxxxxxx, the Subcontractor shall contact Contractor immediately by sending email to the project specific email address listed in the Project Release. Subcontractor’s email shall detail the site conditions or substrate deficiencies and the necessary cleanup. If Subcontractor does not notify Contractor of any site conditions or substrate deficiencies immediately and commences work, Subcontractor assumes all responsibilities or additional costs. It is the Subcontractor’s responsibility to ensure that the site is ready for the next Trade. If the site is not left in the condition that allows the next Trade to effectively perform their work, Subcontractor will be responsible for any additional costs incurred by Contractor or next Trade related to improving the condition of the site to a workable state. Contractor will provide written notification allowing 24 hours for Subcontractor to correct the site conditions. By commencing work under this Master Agreement, the Subcontractor accepts the site conditions as previously performed by others and the existing substrates.
AutoNDA by SimpleDocs
Site Readiness. If the Subcontractor enters onto a job site that has not been cleaned by the prior xxxxxxx, the Subcontractor shall contact Contractor immediately, and the cleanup due to the prior work shall be the responsibility of Contractor. If Subcontractor is unable to contact Contractor, the Subcontractor shall make a written list of the necessary clean up, and submit the list to Contractor. If Contractor is not contacted as provided above, the Subcontractor shall be responsible for cleaning up the job site in preparation for its own work including scraps, leftover materials and waste from both the prior work and the Subcontractor’s work. By commencing work under this Master Agreement, the Subcontractor accepts the cleanup work as previously performed by others and the existing substrate.
Site Readiness. Successful bidder shall intimate details of the team carrying out the installation and take prior permission for carrying out the installation works.
Site Readiness. Contractor shall provide requirements for site readiness to District at least thirty (30) days prior to installation. Contractor is required to advise District of any special considerations, including but not limited to: (a) space restrictions, e.g., vibrations, electromagnetic, radiation, heat, dust, etc.; (b) known compatibility issues with other equipment.