Temporary Construction Facilities. Temporary restrooms will be provided at various locations on the site. Also available will be a jobsite trailer for managing the project. Security fencing will be utilized as required to maintain a safe and secure jobsite.
Temporary Construction Facilities. Unless otherwise specified, the following temporary construction facilities must be provided and maintained by the Contractor throughout the construction period and removed at the completion of the Work:
a. Field Offices. Unless otherwise specified in the Detailed Specifications, the Contractor must provide a temporary building or mobile type field office of such size and containing such equipment as the Contractor deems necessary to conduct the operations. The field office must be provided with a telephone for Contractor's superintendent during the entire period of construction. The telephone must be removed promptly upon Final Completion and Acceptance of the Work.
Temporary Construction Facilities. The Seller shall provide all temporary facilities required to construct the facility, including the items noted below. All temporary facilities shall be removed as required or upgraded to meet the final plant requirements. Installation and maintenance of temporary construction access road Installation and maintenance of construction parking and construction laydown areas Construction trailers and facilities as required by construction, testing, inspection, engineering, supervision, management, and other personnel Use of or improvement of existing railroad spur close to the facility to allow off-loading of equipment, if required. Improvements to existing roads to transport equipment from the available spur to the site (if applicable). Improvements to existing roads to transport equipment to the site, either temporary for construction purposes or permanent to support plant maintenance and operation activities. Construction of temporary drainage facilities Providing temporary erosion control during earthwork Final grading and cleanup after the Facility is essentially complete Restoration of all areas affected by the construction of access road, parking, and laydown areas following project completion (as required by Seller’s agreements) Adequate space shall be provided for Seller-provided temporary trailer(s) for Purchaser’s construction and operation staff. Trailers shall be equipped with temporary furnishing, HVAC, and set up for phone and high-speed internet access during plant construction and commissioning until turnover. The trailers shall be located on site, in close proximity to the power block construction and to the Contractor’s and Seller’s management and supervisory personnel trailers.
Temporary Construction Facilities. Duke Realty shall establish and construct temporary construction facilities as necessary to manage and coordinate the work. The facilities shall consist of, but are not necessarily limited to, the following: • Construction office trailer • Temporary construction communications • Temporary power and water • Sanitary facilities • Facsimile and reprographic machines • Temporary safety and public protection barricades/enclosures • Trash dumpster for construction debris • Temporary enclosures for weather protection • Construction material storage areas • Project identification signs Excessive accumulation of waste materials and debris will be avoided by periodic clean up of the building and construction site. When the building is substantially completed, we will remove all debris, tools, scaffolding, equipment, and surplus materials, and leave the building in a "wiped clean" condition. We will clean all of the exterior windows, vacuum all carpeting, damp mop all ceramic and vinyl composition tile flooring, clean all bathroom mirrors, fixtures and toilet partitions. Aerial photos will be taken each month to record the progress of construction. Copies of aerial progress photos will be provided to the Tenant. Duke Realty will retain the services of a land surveyor to establish the building control for construction of the building. Upon project completion, Duke Realty will provide the Owner three (3) binders and the Tenant one (1) binder containing complete copies of the operating and maintenance instructions for all the building equipment and systems. Copies of material and equipment warranties and guarantees will be included. As-built documentation will be provided to the Owner and Tenant in both hard copy and electronic format.
Temporary Construction Facilities. The Design/Builder shall establish and construct temporary construction facilities as necessary to manage and coordinate the construction work. The facilities shall consist of, but are not limited to the following.
Temporary Construction Facilities. The contractor at various locations on the site will provide temporary restrooms. A job site trailer will be furnished with telephone, computer, printer, fax machine, and conference room.
Temporary Construction Facilities. The Certificate Holder proposes to operate up to three gravel quarries, one rock crusher, and one concrete batch plant during construction of the Project (Temporary Construction Facilities). The Certificate Holder shall comply with the following conditions regarding these facilities:
Temporary Construction Facilities. Unless otherwise specified, you must provide and maintain the following temporary construction facilities throughout the construction period and remove them at the completion of the Work:
a. Field Offices. Unless otherwise specified, you must provide a temporary building or mobile type field office of such size and containing such equipment as you deem necessary to conduct the operations. The field office must be provided with a telephone for your superintendent and a pay telephone for use by others during the entire period of construction. The telephone must be removed promptly upon Final Completion and Acceptance of the Work. Unless otherwise specified, you must supply a field office for the City's Superintendent consisting of a separate office facility. It must be of adequate size for efficient operations and be furnished with a desk, three chairs, 4-drawer file cabinet and a plan table. It must be equipped with electric lighting, heating, ventilating and cooling facilities. You must provide a separate telephone for City Superintendent's use. You must also provide and maintain in clean condition for Superintendent’s use, including toilet facilities, having a water closet and laboratory fixture connected to sanitary sewer and water service. Temporary toilet facilities must be located in the City's Superintendent's trailer and comply with City and State regulations relating to health and sanitation. The toilet facility must be serviced twice weekly and kept stocked with toilet paper, soap, and paper towels.
Temporary Construction Facilities. 14.1 Subcontractor shall supply adequate facilities for temporary construction aids (storage, warehousing, tool cribs, and fabrication shops) as required to perform the work associated with this Subcontract.
14.2 Subcontractor is responsible for the installation, maintenance, and removal of all temporary construction facilities. Temporary construction facilities shall be constructed and maintained per all applicable Federal, State, and Local building codes and ordinances.
Temporary Construction Facilities. All temporary services and facilities required for construction purposes shall be furnished solely by the Contractor, at no additional cost to the City.