Deliverables for Construction and Bidding Documentation Sample Clauses

Deliverables for Construction and Bidding Documentation. Memo / maps and drawings summarizing the following information: • All contract documents necessary to construct the project and conform to permit revisions, including any land use drawings required with cost estimates at 30% and 60% design development and 30% and 90% construction documents including existing conditions survey, utility, erosion control plans and details, materials plan, layout and grading plan, planting design, irrigation, details, stormwater, architectural plan, sections, elevations, perspectives/, building floor plan and technical specifications, supplemental conditions and special provisions. • Drawings required for Building PermitsBid period addenda and clarifications as necessary Meeting Attendance and participation: • Regular meetings with the project and construction managers • Meetings as needed to obtain land use and building permits • Pre−bid meeting(s) Task 5: Construction Administration and Close-out Construction administration Provide construction administration services and production of CAD record drawings in CAD from the construction contractor's as−built information. This will include attendance at pre− construction meetings, weekly project meetings, and site visits during construction, fabrication plant, nursery, and quarry visits as required in the project specifications, additional site visits if necessary for problem solving, review and approval of shop drawings, submittals (including completeness review), samples and mockups, Requests for Information (RFIs) responses, issuance of Architect’s Supplemental Instructions (ASIs), communication with the construction contractor through PP&R construction manager or project manager, with PP&R construction manager, and with PBOT and BDS inspectors, monitoring the construction contractor’s performance, providing clarification to construction documents as necessary, substantial completion walk through and punchlist, and final completion walk through and punchlist. LEED™ Coordination and Documentation. For the applicable new, occupied buildings: • LEED™ project registration and submittal of the LEED™ application with the Green Building Certification Institute. DKa • Coordinate and document LEED™ green design aspects of the project. Construction close-out Provide all final electronic drawings such as: permit drawings, construction documents, as−built drawings and other necessary drawings in PP&R’s required formats. Task 5: Deliverables for Construction Administration and Close-ou...
AutoNDA by SimpleDocs

Related to Deliverables for Construction and Bidding Documentation

  • Coordination of Design and Construction Contract Documents 5.5.1 Review model(s), Drawings, Specifications and other Construction Documents as they are developed by A/E during the Schematic Design, Design Development, and Construction Documents design phases of the Project.

  • SUPERVISION AND CONSTRUCTION PROCEDURES 4.3.1 The Contractor shall supervise and direct the Work, using his / her best skill and attention. The Contractor shall be solely responsible for all construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Contract. All aspects of the Project shall be subject to the inspection and approval of the State. Contractor guarantees to repair, replace, re-execute or otherwise correct any defect in workmanship, materials, or the like that fails to conform to the requirements of this Contract or that appears during the progress of the Work or within one year of final acceptance by the State.

  • Implementation Specifications 1. The accounting shall contain the date, nature, and purpose of such disclosures, and the name and address of the person or agency to whom the disclosure is made.

  • Notification of Modifications of Licensed Materials From time to time Publisher may add, change, or modify portions of the Licensed Materials, or migrate the Licensed Materials to other formats. When such changes, modifications, or migrations occur, the Licensor shall give notice of any such changes to Licensee as soon as is practicable, but in no event less than sixty (60) days in advance of modification. Such a notice may also be given directly by the Publisher to the Licensee. If any of the changes, modifications, or migrations renders the Licensed Materials substantially less useful to the Licensee, the Participating Institutions or their Authorized Users, the Licensee may seek to terminate this Agreement for breach pursuant to the termination provisions of this Agreement in Section XI, below.

  • CONTRACTOR’S SUBMISSION OF CONTRACT MODIFICATIONS In connection with any Contract modification, OGS reserves the right to:  request additional information  reject Contract modifications  remove Products from Contract modification requests  request additional discounts for new or existing Products

  • BUILDER’S RISK FOR CONSTRUCTION RENOVATION PROJECTS If the project is CONSTRUCTION RENOVATION of an existing structure, and the State has already determined that Contractor will not be obligated to obtain and maintain Builder’s Risk insurance, then the following provisions apply:

  • Design and Construction In complying with the requirements of the specification both with respect to arrangement and detail, design is to conform to the best current engineering practice. Each of the several parts of the material is to be of the maker’s standard design provided that this design is in general accordance with the specification. The essence of design should be simplicity and reliability in order to give long continuous service with high economy and low maintenance cost. Particular attention should be paid to internal and external access in order to facilitate inspection, cleaning and maintenance. The design dimensions and materials of all parts are to be such that they will not suffer damage as a result of stresses under the most severe conditions. Fully detailed specifications of the several parts of the material are to be submitted describing particularly the materials to be used. The materials used in the construction of the material are to be of the highest quality and selected particularly to meet the duties required of them. Mechanisms are to be constructed to avoid sticking due to rust or corrosion. Workmanship and general finish are to be of the highest class throughout. All similar parts of the material are to be interchangeable. All equipment is to operate without undue vibration and with the least possible amount of noise and is not to cause a nuisance. All equipment is to be designed to minimize the risk of fire and any damage, which may be caused in the event of fire. The equipment is also to be designed to prevent ingress of all vermin, accidental contact with live parts and to minimize the ingress of dust and dirt. The use of materials, which may be liable to attack by termites or other insects, is to be avoided.

  • Intellectual Property Rights in Construction Documents, Drawings, and Models The drawings, Specifications and other documents prepared by the Design Professional pursuant to this Contract (including, without limitation, the Construction Documents), are the property of the Owner, whether or not the Project for which they are made commences or completes construction. Neither the Contractor nor any Subcontractor or material or equipment supplier shall own or claim a copyright in such drawings, Specifications, and other similar or related documents; Owner shall retain all common law, statutory, and other intellectual property rights with respect thereto. The Contractor must deliver remaining copies of such documents to the Owner upon request or upon completion of the Work, except that the Contractor may keep one copy of such documents for its files. The Contractor shall only use such drawings, Specifications and other documents for this Project. Neither the Contractor nor any Subcontractor or material or equipment supplier may use such drawings, Specifications, and other documents on other projects without the specific written consent of the Owner. All models are the property of the Owner.

  • Effect of Addenda, Bulletins, and Change Orders No special implication, interpretation, construction, connotation, denotation, import, or meaning shall be assigned to any provision of the Contract Documents because of changes created by the issuance of any (1) Addendum, (2) Bulletin, or (3) Change Order other than the precise meaning that the Contract Documents would have had if the provision thus created had read originally as it reads subsequent to the (1) Addendum, (2) Bulletin, or (3) Change Order by which it was created.

  • Deliverables Upon satisfactory completion of the work authorization, the Engineer shall submit the deliverables as specified in the executed work authorization to the State for review and acceptance.