Remedies for Late Delivery Sample Clauses

Remedies for Late Delivery. Supplier shall use commercially reasonable efforts to deliver all Products on or before the Delivery Date as set forth in Section 4.3 above. If Supplier fails to deliver Products within 14 days of the Delivery Date and if such delay is not due to any action or inaction of S&W or otherwise excused in accordance with this Agreement, S&W shall receive a 10% discount on such Order or S&W may, at its sole discretion, cancel its Order for such Products by giving Supplier written notice of such cancelation prior to shipment of the Products for such Order and procure similar products from another source. Subject to S&W’s rights under this Section 4.5, no delay in the shipment or delivery of any Products relieves S&W of its obligations under this Agreement, including accepting delivery of any remaining installment or other Orders of Products.
AutoNDA by SimpleDocs
Remedies for Late Delivery. A. The Contractor understands that Inmarsat intends to procure Launch services for the Spacecraft in reliance on the delivery schedule specified in Article 4 hereof, entitled Performance Schedule. Therefore, the Contractor accepts that time is of the essence of this Contract, and that delayed delivery by the Contractor may cause Inmarsat to incur additional costs, including launch service postponement fees, loss of anticipated revenue, and other damages difficult or impossible to measure. The Contractor agrees to be subject to the liquidated damages provided for in this Article, and further agrees that such liquidated damages are intended to be compensatory and do not constitute a penalty. B. With reference to the definition of “Spacecraft” in Article 1 hereof, entitled Definitions, and for the avoidance of doubt, this Article shall also apply to all equipment and services associated with the Spacecraft and necessary to support the Launch campaign. C. Subject to Paragraph B of Article 12 hereof, entitled Corrections in Unlaunched Spacecraft, Article 17 hereof, entitled Consequences of Force Majeure, and Article 31 hereof, entitled Changes, if the milestone deadlines referred to below or the Spacecraft delivery deadlines specified in Article 4, entitled Performance Schedule are not met, the Contractor shall be subject to the following liquidated damages. These amounts are firm, fixed and not subject to adjustment due to changes in economic conditions. The Contractor’s liability under this paragraph shall not exceed the aggregate of these specified liquidated damages. **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** **** D. If delays to Spacecraft are such that the Launch Vehicle agency re-manifests the Spacecraft, the Contractor shall provide free storage of the Spacecraft until the next available Launch opportunity on the same Launch Vehicle or, if earlier, any replacement Launch Vehicle that Inmarsat procures subject to Paragraph E of this Article. UNLESS otherwise directed by Inmarsat, such storage services shall be provided free of charge but otherwise in accordance with Paragraph B of Article 33 hereof, entitled Option to Store Spacecraft. The Contractor’s liability for liquidated damag...
Remedies for Late Delivery. A. The Contractor understands that Inmarsat intends to procure Launch services for the Spacecraft in reliance on the delivery schedule specified in Article 4 hereof, entitled Performance Schedule. Therefore, the Contractor accepts that time is of the essence of this Contract, and that delayed delivery by the Contractor may cause Inmarsat to incur additional costs, including launch service postponement fees, loss of anticipated revenue, and other damages difficult or impossible to measure. The Contractor agrees to be subject to the liquidated damages provided for in this Article, and further agrees that such liquidated damages are intended to be compensatory and do not constitute a penalty. B. With reference to the definition of “Spacecraft” in Article 1 hereof, entitled Definitions, and for the avoidance of doubt, this Article shall also apply to all equipment and services associated with the Spacecraft and necessary to support the Launch campaign. C. In the event that the Delivery of the Spacecraft is later than its delivery date as set forth in Paragraph F below where such delay is not subject to an extension of time pursuant to Paragraph A of Article 12 hereof, entitled ESA Access and IPR Rights and Delivery of TDPs by ESA, Article 17 hereof, entitled Consequences of Force Majeure, and Article 31 hereof, entitled Changes, the Contractor agrees to pay to Inmarsat, as liquidated damages, for each day of lateness, the following amounts: - **** * Portions of this document marked with **** have been omitted pursuant to a request for confidential treatment submitted with the SEC. The original contracts have been filed separately with the SEC as part of the confidential treatment request. 7 November 2007 Inmarsat / Astrium Proprietary & Confidential Information Page: 20 - **** - **** - **** - **** - **** - **** **** D. If delays to Spacecraft are such that the Launch Vehicle agency re-manifests the Spacecraft, the Contractor shall provide free storage of the Spacecraft until the next available Launch opportunity on the same Launch Vehicle or, if earlier, any replacement Launch Vehicle that Inmarsat procures subject to Paragraph E of this Article. UNLESS otherwise directed by Inmarsat, such storage services shall be provided free of charge but otherwise in accordance with Annex O hereof, entitled Other Options. The Contractor’s liability for liquidated damages for the Spacecraft under Paragraph C of this Article shall cease at the time the Spacecraft is availab...
Remedies for Late Delivery. If Continental does not deliver, or there are reasonable grounds to believe that Continental will not deliver, [HW Gen] Components in accordance with the scheduled Delivery Dates, Continental shall immediately notify Aurora, or if pursuant to an OEM Order, both Aurora and the OEM, take all necessary actions to ensure timely deliveries and if applicable propose a revised Delivery Date, and Aurora or the OEM may, at its option, do one or more of the following: (a) accept the revised Delivery Date; or (b) require Continental to deliver [HW Gen] Components using priority freight delivery with incremental freight charges at Continental’s sole cost and expense.
Remedies for Late Delivery. If there is a Late Delivery (other than Bulk Product), then, without limiting any other remedies available hereunder and for clarity, not subject to or counted towards the caps set forth in Section 10.1, the following consequences shall apply: COA delivery up to [*****] after COA Target Date [*****] COA delivery [*****] after COA Target Date Batch at [*****] discount COA delivery [*****] after COA Target Date Batch at [*****] discount COA delivery [*****] after COA Target Date Batch at [*****] discount or [*****] For Bulk Product, the COA Target Date will be mutually agreed upon by Parties based on the actual data on the PSD-7 from the validation batches as modified by the Parties from time to time based on historical data. The Grace Period shall be agreed by mutual agreement of the Parties taking into account the need to further process the Bulk Product and the applicable stability data at the time. If the COA is delivered after the Grace Period, Acorda may reject the Batch and Manufacturer shall provide a replacement batch.
Remedies for Late Delivery. For the purposes of this Article 00X, Xxxxxxxx may only issue such a notice prior to and in respect of any of the following milestones as specified in Annex D hereto entitled Payment Plan: SAS1 Equipment Shipment, SAS1 Factory Acceptance Test Review, SAS1 Site Acceptance Test Review and Final Acceptance.
Remedies for Late Delivery. Without prejudice to any other remedies available to Inmarsat, with respect to late delivery by Contractor (for the avoidance of doubt, save in the event of Excusable Delay or Force Majeure) in breach of the schedule requirements in Article 3 hereof, entitled Performance Schedule, and as defined in Annex A and B hereto, entitled Statement of Work and SRS. The following procedures and remedies shall apply: (1) In case Factory Acceptance (FAT) is delayed, the Contractor shall be liable for liquidated damages in the amount of 0.10% of the Price for each day of delay of FAT in accordance with Article 6 hereto, entitled Final Acceptance. Such liquidated damages shall accrue up-to a total amount of 2.5% of the Price. (2) The liquidated damages set out in (1) above shall accrue up to and including the date of successful FAT or termination by Inmarsat pursuant to Article 20 hereto, entitled Termination. During the period when liquidated damages are accruing, the Contractor shall not be liable for any other damages with respect to such delay, except as explicitly stated to the contrary in this Contract. (3) In case SAT 1 acceptance is delayed, the Contractor shall be liable for liquidated damages in the amount of 0.10% of the Price for each day of delay of SAT 1 acceptance in accordance with Article 6 hereto, entitled Final Acceptance. Such liquidated damages shall accrue up-to a total amount of 2.5% of the Price.
AutoNDA by SimpleDocs
Remedies for Late Delivery. 6.6.1 If Continental does not deliver, or there are reasonable grounds to believe that Continental will not deliver, [HW Gen] Components in accordance with the scheduled Delivery Dates, Continental shall immediately notify Aurora, or if pursuant to an OEM Order, both Aurora and the OEM, take all necessary actions to ensure timely deliveries and if applicable propose a revised Delivery Date, and Aurora or the OEM may, at its option, do one or more of the following: (a) accept the revised Delivery Date; or (b) require Continental to deliver [HW Gen] Components using priority freight delivery with incremental freight charges at Continental’s sole cost and expense. 6.6.2 If Aurora concludes in its reasonable discretion or if Aurora is informed by OEMs that the remediation steps in Section 6.6.1 above are insufficient, and the delay is [***], then Aurora may, at its option, cancel or authorize OEMs to cancel, all or any portion of the [HW Gen] AD Kits ordered without liability to Aurora, and the applicable binding forecast [***] shall be amended accordingly to reflect such canceled Orders. 6.6.3 If Aurora concludes in its reasonable discretion (subject to the Dispute Resolution Process) or if Aurora is informed by OEMs that the remediation steps provided in Sections 6.6.1 and 6.6.2 above are insufficient, and the delay is [***], Continental shall pay Aurora [***] (the “Liquidated Damages Amount”) as a reasonable estimate of the damages given the impact of any delay in delivery, and the fact that the precise amount of actual damages are difficult to ascertain at the Effective Date. Continental shall pay the Liquidated Damages Amount within [***] from the date of an Aurora invoice. [***]. In the event such delayed [HW Gen] Components subject to Liquidated Damages Amount affect the binding forecast [***], such affected binding forecast [***] shall be amended accordingly. To clarify, Liquidated Damages Amount will not apply to the extent the delay is due to a Force Majeure Event (including supply chain disruptions caused by a Force Majeure Event); provided that Continental has complied with the disaster recovery and business continuity plan set forth in Appendix P (Continental Disaster Recovery and Business Continuity Plans) and that the applicable binding forecast [***] shall be amended accordingly to reflect any canceled Orders due to Force Majeure Events. 6.6.4 The Delivery Date in each Order will constitute a separate delivery requirement. Delivery Date reliabi...
Remedies for Late Delivery 

Related to Remedies for Late Delivery

  • Remedies for Default (a) Enterprise Services’ rights to suspend and terminate Contractor’s rights under this Master Contract are in addition to all other available remedies. (b) In the event of termination for default, Enterprise Services may exercise any remedy provided by law including, without limitation, the right to procure for all Purchasers replacement goods and/or services. In such event, Contractor shall be liable to Enterprise Services for damages as authorized by law including, but not limited to, any price difference between the Master Contract price and the replacement or cover price as well as any administrative and/or transaction costs directly related to such replacement procurement – e.g., the cost of the competitive procurement.

  • Remedies for Non-Compliance The Recipient agrees that if FTA determines that the Recipient or a Third Party Participant receiving federal assistance under 49 U.S.C. chapter 53 is not in compliance with 49 C.F.R. part 655, the Federal Transit Administrator may bar that Recipient or Third Party Participant from receiving all or a portion of the federal transit assistance for public transportation it would otherwise receive.

  • REMEDIES, ETC CUMULATIVE. Each and every right, power and remedy of the Pledgee provided for in this Agreement or in any other Secured Debt Agreement, or now or hereafter existing at law or in equity or by statute shall be cumulative and concurrent and shall be in addition to every other such right, power or remedy. The exercise or beginning of the exercise by the Pledgee or any other Secured Creditor of any one or more of the rights, powers or remedies provided for in this Agreement or any other Secured Debt Agreement or now or hereafter existing at law or in equity or by statute or otherwise shall not preclude the simultaneous or later exercise by the Pledgee or any other Secured Creditor of all such other rights, powers or remedies, and no failure or delay on the part of the Pledgee or any other Secured Creditor to exercise any such right, power or remedy shall operate as a waiver thereof. No notice to or demand on any Pledgor in any case shall entitle it to any other or further notice or demand in similar or other circumstances or constitute a waiver of any of the rights of the Pledgee or any other Secured Creditor to any other or further action in any circumstances without notice or demand. The Secured Creditors agree that this Agreement may be enforced only by the action of the Pledgee, in each case acting upon the instructions of the Required Lenders (or, after the date on which all Credit Document Obligations have been paid in full, the holders of at least a majority of the outstanding Other Obligations) and that no other Secured Creditor shall have any right individually to seek to enforce or to enforce this Agreement or to realize upon the security to be granted hereby, it being understood and agreed that such rights and remedies may be exercised by the Pledgee for the benefit of the Secured Creditors upon the terms of this Agreement.

  • Remedies for Noncompliance In the event Contractor fails to fulfill its obligations under this Section 21, the Authority shall have available to it appropriate remedies at law or in equity, including the right to withhold amounts due to Contractor for any work until Contractor submits a corrective action plan which has been approved by the Authority or demonstrates to the Authority’s satisfaction that all good faith efforts to comply with the goals set forth herein have been exhausted, together with the ability to disqualify Contractor from future work that may, from time to time, be undertaken by the Authority as well as all unfinished work under this Contract.

  • Other Remedies; Specific Performance Except as otherwise provided herein, any and all remedies herein expressly conferred upon a party will be deemed cumulative with and not exclusive of any other remedy conferred hereby, or by law or equity upon such party, and the exercise by a party of any one remedy will not preclude the exercise of any other remedy. The parties hereto agree that irreparable damage would occur in the event that any of the provisions of this Agreement were not performed in accordance with their specific terms or were otherwise breached. It is accordingly agreed that the parties shall be entitled to an injunction or injunctions to prevent breaches of this Agreement and to enforce specifically the terms and provisions hereof in any court of the United States or any state having jurisdiction, this being in addition to any other remedy to which they are entitled at law or in equity.

  • Remedies; Specific Performance The Company stipulates that there would be no adequate remedy at law to the Holder of this Warrant in the event of any default or threatened default by the Company in the performance of or compliance with any of the terms of this Warrant and accordingly, the Company agrees that, in addition to any other remedy to which the Holder may be entitled at law or in equity, the Holder shall be entitled to seek to compel specific performance of the obligations of the Company under this Warrant, without the posting of any bond, in accordance with the terms and conditions of this Warrant in any court of the United States or any State thereof having jurisdiction, and if any action should be brought in equity to enforce any of the provisions of this Warrant, the Company shall not raise the defense that there is an adequate remedy at law. Except as otherwise provided by law, a delay or omission by the Holder hereto in exercising any right or remedy accruing upon any such breach shall not impair the right or remedy or constitute a waiver of or acquiescence in any such breach. No remedy shall be exclusive of any other remedy. All available remedies shall be cumulative.

  • Remedies for Events of Default If an Event of Default, as defined in the Indenture, occurs and is continuing, the Trustee or the Holders of not less than 25% in principal amount of the Notes then outstanding may declare all the Notes to be immediately due and payable. If a bankruptcy or insolvency default with respect to the Company or any of its Significant Subsidiaries occurs and is continuing, the Notes automatically become immediately due and payable. Holders may not enforce the Indenture or the Notes except as provided in the Indenture. The Trustee may require indemnity satisfactory to it before it enforces the Indenture or the Notes. Subject to certain limitations, Holders of at least a majority in principal amount of the Notes then outstanding may direct the Trustee in its exercise of any trust or power.

  • Remedies for Contractor Breach Pertaining to contract-related issues, it is the responsibility of both CMHA and the contractor to communicate with each other in as clear and complete a manner as possible. If at any time during the term of this contract CMHA or the contractor is not satisfied with any issue, it is the responsibility of that party to deliver to the other party communication, in writing, fully detailing the issue and corrective action (please note that CMHA has the right to issue unilateral addendums to this contract, but the contractor does not have the same right). The other party shall, within 10 days, respond in writing to the other party (however, CMHA shall retain the right to, if conditions warrant, require the contractor to respond in a shorter period of time). Further, CMHA shall, at a minimum, employ the following steps in dealing with the contractor as to any performance issues: 20.16.1.1. If the contractor is in material breach of the contract, CMHA may promptly invoke the termination clause detailed within Section No. 3, form HUD-5370-C, General Conditions for Non-Construction Contracts, Section I—(With or without Maintenance Work), which is attached hereto, and terminate the contract for cause. Such termination must be delivered to the contractor in writing and shall fully detail all pertinent issues pertaining to the cause of and justification for the termination. 20.16.1.2. Prior to termination, CMHA may choose to warn 20.16.1.3. After termination, if the contractor does not agree with CMHA’s justification for the termination, the contractor shall have 10 days to dispute, in writing, such action; if he/she does not do so within the 10-day period, he/she shall have no recourse but to accept and agree with CMHA’s position on the issue. The written protest must detail all pertinent information pertaining to the dispute, including justification detailing CMHA’s alleged incorrect action(s). 20.16.1.4. The response to any protest received shall be conducted in accordance with Section No. 4.0 of this document. 20.16.1.5. It is CMHA’s policy to resolve all contractual issues informally and without litigation. Disputes will not be referred to HUD unless all administrative remedies have been exhausted. When appropriate, a mediator may be used to help resolve differences. 20.16.1.6. For contracts of $100,000 or less, the bidder/contractor may request to meet with the Procurement Officer. 20.16.1.7. All claims by a contractor relating to performance of a contract shall be submitted in writing to the Procurement Officer or designee for a written decision. The contractor may request a conference on the claim. The Procurement Officer’s decision shall inform the contractor of its appeal rights to the next higher level of authority in CMHA. Contractor claims shall be governed by the Changes clause in the form HUD-5370-C.

  • Remedies for Title Defects (a) With respect to each Title Defect that Seller does not cure on or before the Closing, except as otherwise provided in this Section 3.05, the Purchase Price shall be reduced by an amount equal to the Title Defect Value agreed upon in writing by Buyer and Seller or, if Buyer agrees, Seller shall indemnify Buyer pursuant to Section 14.04 against all costs which Buyer may incur in connection with such Title Defect. If any Title Defect is in the nature of an unobtained consent to assignment or other restriction on assignability, the provisions of Section 3.08 shall apply. (b) Except for those affected Assets which Seller elects to exclude from this transaction pursuant to Section 3.04(b)(ii), if on or before Closing the Parties have not agreed upon the validity of any asserted Title Defect or have not agreed on the Title Defect Value attributable thereto, either Party shall have the right to elect to have the validity of such Title Defect and/or such Title Defect Value determined by an Independent Expert pursuant to Section 16.03; provided that if the validity of any asserted Title Defect, or the Title Defect Value attributable thereto, is not determined before Closing, the affected Asset shall be excluded from the sale and the Purchase Price shall be reduced by the Allocated Value of such affected Asset as set forth on Exhibit C. Upon resolution of such dispute, the Allocated Value of that Asset less the Title Defect Value, if any, found to be attributable to such Title Defect shall, subject to this Section 3.05, be paid by Buyer to Seller and the Asset conveyed to Buyer, if that is part of the mutually agreed settlement. (c) Notwithstanding anything to the contrary in this Agreement, (i) if the value of a given individual Title Defect (or individual Title Benefit (as defined in Section 3.09(a)) does not exceed $50,000 then no adjustment to the Purchase Price shall be made for such Title Defect (or Title Benefit), (ii) if the aggregate adjustment to the Purchase Price determined in accordance with this Agreement for Title Defects and Environmental Defects (as hereinafter defined) does not exceed three percent (3%) of the Purchase Price prior to any adjustments thereto, then no adjustment of the Purchase Price shall be made therefor and (iii) if the aggregate adjustment to the Purchase Price determined in accordance with this Agreement for Title Defects and Environmental Defects does exceed three percent (3%) of the Purchase Price prior to any adjustments thereto, then the Purchase Price shall only be adjusted by the amount of such excess.

  • Remedies; Waiver To the extent permitted by Law, all rights and remedies existing under this Agreement and any related agreements or documents are cumulative to, and are exclusive of, any rights or remedies otherwise available under applicable Law. No failure on the part of any party to exercise, or delay in exercising, any right hereunder shall be deemed a waiver thereof, nor shall any single or partial exercise preclude any further or other exercise of such or any other right.