Architectural history Sample Clauses

Architectural history. The minimum professional qualifications in architectural history are a graduate degree in architectural history, art history, historic preservation, or closely related field, with course work in American architectural history; or a bachelor's degree in architectural history, art history, historic preservation, or closely related field plus one of the following:
AutoNDA by SimpleDocs
Architectural history. For the proposed NLX project, the APE for architectural history needs to account for any physical, auditory, atmospheric, or visual impacts to historic properties. The potential effects from each component of the proposed project are different and, therefore, a different APE may be needed. The proposed project components are still being refined so the purpose of this discussion is to detail the APE associated with each component, which will then be combined into one APE based on the nature of the components proposed. The types of effects anticipated may include direct physical and/or vibratory effects, as well as potential indirect visual, auditory, and atmospheric effects. Effects may be temporary or permanent. To aid in identifying the potential effects the proposed elements of the project may have on architectural history properties in order to define an appropriate APE for architectural history, the following was assumed based on current project information:  Construction along the project corridor will generally be intermittent and not continuous at any one point along the corridor for the duration of construction;  Construction activity will be limited to daytime hours, generally between 6:00 a.m. and 6:00 p.m., when higher noise levels are more acceptable;  The construction and operation of depots (stations) and other facilities such as parking lots will be included in a separate National Environmental Policy Act (NEPA) process;  The centerline of any new parallel track will be, at most, 30 feet (ft.) off-set from the centerline of the existing railroad track within a corridor;  According to the Minneapolis-Duluth/Superior Restoration of Intercity Passenger Rail Service Comprehensive Feasibility Study and Business Plan (December 2007) by Transportation Economics & Management System, Inc. the number of freight trains that currently operate along the railroad corridors (Route No. 9) with active tracks range from 12 to 60 trains per day. A portion of one corridor also sees two intercity passenger trains per day. The maximum number of high-speed passenger trains (HSTs) that are proposed to be operated daily along the potential railroad corridors is eight, which would increase the number of trains along the active lines (Route No. 9) by 7 to 25 percent per day. If project assumptions change, portions of this APE rationale may need to be revisited and potentially revised;  The length of the proposed passenger trains will generally be much shorter th...

Related to Architectural history

  • Architecture The Private Improvements shall have architectural features, detailing, and design elements in accordance with the Project Schematic Drawings. All accessory screening walls or fences, if necessary, shall use similar primary material, color, and detailing as on the Private Improvements.

  • Engineering Forest Service completed survey and design for Specified Roads prior to timber sale advertisement, unless otherwise shown in A8 or Purchaser survey and design are specified in A7. On those roads for which Forest Service completes the design during the contract, the design quantities shall be used as the basis for revising estimated costs stated in the Schedule of Items and adjusting Timber Sale Account. Forest Service engineering shall be completed according to the schedule in A8. Should Forest Service be unable to perform the designated survey and design by the completion date or other agreed to time, upon written agreement, Purchaser shall assume responsibility for such work. In such event, Contracting Officer shall revise:

  • Physical Architecture 59.2.1 CenturyLink's network architecture in any given local exchange area and/or LATA can vary markedly from another local exchange area/LATA. Using one or more of the NIMs herein, the Parties will agree to a physical architecture plan for a specific LATA, or if appropriate based on other requirements in Section 59, Local Calling Area. The physical architecture plan, as described in the Local Interconnection POI Profile, will be discussed during joint implementation planning. CLEC and CenturyLink agree to Interconnect their networks through existing and/or new Interconnection Facilities between CLEC switch(es) and CenturyLink's End Office Switch(es) and/or Tandem Switch(es). The physical architecture plan will be in accordance with Forecasting and Planning requirements in Article IV.

  • Infrastructure Improvements The design, redevelopment and construction and completion of certain infrastructure improvements, including sewer, stormwater, electrical and water main improvements, along with other similar improvements.

  • Design XXX XXX XXXXX Plan and Aligned Budget In building budgets, please keep in mind that federal funds should be utilized to supplement your state and local funds. The ARP XXXXX budget submitted through the Utah Grants Management System does not have to include state and local funds, but their availability and utilization should be considered the foundation for building recovery and acceleration plans. As you are braiding various state and federal funds, be mindful that some funds expire at different times than others. The increased federal funds will enhance the opportunities that you can offer, but we encourage you to think holistically as you assess your LEA’s situation and make plans for academic recovery and acceleration.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Landscape Develop and coordinate landscape design concepts entailing analysis of existing conditions, proposed components and how the occupants will use the facility. Include location and description of planting, ground improvements and visual barriers.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Overview (a) The Employer is committed to maintaining a stable and skilled workforce, recognising its contribution to the operation of the Employer. As such, full time direct and ongoing employment is a guiding principle of this Agreement.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!