Construction Support Sample Clauses

Construction Support. 1. A-E, as directed by County, may be required to construction support services for Roadway and Bikeway projects that include, but are limited to the following: review and provide design clarification on approved plans and specifications; identify, prepare and recommend contract change orders; perform cost analysis for unforeseen conditions and extra work; resolve planning, design, construction, and scheduling conflicts/disputes; review shoring design and calculations; coordinate, monitor and advise on overall project schedule; review and approve water quality practices, traffic control plans, shop drawings and calculations for temporary structures (i.e. trench shoring, false work, and other temporary structural forms); review, evaluate and analyze potential claims; and assist in community and media relations.
AutoNDA by SimpleDocs
Construction Support. A-E, as directed by County, may be required to construction support services for Bridge projects that include, but are limited to the following: review and provide design clarification on approved plans and specifications; identify, prepare and recommend contract change orders; perform cost analysis for unforeseen conditions and extra work; resolve planning, design, construction, and scheduling conflicts/disputes; review shoring design and calculations; coordinate, monitor and advise on overall project schedule; review and approve water quality practices, traffic control plans, shop drawings and calculations for temporary structures (i.e. trench shoring, false work, and other temporary structural forms); review, evaluate and analyze potential claims; and assist in community and media relations.
Construction Support. 10 The A/E may be required to provide construction support 11 services for Road projects that include, but are not limited 12 to the following: review and provide design clarification on 13 approved plans and specifications; identify, prepare, and 14 recommend contract change orders; perform cost analysis for 15 unforeseen conditions and extra work; resolve planning, 16 design, construction, and scheduling conflicts/disputes; 17 review shoring design and calculations; coordinate, monitor, 18 and advise on overall project schedule; review and approve 20 and calculations for temporary structures (i.e. trench 21 shoring, false work, and other temporary structural forms);
Construction Support. The Consultant will provide design response to unanticipated or changed field conditions, analyze and participate in proposed design changes, and interpret design plans. Work under this section will always be in response to a specific assignment from the Sponsor under one of the tasks below: • In response to unanticipated and/or varying field conditions or changes in construction procedures, the Consultant will conduct on-site field reconnaissance and, where required, prepare Field Change Sheets modifying pertinent contract plan sheets. • The Consultant will analyze and make recommendations on the implementation of changes proposed by the Sponsor or the construction contractor. This includes the Traffic Control Plan. • The Consultant will interpret and clarify design concepts, plans and specifications. • The Consultant will review and approve shop drawings for construction. • Corrections of design errors and omissions • Straightforward interpretations of plans and designer intentions
Construction Support. Provide support at construction sites to ensure safety of construction personnel to include but not limited to clearing anomalies prior to intrusive construction operations, visual surveillance and reconnaissance, performing demolition operations, etc.
Construction Support. Monitor mitigation or special features of the site as per permits or BO Prepare monitoring documents and submit to agencies Coordinate site remediation or maintenance as needed Construction inspection for wetland and biological mitigation site Adaptive management of wetland mitigation during construction Post-construction mitigation site monitoring with annual reports Wetland mitigation site maintenance Wetland mitigation site remediation plans Water Quality mitigation design concept report engineering function RESERVED Example Project Milestone Submittals Dates: Project Kickoff Meeting Preliminary Design Report Design Acceptance Package (DAP) Environmental Documents Right of Way Descriptions Plans Specs and Estimates (PS&E) Submittal Right of Way Certification Consultant shall submit complete schedule All documents and associated data prepared by Consultant pursuant to this agreement shall be property of ODOT (or LPA, as applicable). Consultant may retain copies for its records. Reuse of work product created by Consultant for a purpose not originally intended by parties shall be at the sole risk of such user. Documents furnished by Consultant to ODOT APM (and LPA when applicable) or designee will be specified in the WOC and may include, but not be limited to: Copies of preliminary design reports / TS&L reports are to be delivered to ODOT Liaison/Contract Administrator Copies of permit applications and wetlands delineation Copies of complete contract drawings (half size), 11” x 17”, unless another format is required, special provisions and engineer’s cost estimate Full size mylar(s) Electronic files Schematically rendered plans, sections, elevations or details for display at public meetings, review by permitting agencies and ODOT resource or project teams Technical or professional advice, testimony, expertise or opinions as requested by ODOT on matters of landscape architecture. Advice requested may be graphic, written, or oral Geographical Information System (GIS) mapping and information of existing roadside data Bridge and structure design calculation books Bridge load rating reports with calculation books and with electronic files As-constructed drawings on Mylar (full-size Mylar for bridge/structure related drawings) with electronic files of final contract drawings. Any technical report identified in the SOW in the WOC. Every final document including drawings, specifications, designs, reports, narratives, maps and plans shall be stamped with the seal a...
Construction Support. No invoicing or reimbursement will occur for the CONSTRUCTION SUPPORT PROJECT COMPONENT.
AutoNDA by SimpleDocs
Construction Support. See PROJECT COMPONENT.
Construction Support. 2 The A/E, as directed by the COUNTY, may be required to provide 3 construction support services for Bridge projects that include, but are 4 not limited to the following: review and provide design clarification 5 on approved plans and specifications; identify, prepare, and recommend 6 contract change orders; perform cost analysis for unforeseen conditions 7 and extra work; resolve planning, design, construction, and scheduling 8 conflicts/disputes; review shoring design and calculations; coordinate, 9 monitor, and advise on overall project schedule; review and approve 10 water quality practices, traffic control plans, shop drawings and 11 calculations for temporary structures (i.e. trench shoring, false work, 12 and other temporary structural forms); review, evaluate, and analyze 13 potential claims; and assist in community and media relations.
Construction Support. Design Professional will provide technical support to the Construction Manager (City) during the construction phase of the Project, as described in the tasks below: