LINES AND STATIONS CONSTRUCTION DAILY TRAVEL ALLOWANCE AND ROOM AND BOARD Sample Clauses

LINES AND STATIONS CONSTRUCTION DAILY TRAVEL ALLOWANCE AND ROOM AND BOARD. Applicable to all work on Lines & Stations at both existing and new sites
AutoNDA by SimpleDocs
LINES AND STATIONS CONSTRUCTION DAILY TRAVEL ALLOWANCE AND ROOM AND BOARD. DAILY TRAVEL ALLOWANCE 27.1 The daily travel allowance will be paid by the Employers to their employees who are not living in camp or receiving a subsistence allowance as referred to in Section 27.4 on the following basis: (a) If an employee lives less than fifty (50) road-driven kilometres from the work location or declared assembly point, no travel allowance will be paid. (b) If an employee lives fifty (50) to seventy (70) road-driven kilometers from the work location or declared assembly point, he shall receive $27.07 per day travel allowance effective May 1, 2020 ($27.34 effective May 1, 2021, $27.61 effective May 1, 2022, $27.89 effective May 1, 2023, $28.17 effective May 1, 2024) for each day worked or reported for. (c) If an employee lives seventy (70) to ninety-six(96) road-driven kilometers from the work location or declared assembly point, he shall receive $31.18 per day travel allowance effective May 1, 2020 ($31.49 effective May 1, 2021, $31.80 effective May 1, 2022, $32.12 effective May 1, 2023, $32.44 effective May 1, 2024) for each day worked or reported for. (d) If an employee lives ninety-six (96) to one hundred and ten (110) road- driven kilometers from the work location or declared assembly point, he shall receive $35.28 per day travel allowance effective May 1, 2020 ($35.63 effective May 1, 2021, $35.99 effective May 1, 2022, $36.35 effective May 1, 2023, $36.71 effective May 1, 2024) for each day worked or reported for. (e) If an employee lives greater than or equal to one hundred and ten (110) road-driven kilometers from the work location or declared assembly point, and does not qualify for subsistence allowance under Section 27.4 below, or does not maintain a temporary accommodation at or near the work location or declared assembly point, he shall receive $39.09 per day travel allowance effective May 1, 2020 ($39.48 effective May 1, 2021, $39.87 effective May 1, 2022, $40.27 effective May 1, 2023, $40.67 effective May 1, 2024) provided he continues to travel greater than or equal to one hundred and ten (110) road-driven kilometers daily for each day worked or reported for. (f) Employees using company vehicles are not entitled to daily travel. (g) If a journeyman does not qualify for Room and Board under Article 27.4, and lives greater than or equal to one hundred and ten (110) road-driven kilometers from the project, he or she shall receive daily travel as per the rates in Article 27.1 (e). 27.2 The Employer reserves the right to bas...
LINES AND STATIONS CONSTRUCTION DAILY TRAVEL ALLOWANCE AND ROOM AND BOARD. DAILY TRAVEL ALLOWANCE
LINES AND STATIONS CONSTRUCTION DAILY TRAVEL ALLOWANCE AND ROOM AND BOARD. DAILY TRAVEL ALLOWANCE 21.1 The daily travel allowance will be paid by the Employers to their Effective May 1, 1996, if an employee lives within forty (40) radius kilometers of the work location or declared assembly point, no travel allowance will be paid. If an employee lives within 40 to 56 radius kilometers of the work location or declared assembly point, he shall receive $16.55 per for each day worked or reported for. If an employee lives within 56 to 80 radius kilometers of the work location or declared assembly point, he shall receive $20.05 per day for each day worked or reported for. If an employee lives within 80 to 97,radius kilometers of the work location or declared assembly point, he shall receive $23.55 per day for each day worked or reported for. If an employee lives greater than 97 radius kilometers from the work location or declared assembly point, and does not qualify for subsistence allowance under Section 20.3 below, he shall receive $26.80 per day provided he continues to travel greater than 97 radius kilometers daily for each day worked or reported for. When an employee is directed to report to a location that involves travelling around a natural barrier, the distance around the natural barrier shall be the shortest distance measured by a series of straight lines. The sum of the distances of these straight lines shall be applied to the ring concept to establish the employee’s travel allowance entitlement. A natural barrier is defined as any obstruction or impediment which creates an unreasonable relationship between radius kilometers and actual kilometers travelled. 21.2 The Employer reserves the right to base daily travel allowance on the distance in radius kilometers from where an employee lives to either the work location or declared assembly point, depending on where the employee is directed to report. 21.3 The following conditions will apply for employees whose regular residence* is more than 97 radius kilometers from the work location: 1. The place where the employee maintains a self-contained, domestic establishment (a dwelling house, apartment or similar place of residence where a person generally eats and sleeps and for which he can show proof of financial commitment). This is in contrast to a boarding house facility which is not self-contained; and 2. The employee normally resides in the residence except for those periods of time when, because of the location of the work, the employee is forced to obtain temporary accommodat...
LINES AND STATIONS CONSTRUCTION DAILY TRAVEL ALLOWANCE AND ROOM AND BOARD. 23.1 The daily travel allowance will be paid by the Employers to their employees who are not living in camp or receiving a subsistence allowance as referred to in Article 23.3 on the following basis: (a) If an employee lives within fourty (40) radius kilometers of the work location or declared assembly point, no travel allowance will be paid. (b) If an employee lives within 41 to 56 radius kilometers of the work location or declared assembly point, he shall receive the following amount per day for each day worked or reported for: • $23.55 effective May 1, 2010 • $24.05 effective May 1, 2011 • $24.50 effective May 1, 2012 • $25.00 effective May 1, 2013 • $25.50 effective May 1, 2014 • $26.00 effective May 1, 2015 • $26.55 effective May 1, 2016 • $27.05 effective May 1, 2017 • $27.60 effective May 1, 2018 • $28.15 effective May 1, 2019 (c) If an employee lives within 57 to 80 radius kilometers of the work location or declared assembly point, he shall receive the following amount per day for each day worked or reported for: • $27.15 effective May 1, 2010 • $27.70 effective May 1, 2011 • $28.20 effective May 1, 2012 • $28.80 effective May 1, 2013 • $29.35 effective May 1, 2014 • $29.95 effective May 1, 2015 • $30.50 effective May 1, 2016 • $31.15 effective May 1, 2017 • $31.75 effective May 1, 2018 • $32.40 effective May 1, 2019 (d) If an employee lives within 81 to 97 radius kilometers of the work location or declared assembly point, he shall receive the following amount per day for each day worked or reported for: • $30.70 effective May 1, 2010 • $31.30 effective May 1, 2011 • $31.95 effective May 1, 2012 • $32.55 effective May 1, 2013 • $33.20 effective May 1, 2014 • $33.90 effective May 1, 2015 • $34.55 effective May 1, 2016 • $35.25 effective May 1, 2017 • $35.95 effective May 1, 2018 • $36.65 effective May 1, 2019 (e) If an employee lives greater than 97 radius kilometers from the work location or declared assembly point, and does not qualify for subsistence allowance under Article

Related to LINES AND STATIONS CONSTRUCTION DAILY TRAVEL ALLOWANCE AND ROOM AND BOARD

  • PRE-CONSTRUCTION PHASE SERVICES The Pre-Construction Phase shall be deemed to commence upon the date specified in a written Notice to Proceed with Pre-Construction Phase Services issued by Owner and shall continue through completion of the Construction Documents and procurement of all major Subcontractor agreements. Contractor is not entitled to reimbursement for any costs incurred for Pre-Construction Phase Services performed before issuance of the written Notice to Proceed. Pre-Construction Phase Services may overlap Construction Phase Services. Contractor shall perform the following Pre-Construction Phase Services:

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Routine Maintenance, Construction, and Repair The NYISO or Connecting Transmission Owner may interrupt interconnection service or curtail the output of the Small Generating Facility and temporarily disconnect the Small Generating Facility from the New York State Transmission System or Distribution System when necessary for routine maintenance, construction, and repairs on the New York State Transmission System or Distribution System. The NYISO or the Connecting Transmission Owner shall provide the Interconnection Customer with five Business Days notice prior to such interruption. The NYISO and Connecting Transmission Owner shall use Reasonable Efforts to coordinate such reduction or temporary disconnection with the Interconnection Customer.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • MAINTENANCE AND REPAIR; RULES Tenant will, at its sole expense, keep and maintain the Premises and appurtenances in good and sanitary condition and repair during the term of this Agreement and any renewal thereof. Without limiting the generality of the foregoing, Tenant shall: (a) Not obstruct the driveways, sidewalks, courts, entry ways, stairs and/or halls, which shall be used for the purposes of ingress and egress only; (b) Keep all windows, glass, window coverings, doors, locks and hardware in good, clean order and repair; (c) Not obstruct or cover the windows or doors; (d) Not leave windows or doors in an open position during any inclement weather; (e) Not hang any laundry, clothing, sheets, etc. from any window, rail, porch or balcony nor air or dry any of same within any yard area or space; (f) Not cause or permit any locks or hooks to be placed upon any door or window without the prior written consent of Landlord; (g) Keep all air conditioning filters clean and free from dirt; (h) Keep all lavatories, sinks, toilets, and all other water and plumbing apparatus in good order and repair and shall use same only for the purposes for which they were constructed. Tenant shall not allow any sweepings, rubbish, sand, rags, ashes or other substances to be thrown or deposited therein. Any damage to any such apparatus and the cost of clearing stopped plumbing resulting from misuse shall be borne by Tenant; (i) And Tenant's family and guests shall at all times maintain order in the Premises and at all places on the Premises, and shall not make or permit any loud or improper noises, or otherwise disturb other residents; (j) Keep all radios, television sets, stereos, phonographs, etc., turned down to a level of sound that does not annoy or interfere with other residents; (k) Deposit all trash, garbage, rubbish or refuse in the locations provided therefor and shall not allow any trash, garbage, rubbish or refuse to be deposited or permitted to stand on the exterior of any building or within the common elements; (l) Abide by and be bound by any and all rules and regulations affecting the Premises or the common area appurtenant thereto which may be adopted or promulgated by the Condominium or Homeowners' Association having control over them.

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.

  • General Conditions Costs Contractor is entitled to receive payment for the actual cost of the allowable General Conditions items incurred after receipt of a Notice to Proceed with Construction from Owner through Substantial Completion of the Project, plus 30 calendar days. Contractor is not entitled to reimbursement for General Conditions Costs incurred before receipt of the Notice to Proceed. General Conditions Costs incurred after Substantial Completion, plus 30 calendar days, must be approved in advance by Owner. Allowable General Conditions items are identified below and in Exhibit “D” attached to this Agreement. These items shall be included in the General Conditions Cost amount shown as a line item in the Guaranteed Maximum Price Proposal and as detailed on the Schedule of Values. Items not specifically included below or in Exhibit “D” will not be allowed as General Condition Costs.

  • Construction Services 4,500 thousand SDR for Japan Post in Group A 15,000 thousand SDR for all other entities in Group A 4,500 thousand SDR for entities in Group B Architectural, engineering and other technical services covered by this Agreement: 450 thousand SDR

  • Construction Phase - Administration of the Construction Contract INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE 1.1.9.1. The Construction Phase will commence with the award of the Construction Contract to a selected vendor (“Contractor”) and will terminate when final payment is made by the State to the Contractor. In any event, the construction phase will not extend 60 days beyond the substantial completion date unless extended by change order. If such extension occurs, additional costs due to the ARCHITECT/ENGINEER shall be negotiated with the State. 1.1.9.2. The ARCHITECT/ENGINEER shall work with the State during the construction of the Project to provide the administration of the contract between the State and the Contractor in accordance with the terms herein and consistent with the contract between the State and the Contractor, and the extent of his/her duties and responsibilities and the limitations of his/her authority as assigned therein shall not be modified without his/her written consent. 1.1.9.3. The ARCHITECT/ENGINEER shall advise and consult with the State, and all of the State's instructions to the Contractor shall be issued through the ARCHITECT/ENGINEER after authorization by the State. 1.1.9.4. The ARCHITECT/ENGINEER shall, at all times, have access to the work wherever it is in preparation or progress. 1.1.9.5. The ARCHITECT/ENGINEER shall make periodic visits to the Project site, at least biweekly, and shall make such further visits when reasonably requested by the State, as to familiarize himself/herself with the progress and quality of the work performed and as to determine, on the basis of such visits, if such progress and quality are in accordance with the Contract Documents. The ARCHITECT/ENGINEER shall be responsible for project meeting minutes. In addition to this, the ARCHITECT/ENGINEER shall periodically report his/her findings thereon to the State, at such times as in the exercise of his/her professional judgment such findings are appropriate and at least monthly, at the conference provided for in Section 1.1.9.6, and further at such times as the State may reasonably request. The ARCHITECT/ENGINEER shall not be required to make exhaustive or continuous on-site inspections, except as required in the exercise of his/her professional judgment for said reports and, except in particular, to fulfill the commissioning requirements. The ARCHITECT/ENGINEER shall not be responsible for construction means, methods, techniques, sequences or procedures or for safety precautions and programs in connection with the work, and he/she shall not be responsible for the Contractor's failure to carry out the work in accordance with the Contract Documents except as provided for herein specifically between the State and the ARCHITECT/ENGINEER. 1.1.9.6. In preparing the bid documents, to the extent that the ARCHITECT/ENGINEER utilizes sub- consultants for their expertise, such as, but not limited to: Landscape Architects, Civil, Structural, Mechanical, and Electrical Engineers, these consultants, in effect, become an extension of the ARCHITECT/ENGINEER. Where the term ARCHITECT/ENGINEER is used in Section 1.1.9.2 as well as 1.1.9.5, it shall include those sub-consultants when work is being performed in their area of expertise. For example, the Mechanical Engineer would inspect the under slab plumbing before it is backfilled, but then wouldn’t necessarily be needed on site until the rest of the mechanical systems are being installed. The sub-consultant shall also be required to periodically inspect the progress of the “As-builts” and verify that they are up-to-date and verify such to the ARCHITECT/ENGINEER, before the ARCHITECT/ENGINEER issues the certificate of payment for that pay period. 1.1.9.7. Based upon his/her determinations and reports made under Section 1.1.9.5 of this Agreement and upon the Contractor's applications for payment, the ARCHITECT/ENGINEER shall once every month, after an on-site conference between the State, the Contractor and the ARCHITECT/ENGINEER, determine the amount then owing to the Contractor and shall then issue a certificate of payment for the amount agreed upon. The issuance of a Certificate for Payment shall constitute a representation by the ARCHITECT/ENGINEER to the State, based on such ARCHITECT/ENGINEER'S determination and report and the data supplied to him/her by the Contractor (without affecting his/her duties defined in Section 1.1.9.5.), that the work has progressed to the point indicated; that the quality of the work is in accordance with the Contract Documents (subject to the results of any specified subsequent tests required by the Contract Documents, to immaterial and insubstantial deviations from the Contract Documents, which will be corrected prior to completion, and to any further specific qualifications stated in the Certificate for Payment); and that the Contractor is entitled to such payment in the amount certified. Provided, however, the issuance of such certificate will not affect any obligations of the Contractor to the State. By issuing a certificate for payment, the ARCHITECT/ENGINEER shall not be deemed to represent that he/she has made any examination to ascertain how and for what purpose the Contractor has used the monies paid on account of the contract sum. ARCHITECT/ENGINEER shall not accept any part of the work on behalf of the State; ARCHITECT/ENGINEER may only recommend acceptance. Final acceptance is a right reserved solely to the State. 1.1.9.8. The ARCHITECT/ENGINEER shall be, in the first instance, the interpreter of the requirements of all Construction Documents, and shall have all requisite authority relating thereto for the purposes of authorizing the Contractor to proceed or stop with any component of the project after consultation and agreement with the State. The ARCHITECT/ENGINEER shall not be liable to the State for any loss or cost incurred by the State arising from delays in the construction schedule caused by any decision made by the ARCHITECT/ENGINEER in the reasonable exercise of professional judgment either to exercise or not to exercise his/her authority to stop the Work. 1.1.9.9. The ARCHITECT/ENGINEER shall review and respond to shop drawings, samples, and other submissions of the Contractor as in conformance with the design concept and information in the Contract Documents and the designs and plans relating to the project until approved or not requiring re-submission. The ARCHITECT/ENGINEER shall also review the submittal log at construction meetings and report to the State, on a monthly basis, their findings thereon. 1.1.9.10. The ARCHITECT/ENGINEER shall prepare all change orders and supporting data for the State's approval. 1.1.9.11. The ARCHITECT/ENGINEER shall conduct inspections to determine the Dates of Substantial Completion and Final Completion and shall receive written guarantees and related documents assembled by the Contractors and shall issue a final certificate of payment in accordance with Section 1.1.9.6. 1.1.9.12. The ARCHITECT/ENGINEER shall be responsible for system commissioning in accordance with the BGS Design Guidelines and as indicated in the BGS Commissioning Guidelines. Please see the BGS website xxxx://xxx.xxxxxxx.xxx/facilities/forms . The ARCHITECT/ENGINEER shall inspect, and document, each and every system to ensure that it complies with design intent, including but not limited to: system installation, system operation, and seasonal changeover. 1.1.9.13. Except in the manner specifically provided for herein, the ARCHITECT/ENGINEER shall not be responsible to the State for the acts or omissions of the Contractor or any of the Contractor’s agents or employees, or any other person not an employee or agent of the ARCHITECT/ENGINEER performing work on the Project. The ARCHITECT/ENGINEER shall be responsible for and shall pay the amount of any increase in the total Contract Price or the total Change Order(s) Price, which increase results from an error, inconsistency, or omission in the Contract Documents or instructions. 1.1.9.14. ARCHITECT/ENGINEER shall furnish to the State, a complete set of marked-up drawings and specifications showing all the changes to the Construction Documents made by Addenda, Change Orders, Shop Drawings, RFIs and other information received from the Clerk; and General Contractor’s As-built markups. The changes to the drawings are to be created on a separate layer in the DWG set and highlighted in a box, cloud or the like in the PDF set. The specifications are also to differentiate the changes made by highlighting in a box, cloud, etc. and be provided in Microsoft Word. These drawings and specifications shall be supplied within three (3) months of the date of Substantial Completion and before final payment. 1.1.9.15. Architect/Engineer (and design team members as required) shall conduct a one-year warranty inspection of the completed construction project between the eleventh and twelfth month from the date of substantial completion and shall issue a list of defective items needing correction to the Contractor.

  • Construction Activities Please list all major construction activities, both planned and completed, to be performed by Seller or the EPC Contractor. Activity EPC Contractor / Subcontractor Completion Date __/__/____ (expected / actual) __/__/____ (expected / actual)

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!