CLASS OF WORK Sample Clauses

CLASS OF WORK. The laying and installation of all cables to trays or supports, using methods or materials appropriate to the Industry at the time.
AutoNDA by SimpleDocs
CLASS OF WORK. 6.4(a) The installation, termination, testing and commissioning, repair and maintenance of Datacomms systems.
CLASS OF WORK. Section A. HEAVY/HIGHWAY, UTILITY CONSTRUCTION, BUILDING CONSTRUCTION and ENVIRONMENTAL WORK: It is agreed that this Agreement shall apply to all Laborers on all construction work unless specifically exempted herefrom, and all public construction improvements such as roads, subways, tunnels, sewers, sewer disposal plants, streets, alleys, bridges, culverts, grade separations, subdivisions, airports, canals, levees, pavements, watermains and purification plants, pipelines with all connections and appurtenances thereto (located on public right-of- ways or easements thereto) locks, dams, golf courses, water towers, mine reclamation, railroads, communication towers and any environmental clean up on all of the above. Highway Construction shall include the construction of roads, streets, alleys, sidewalks, guard rails, fences, parkways, parking areas, airports, bridle paths, athletic fields, highway bridges, grade separations involving highways, light construction, sewage and waterworks improvements incidental to street and highway improvements. Work connected and related to the installation of imbedded reflectors in new and existing highways. Heavy and Utilities Construction shall include railroad construction projects, heavy construction and railroad bridges, heavy construction sewers and water mains, grade separations involving a railroad, foundations, pile driving, piers, abutments, retaining walls, viaducts, tunnels, subways, track elevation, elevated highways, drainage projects, sanitation projects, aqueducts, irrigation projects, flood control projects, reclamation projects, reservoirs, water supply projects, water power development, hydro-electric development, transmission lines, pipe lines, locks, dams, dikes, levees, revetments, channels, channel cut-offs, intakes, dredging projects, jetties, breakwaters, docks, harbors, industrial sites (excluding paving operations), excavation and disposal by contract of over burden and the loading by contract of all material from which the over burden has been removed, including the operation maintenance and repair of all land and floating plant, equipment, vehicles, and other facilities used in connection with serving the aforementioned work and services not including Building Construction. Building Construction: Building Construction shall include the construction of building structures, including modifications thereof, or additions or repairs thereto, intended for use for shelter, protection, comfort or convenien...

Related to CLASS OF WORK

  • OF WORK The normal hours of work for an employee are not a guarantee of work per day or per week, or a guarantee of days of work per week. The normal hours of work shall be seven and one-half (7%) hours per day, and seventy-five (75) hours in any period. The normal daily tour shall consist of seven and one-half hours, exclusive of a one-half hour unpaid meal period. Employees shall be entitled to a fifteen (15) minute paid break during each half of the normal daily tour, at a time designated by the Employer. Employees required for reporting purposes shall remain at work for a period of up to fifteen (15) minutes which shall be unpaid. Should the reporting time extend beyond fifteen ( I 5) minutes however, the entire period shall be considered for the purposes of payment. Requests for change in posted work schedules must be submitted in writing and by the employee willing to exchange days off or shifts and are subject to the discretion of the Administrator or her designate. In any event, it is understood that such a change initiated by the employee and approved by the Employer shall not result in overtime compensation or payment or any other claims on the Employer by an employee under the terms of this t Where there is a change to Daylight Savings from Standard Time or vice-versa, an employee who is scheduled and works a full shift shall be paid for a seven and one-half (7.5) hour tour rather than the actual hours worked. The Employer will endeavour to accommodate requests by employees for specific days off and also requests for changes in posted time schedules once the schedule has been posted. Shift schedules shall be posted two (2) weeks in advance and shall cover a minimum of a four (4) week period. The following shall apply to full-time employees: During each pay period, two (2) consecutive days off will be scheduled. Schedules may provide for more than (5) consecutive days of work, but not more than seven (7) consecutive days of work without days off, as long as four (4) days off are scheduled in each fourteen (14) day period. Except as outlined below, meal time of one-half hour shall be scheduled away from the floor during the employee's shift whether day, evening or night. Where there is only one registered employee on duty, it is recognized that this is not possible. Should an employee be recalled to duty during meal time, additional time shall be provided later in the shift.

  • Xxxxx of Work The Contractor shall provide information technology (IT) independent verification and validation (IV&V) services to Customers in accordance with this Statement of Work (SOW). The Contractor shall provide the professional and technical staff necessary to perform the ((IT) IV&V services required by this Contract, and the staff shall have sufficient skill and experience to perform the services assigned to them. All of the (IT) IV&V services to be furnished by the Contractor under the Contract shall meet the professional standard and quality that prevail among IT professionals in the same discipline and of similar knowledge and skill engaged in related work under the same or similar circumstances. The Contractor shall maintain during the term of the Contract all licenses, permits, qualifications, insurance, and approvals of whatever nature that are legally required to perform the (IT) IV&V services.

  • CONTRACTING OF WORK (i) Grievances charging a violation of the Company's express commitments set forth in Paragraphs (168)(a), (b) and

  • LAYOUT OF WORK The Contractor shall lay out its Work from base lines and benchmarks indicated on the Drawings, and shall be responsible for verification of all measurements in connection with the layout. The Contractor shall furnish all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the Work. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by Princeton University until authorized to remove them. If such marks are destroyed by the Contractor or through its negligence before their removal is authorized, Princeton University may replace them and deduct the expense of the replacement from any amounts due or to become due to the Contractor. CLAUSE C15 NOISE

  • REVIEW OF WORK The Consultant shall permit the City, its agents and/or employees to review, at any time, all work performed pursuant to the terms of this Agreement at any stage of the work;

  • UNCOVERING OF WORK 13.1.1 If any portion of the Work should be covered contrary to the request of the Architect or to requirements specifically expressed in the Contract Documents, it must, if required in writing by the Architect, be uncovered for his or her observation and shall be replaced at the Contractor's expense.

  • SUBCONTRACTING OF WORK If a Contractor chooses to subcontract the scheduled work, the prime Contractor is solely responsible to ensure that the subcontractor has the necessary insurance, licenses, ability to provide the contracted services and shall adhere to all requirements stated herein.

  • Cost of Work The Cost of Work will be adjusted and finalized as part of the Contract Sum in the GMP. The budget for the Cost of Work shall not exceed Five Million Three Hundred Six Thousand Eight Hundred Five and No/100 Dollars ($5,306,805.00).

  • Scope of Work The Contractor has overall responsibility for and shall provide and furnish all materials, equipment, tools and labor as necessary or reasonably inferable to complete the Work, or any phase of the Work, in accordance with the Owner’s requirements and the terms of the Contract Documents.

  • Rejection of Work Using the Notice of Non-Conforming Work procedures outlined in the General Conditions, the Design Professional shall reject work that does not comply with the requirements of the Contract Documents or that does not comply with the applicable laws and codes. The Design Professional shall have authority to order testing of the Work, as is provided in the Contract Documents or as otherwise required in its judgment, whether such work is fabricated, installed, or completed.