Electrical Work Sample Clauses
Electrical Work. No employee shall repair or replace defective circuit breakers in power supply boxes, without first having the service disconnected. This shall not apply to plug in or bus type circuit breakers.
Electrical Work. 1.3.1 All power wiring in Mechanical Rooms, Electric Rooms and Telephone rooms must be in EMT.
Electrical Work. On-site portable electrical apparatus and electric lighting are preferred to be supplied at 110 volts by means of mains isolation transformers with the secondary wiring centre tapped to earth. If for any reason this is not practicable, safe working procedures must be agreed with the Trustees.
Electrical Work. All electrical work shall only be for electrical panels located within the Premises. Additional service requirements shall be secured only by direction of Landlord.
Electrical Work. Contractor sign. No Of Correction Executive Engineer 25333144) ¨É½þÉ®úɹ]Åõ ¶ÉɺÉxÉÉSªÉÉ ºÉÉ´ÉÇVÉÊxÉEò ¤ÉÉÆvÉEòÉ¨É JÉÉiªÉÉEòbä÷ ªÉÉäMªÉ iªÉÉ ´ÉMÉÉÇiÉÒ±É xÉÉånùhÉÒEÞòiÉ EÆòjÉÉ]õnùÉ®úÉÆEòbÚ÷xÉ JÉɱÉÒ±É XxX¨XXXXx®xXxXX ¤X-0 xX¨XXxxXXxXX±X ÊxÉÊ´ÉnùÉ <-Ç ÊxÉÊ´ÉnùÉ |ÉhÉɱÉÒuùÉ®äú (+ÉìxɱÉÉ<ÇxÉ) ¨ÉÉMÉÊ´ÉiÉ +ɽäþiÉ. Gò.ò EòɨÉÉSÉä xÉÉ´É EòɨÉÉSÉÒ +ÆnùÉÊVÉiÉ ËEò¨ÉiÉ <ºÉÉ®úÉ/ ¤ÉªÉÉhÉÉ ®úCEò¨É EòÉ¨É {ÉÖhÉÇ Eò®úhªÉÉSÉÉ EòɱÉÉ´ÉvÉÒ <Ç ÊxÉÊ´ÉnùÉ ºÉÆSÉÉSÉÒ ËEò¨ÉiÉ Class of Contractor 1 Est. No. KESD / O.W. / 5520 / 2018-19, Providing Solar LED Street Light for Jetti,Chauthara, & Boat Repairing Yard at ZAI sea face area Tal- Talasari Dist- Palghar. Rs. 12,08,561/- Rs 12,100/- 2 MONTH (60 Days ) Rs. 500/- + GST 12% ( CGST 6% Rs.30/- + SGST 6% Rs.30/- = 60/- )Total Rs 560/- Bidder should be Registered Electrical Contractor with PublicWorks Electrical Department, Government of Maharashtra in Class “ D ”and above and having consent letter from Original Equipment Manufacturer/ Distributor of Solar PV System with experience of satisfactorily completion of such type of work in Govt./ semi Govt. Building. ( Reputed manufacturer of Solar PV System ) Ê]õ{É :-
Electrical Work. 6.1 The Proponent is currently planning to install Electrical Infrastructure below-grade within the Road Allowances identified in Schedule “A” and the County agrees that such Road Allowances shall be available for Electrical Infrastructure, subject to the County’s approval of specific Plans as provided in Section 5.
6.2 The Parties acknowledge and agree that the Proponent, when undertaking the Electrical Work, will install Electrical Infrastructure below-grade within the Road Allowances except where the Proponent in consultation with the County identifies environmental, topographical or other features, obstacles, or circumstances that, in the opinion of the Proponent acting reasonably, require the installation of poles or other above-grade Electrical Infrastructure to permit the transmission of electricity over, around or across such feature or obstacle. Any Plans submitted by the Proponent in connection with Electrical Work shall identify the locations in which the Proponent proposes to install above-grade Electrical Infrastructure and shall set out the reasons therefor.
6.3 The Proponent further agrees to make commercially reasonable efforts to install the Electrical Infrastructure:
(a) in appropriate locations between the outer limit of the travelled portion of the relevant Road Allowance and the property line of the Road Allowance;
(b) at appropriate depths and/or elevations within the relevant Road Allowance so as to avoid conflicts with other existing infrastructure; and
(c) in consistent locations within the Road Allowances such that the number of road crossings is minimized.
6.4 The Proponent agrees at its sole expense to:
(a) xxxx the location of Electrical Infrastructure installed by the Proponent within the Road Allowances with appropriate markings;
(b) participate in the “Ontario One Call” system to facilitate ongoing notice to the public of the location of the Electrical Infrastructure; and
(c) upon request of the County through its officials or authorized agents, or otherwise, properly and accurately identify the location of any Electrical Infrastructure within the Road Allowance, such reports to identify the depth of the relevant portion of the Electrical Infrastructure, such request to be made in writing to the Proponent with advance notice of fifteen (15) days prior to the County or a third party commencing work that may conflict with the Electrical Infrastructure.
6.5 The Parties agree and acknowledge that the Proponent shall from time to...
Electrical Work a. The Registered Practitioner shall (check one):
b. If neither of these options is checked, the second option shall be deemed checked if electrical work is included in Exhibit A otherwise the first option shall be deemed checked.
Electrical Work. All electrical work shall be approved from the unit space electrical panel only. Additional service requirements shall be. secured only by direction of Landlord. Tenant shall use Landlord's original electrical contractor.
Electrical Work. Lessee shall not perform any electrical work or make any modification to any electric outlet on the Premises and, if any such work or connection is required, Lessee first will obtain County approval, and have such work done and such connection made by the person, firm or corporation selected by County and at Lessee’s expense.
Electrical Work. Tenant shall furnish and install all rough and finished electric work from the service termination pull box at the rear of the Demised Premises. Tenant shall be responsible for providing electrical conduits, wiring and boxes in the concrete floor topping prior to placing of concrete floor by Landlord. Tenant shall furnish all electrical fixtures, including lighting fixtures, exit lights, emergency lighting system, lamps and equipment and installation thereof. Tenant shall furnish and install all systems, where required, for telephone conduit to the space from the telephone/meter room; inter-communication, music, antenna, material handling or conveyor, burglar alarm, vault wiring, fire alarm and communication, time switches, contractors and all necessary disconnect switches for all motors required by Tenant. The criteria are shown on Exhibits C-1 (U2), C-1 (Y) and E.