Installation Report Sample Clauses

Installation Report. (To be provided by SPD and to be submitted at most 7 days prior to proposed commissioning date, which shall be verified by Commissioning Committee) Sr. No. Capacity of the Project (MW) Capacity already commissioned (MW) Capacity proposed to be commissioned (MW)
AutoNDA by SimpleDocs
Installation Report. (To be provided by SPD and to be submitted at least 10 days prior to Commissioning Date which shall be verified by Commissioning Committee) Sl. No Particulars Details
Installation Report. Sr. No. Capacity of the Project (MW) Capacity already commissioned (MW) Capacity proposed to be commissioned (MW)
Installation Report. (To be provided by HYBRID POWER DEVELOPER and to be submitted at least 10 days prior to commissioning date by Appropriate Authority of State) Sr. No. Capacity of the Project (MW) Capacity already commissioned (MW) Capacity proposed to be commissioned (MW) I. Technology used (Mono/Multi Crystalline / thin film / Others; please specify along with capacity of each type)
Installation Report. (To be provided by SPD and to be submitted at least 10 days prior to Commissioning Date which shall be verified by Commissioning Committee) Sr. No. I Capacity of the Plant (MW) Capacity of the Plant (MWp) II Module Technology used (Mono/ Multi Crystalline/ Thin Film/ Others; please specify along with capacity of each type) III Rating of individual module (Wp) IV Tilt angle (from horizontal) at which array is installed V Number of modules installed of each type VI Source(s) of the cells installed of each type VII Source(s) of the Modules installed of each type VIII Number of PCUs/ Inverters installed IX Source of the PCUs/Inverters (Name of supplier with address) X Rating of PCUs/ Inverters XI Date of Installation of Full Capacity PV Arrays PCUs/ Inverters Transformers XXXX XII XXXX: Storage Technology used XXXX Ratings (Power and Energy with C-rates) and No. of Battery Module Packs XXXX: PCU (Nos. and Ratings) OEM Recommended DoD Unit Battery Technical Specifications: Nominal Voltage: Cut-off Voltage: Battery Cycle Life (at OEM Recommended DoD) Operating Temperatures Appendix – A3
Installation Report. (To be provided by SPD on non-judicial stamp paper of Rs. 100/- which shall be verified by Commissioning Committee) Sr. No. Capacity of the Project (MW) Capacity already commissioned (MW) Capacity proposed to be commissioned (MW)
Installation Report. 8.1.1. The Recipient must provide to the Department an Installation Report within 20 Business Days of:
AutoNDA by SimpleDocs
Installation Report. At conclusion of the installation, all quality assurance and all required tests (cf. items 15.1, 18.3, 18.4 and 18.5) shall be documented in an installation report. This report shall also contain details of the measuring equipment and procedures used, with copies of the most recent calibration certificates, etc. User instructions User instructions shall be drawn up in Danish or English and shall be designed and prepared so that they: Ensure correct and optimal operation, as well as safe use of the equipment. Prevent incorrect use that could damage the equipment. Optimally take into account users and third parties. Facilitate the functioning of otherwise faultless equipment in accordance with the intended use. Daily operating and maintenance manual The daily operating and maintenance manual shall be compiled in Danish or English and shall provide instruction on daily cleaning, maintenance and service so that, through implementation of the described routines, the equipment retains its full functionality and can be operated correctly and safely for both users and patients. The daily operating and maintenance manual may be incorporated into the user instructions. Service manual Service manuals shall be compiled in Danish or English and shall contain all control measurement procedures, service instructions and adjustment and maintenance instructions necessary to conduct a full service of the equipment. The scope and content of the Service manual shall reflect the information provided by the manufacturer for the Supplier’s own service engineers. Technical manuals and software manuals The technical manuals shall be compiled in Danish or English and shall include specifications at component level, including diagrams, etc. Software manuals shall similarly be compiled in Danish or English. The scope and content of the technical manuals and software manuals shall reflect the information provided by the manufacturer for the Supplier’s in-house technicians. Updating the documentation The Supplier is obliged to keep manuals and other documentation updated by unsolicited and systematically forwarding all service notifications and updates for this material to the Purchaser immediately upon release. Furthermore, the Supplier undertakes to amend the documentation immediately in the event that the Supplier is made aware of any errors or omissions. In the event of updates or upgrades of the equipment or the installed software, full documentation for this shall be supplied. Te...

Related to Installation Report

  • Implementation Report Within 150 days after the Effective Date, Extendicare shall submit a written report to OIG summarizing the status of its implementation of the requirements of this CIA (Implementation Report). The Implementation Report shall, at a minimum, include:

  • Project Reports; Completion Report 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report.

  • Installation Where installation is required, Contractor shall be responsible for placing and installing the product in the required locations at no additional charge, unless otherwise designated on the Contract or purchase order. Contractor’s authorized product and price list shall clearly and separately identify any additional installation charges. All materials used in the installation shall be of good quality and shall be free of defects that would diminish the appearance of the product or render it structurally or operationally unsound. Installation includes the furnishing of any equipment, rigging, and materials required to install or replace the product in the proper location. Contractor shall protect the site from damage and shall repair damages or injury caused during installation by Contractor or its employees or agents. If any alteration, dismantling, excavation, etc., is required to achieve installation, the Contractor shall promptly restore the structure or site to its original condition. Contractor shall perform installation work so as to cause the least inconvenience and interference with Customers and with proper consideration of others on site. Upon completion of the installation, the location and surrounding area of work shall be left clean and in a neat and unobstructed condition, with everything in satisfactory repair and order.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!