Furnished by Contractor Sample Clauses

Furnished by Contractor. The Contractor shall furnish all equipment, materials, services, labor, consumables and other items required to complete the Work that are not specifically listed as Owner-furnished. The Owner reserves the right to approve the source of supply and manufacturer of all materials furnished by Contractor which will enter into the permanent construction. Contractor shall not place orders for any materials of this type until the Owner has had the opportunity of exercising this option. The Contractor-furnished items include, but are not limited to: • All materials, equipment, labor, supervision and other services to perform the Work as shown in the Drawings and as specified. • All structural steel for any purpose, as shown in the Drawings. • All bulk piping materials less than 2” size. • All bulk electrical and instrument material (conduit, fittings, cable tray & accessories, wire, tubing, instrument valves, etc.). • Cement, concrete aggregate, ready-mixed concrete, non-shrink and epoxy grouts, sand, clam shell, form lumber, form clamps, form oil, treated timbers, nails and spikes, tie wires, reinforcing steel bars and mesh, chairs, bar supports, concrete hardener, waterproofing, expansion joint, and all embedded items in concrete. • Drill shaft materials, supplies, equipment of all type. • Water for drinking and sanitary purposes. • All fill, paving and landscaping materials, including sand for ditch, padding, special backfill, and crushed rock for equipment locations and drives as shown on drawings. • Welding equipment and all miscellaneous welding materials including welding rods, welding consumables and pre-heat equipment and fuel. • All tools and equipment necessary or required to complete the Work and all timbers or other materials required to store, move or erect pipe, piping, structures, and other facilities and equipment. • All expendable or consumable materials and supplies required for performance of the Work. • Survey services, personnel, equipment. • Temporary buildings and latrines, suitable in quantity, size and type for the use of class of service and shall be properly and regularly maintained by Contractor. If not covered by particular specifications or Codes they shall conform to the usual standards of the Owner. All such temporary structures shall be removed by Contractor upon completion of job. • All labor including supervision, skilled and common labor required and necessary to complete the project. • All tools, equipment and machinery necess...
AutoNDA by SimpleDocs
Furnished by Contractor. Except as stated in Section lV above and related attachments, and Contractor's qualifications (Attachment F) of it's proposal submission dated April 29, 2005, and subsequent revisions, Contractor shall furnish all material, labor, supervision, expendables, construction equipment, and tools necessary to design, fabricate, build and install the Plant, which is included as the responsibility of Contractor in the Documents.
Furnished by Contractor. Contractor shall supply or cause to be supplied the following temporary construction facilities and utilities to Subcontractor, without cost to Subcontractor, for or in connection with performance of the Work: (1) Sanitary Facilities - Furnished by Contractor shall consist of portable chemical toilets located at various areas of the jobsite as designated by Contractor based on average weekly manpower requirements. (2) Water for construction shall be furnished at points on jobsite as designated by Contractor's Project Superintendent. All backflow prevention, connections, valves, line extensions, freeze protection, traffic protection of lines, etc. is by Subcontractor. Note, Subcontractor is responsible for all costs and/or fines received for water losses attributable to connections or line extensions installed by Subcontractor at Contractor’s sole discretion of estimated water losses. Note, Subcontractor is responsible for providing and paying for all costs associated with temporary water means and methods necessary to complete the scope of work should water restrictions be placed on this Project. (3) Accessible space near the construction site for performance of the Work and daily temporary storage of material and equipment at time of that day’s installation. (No protective storage facilities, security, or protective coverings of any kind will be furnished by Contractor). (4) Subcontractor shall assume worst case accessibility and reach to each building structure for hoisting of materials based on present site conditions at time of delivery or installation. (5) Temporary Lighting in accordance with OSHA Standards will be provided by the Electrical Subcontractor. However it shall be the responsibility of Subcontractor to ensure that each craftsman on this project has adequate lighting in each room to do a "first class" job. Extension cords and light stands for lighting shall be the responsibility of Subcontractor. (6) Temporary Power - 110 volts, single phased, 60 cycle power shall be provided by the Electrical Subcontractor and made available throughout the building for small tools only. Power will not be available for electric welding machines or heavy duty saws. Portable panels or multiple outlets will be located on each floor within 100' of any work area by Electrical Subcontractor. This Subcontractor shall provide all OSHA approved extension cords as required for the execution of this Subcontract Agreement. All power cords and tools shall be protected ...
Furnished by Contractor. Except as expressly set forth in Section 4.2 of this Article, Contractor shall, as part of the Scope of Work, supply, install, and properly maintain, all items necessary for full and complete performance of the Work. Such items shall include, but not necessarily be limited to, those listed below. The items located at the jobsite shall be subject to and in accordance with the review and approval of Company. 4.1.1 One roving patrol vehicle and all hazard equipment including: light bars, spotlights and road flares. Vehicle fuel expenses will be billed to Company’s account.

Related to Furnished by Contractor

  • Information Furnished by BISYS BISYS has furnished to the Trust the following: (a) BISYS' Articles of Incorporation. (b) BISYS' Bylaws and any amendments thereto. (c) Certified copies of actions of BISYS covering the following matters: 1. Approval of this Agreement, and authorization of a specified officer of BISYS to execute and deliver this Agreement; 2. Authorization of BISYS to act as Transfer Agent for the Trust. (d) A copy of the most recent independent accountants' report relating to internal accounting control systems as filed with the Commission pursuant to Rule 17Ad-13 under the Exchange Act.

  • Services to be performed by Contractor In consideration of the payments set forth herein and in Exhibit “B,” Contractor shall perform services for County in accordance with the terms, conditions and specifications set forth herein and in Exhibit “A.”

  • Claim by Contractor After receipt of the Notice of Termination from the state, the Contractor shall submit any claim for additional costs not covered herein or elsewhere in the Contract within 60 days of the effective termination date, and not thereafter. Should the Contractor fail to submit a claim within the 60-day period, the State may, at its sole discretion, based on information available to it, determine what, if any, compensation is due the Contractor and pay the Contractor the determined amount.

  • Information Furnished by Underwriters The statements set forth in the last paragraph of the cover page and under the caption "Underwriting" in any Preliminary Prospectus and in the Prospectus constitute the written information furnished by or on behalf of the Underwriters referred to in Section 2 and Section 6 hereof.

  • Services to be Performed by Consultant The Parties agree that Consultant shall perform such services as are set forth and described in Exhibit A - Scope of Services and incorporated herein as if written word for word. All services provided by Consultant hereunder shall be performed in accordance with the degree of care and skill ordinarily exercised under similar circumstances by competent members of their profession. In case of conflict in the language of Exhibit A and this Agreement, this Agreement shall govern and control. Deviations from the Scope of Services or other provisions of this Agreement may only be made by written agreement signed by all Parties to this Agreement.

  • By Contractor Should the Contractor be liable for any payments to the State hereunder, interest, late payment charges and collection fee charges will be determined and assessed pursuant to Section 18 of the State Finance Law.

  • FURNISHED SERVICES The County agrees to: A. Guarantee access to and make provisions for the Contractor to enter upon public and private lands as required to perform their work. B. Make available all pertinent data and records for review. C. Provide general bid and Contract forms and special provisions format when needed.

  • SERVICES TO BE PROVIDED BY CONSULTANT 1.1 In compliance with all of the terms and conditions of this Agreement, CONSULTANT shall provide to ANAHEIM all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately supply the professional consulting services necessary for the Services when required by ANAHEIM. The Services are more particularly described in the General Scope of Work attached hereto as Exhibit A and incorporated herein by this reference (“General Scope of Work”). In addition to the General Scope of Work, the Services will also be described in a Request for Work Order Proposal (“RFWOP”) and in a Notice to Proceed, as described in Section 1.4. ANAHEIM may elect to delete certain tasks of the General Scope of Work or the RFWOP at its sole discretion. The Services will not be performed by the CONSULTANT until ANAHEIM selects CONSULTANT in accordance with this Section 1. If selected, CONSULTANT shall perform the Services as directed by ANAHEIM and in accordance with the RFWOP, the Notice to Proceed, and this Agreement. By entering into this Agreement, ANAHEIM does not guarantee CONSULTANT that ANAHEIM will select CONSULTANT to provide any Services under this Agreement. 1.2 When the Services are required, ANAHEIM will issue an RFWOP in writing or electronically for the project-specific Services, including a specific scope of work, schedule for completion of the Services, task specifications, name of the Project Administrator, and other data specific to that RFWOP. CONSULTANT shall submit, within the time stated in the RFWOP, a sealed Work Order Proposal (“Work Order Proposal”) indicating the cost, task completion schedule, and other information requested in that RFWOP. CONSULTANT shall submit an electronic sealed Work Order Proposal when it is required by the RFWOP, and CONSULTANT shall abide by all RFWOP electronic proposal requirements. 1.3 For any RFWOP with an anticipated fee : (i) under $50,000, ANAHEIM will send, in writing or electronically, the RFWOP to one (1) pre-qualified consultant, which may or may not include CONSULTANT; (ii) of $50,000 to $150,000, ANAHEIM will send, in writing or electronically, the RFWOP to up to three (3) pre-qualified consultants, which may or may not include CONSULTANT; (iii) of $150,000 and up to $250,00, ANAHEIM will send, in writing or electronically, the RFWOP to up to five (5) pre-qualified consultants, which may or may not include CONSULTANT. ANAHEIM does not give any guarantee to CONSULTANT that ANAHEIM will send such an RFWOP to CONSULTANT at any point during the term of this Agreement. If (a) ANAHEIM sends CONSULTANT an RFWOP and (b) CONSULTANT desires to be considered for the RFWOP, CONSULTANT shall submit, within the time stated in the RFWOP, a sealed Work Order Proposal indicating the cost, task completion schedule, and other information requested in that RFWOP. CONSULTANT shall submit an electronic sealed Work Order Proposal when it is required by the RFWOP, and CONSULTANT shall abide by all RFWOP electronic proposal requirements. 1.4 Selection of a prequalified consultant to complete the Services requested in any RFWOP shall be based on the criteria set forth herein. ANAHEIM will issue a Notice to Proceed (“Notice”) to the successful consultant who has submitted a Work Order Proposal. The Notice and the RFWOP shall constitute the “Work Order”. If CONSULTANT fails to promptly commence work and/or diligently pursue a Work Order as set forth therein, ANAHEIM may elect to terminate the Work Order or this Agreement. 1.5 CONSULTANT acknowledges that ANAHEIM may enter into agreements similar to this Agreement with other consultants. It is understood and agreed that a Work Order will be awarded to the prequalified consultant most qualified in ANAHEIM's opinion to provide services set forth in the RFWOP within the scheduled completion date based upon the following criteria: .01 Ability of the consultant to perform the specific tasks outlined in the RFWOP; .02 Qualifications of the specific individuals to perform the specific tasks outlined in the RFWOP; .03 Amount and quality of time key personnel will be involved in their respective portions of the Services outlined in the RFWOP; .04 Reasonableness of the fee requested to provide the Services outlined in the RFWOP; .05 Demonstrated record of success by the consultant on work previously performed for ANAHEIM or for other municipalities or enterprises and .06 The specific methods and techniques to be employed by the consultant in providing the Services outlined in the RFWOP. 1.6 In the event of conflicting provisions, the provisions shall govern in the following order: (1) the Notice to Proceed; (2) the RFWOP; (3) CONSULTANT’s Work Order;

  • Services to be Furnished by Landlord Provided Tenant is not in default under any of the provisions of this Lease, and subject to reimbursement pursuant to Section 4.02 above, Landlord shall provide the following services during standard hours of operation of the Building. These standard hours of operation are 7 a.m. to 7 p.m., Monday through Friday, and 8 a.m. to 1 p.m., on Saturdays. (a) Public utilities shall be caused to furnish the Premises with electricity and water utilized in operating any and all facilities serving the Premises; (b) Hot and cold water at those points of supply provided for general use of other tenants in the Building, central heat and air conditioning;20 (c) Routine maintenance, painting and electric lighting service for all Common Areas and special service areas of the Building in the manner and to the extent deemed by Landlord to be standard and consistent with the operation and maintenance of the Building as a first-class office building in the Central Business District (CBD) of 21; (d) Janitorial service on a five (5) day week basis, excluding Saturdays, Sundays and legal holidays; (e) 22 If any electrical equipment installed23 requires air conditioning capacity above that provided by the building standard system, then the additional air conditioning installation and corresponding operating costs will be the separate obligation of the Tenant; (f) Initial lamps, bulbs, starters and ballasts used within the Premises; and (g) Security for the Building; provided, however, Landlord shall not be liable to Tenant or any employee, invitee, licensee or sublessee of Tenant for losses due to theft or burglary, or for damages done by unauthorized persons in the Building. In the event Tenant desires any of the aforementioned services in amounts in excess of those24 and in the event Landlord elects to provide these additional services, Tenant shall pay Landlord as Additional Rent hereunder the cost of providing these additional services. Failure by Landlord to any extent to furnish any of the above services, or any cessation thereof, resulting from causes beyond the control of Landlord, shall not render Landlord liable in any respect for damages to either person or property, nor shall that event be construed as an eviction of Tenant, nor result in an abatement of Rent, nor relieve Tenant from any of Tenant’s obligations hereunder (including, but not limited to, the payment of Rent). Should any of the equipment or machinery utilized in supplying the services listed herein for any cause cease to function properly, Landlord shall use reasonable diligence to repair that equipment or machinery promptly, but Tenant shall have no right to terminate this 20 See Exhibit F Addendum, Paragraph 2 21 See Exhibit F Addendum, Paragraph 3 22 Electrical facilities to provide sufficient power for the operation of the general banking and office business purposes of the Tenant, including all of its special machines and equipment 23 On the 18th and 19th floors of the Premises 24 To be provided as set forth above in this Section 7.02 Lease, and shall have no claim for a reduction, abatement or rebate of Rent or damages on account of any interruption in service occasioned thereby resulting therefrom.25

  • Information Furnished Each Borrower will furnish to Bank: (a) Within forty-five (45) days after the close of each fiscal quarter, except for the final quarter of each fiscal year, its unaudited balance sheet as of the close of such fiscal quarter, its unaudited income and expense statement with year-to-date totals and supportive schedules, and its statement of retained earnings for that fiscal quarter, all prepared in accordance with GAAP. (b) Within one hundred twenty (120) days after the close of each fiscal year, a copy of its statement of financial condition including at least its balance sheet as of the close of such fiscal year and its income and expense statement, and its retained earnings statement for such fiscal year, examined and prepared on an audited basis by independent certified public accountants selected by Borrower and reasonably satisfactory to Bank, in accordance with GAAP. (c) Prompt written notice to Bank of any Event of Default or breach under any of the terms or provisions of this Agreement or any other Loan Document, any litigation which would have a material adverse effect on Borrower's and its Subsidiaries' financial condition, and any other matter which has resulted in, or is likely to result in, a material adverse change in Borrower's and its Subsidiaries' financial condition or operations. (d) Within forty-five (45) days after the close of each fiscal quarter, a certification of compliance with all covenants under this Agreement, executed by Borrower's duly authorized officer, in form acceptable to Bank. (e) Prior written notice to Bank of any change in Borrower's, chairman, chief executive officer, president or chief financial officer or, Borrower's name or state of organization, and the material relocation of Borrower's assets. (f) Within fifteen (15) days after Borrower knows or has reason to know that any Reportable Event or Prohibited Transaction (as defined in ERISA) has occurred with respect to any defined benefit pension plan of Borrower, a statement of an authorized officer of Borrower describing such event or condition and the action, if any, which Borrower proposes to take with respect thereto. (g) Such other financial statements and information as Bank may reasonably request from time to time, including without limitation update(s) to Schedule 3.2.