Assumptions and Exclusions. 7.1 Scope is subject to assumptions and exclusions
Assumptions and Exclusions. Geotechnical services are included in this proposal. • Materials sampling and testing to establish the structural capacity of various buildings components is included in this proposal. • Periodic preliminary conferences with DSA are assumed to be required and are included in this proposal. • Accessibility improvements to the Center Street entrance will be required. • With the exception of mechanical shafts, stairs, and elevator enclosures, the non- structural elements of the interior such as partitions and ceilings are assumed to be removed. • No major changes to the building area or exterior enclosure are proposed with the exception of changes associated with added lateral force resisting systems. • Various schemes for structural improvements have been explored and offer different opportunities for the layout and size of interior spaces. New lateral force resisting systems may include drilled piers and footings; shotcrete, concrete masonry or plywood shear walls; additional nailing at plywood shear walls and floor diaphragms; drag members; blocking and strapping. The specific approach for structural improvements will require approval by the Division of the State Architect (DSA) in order to convert this building for use as a community college facility. • The thermal performance of the building may be improved by adding roof and wall insulation. • Replacement of exterior glazing systems is not included due to cost considerations. • Restroom fixture capacity appears to be sufficient under current code if the number of new classrooms is limited. However, if additional classrooms are desired, an increase in the number of restroom fixtures will be required. The test fit assumes that the restrooms will be renovated or expanded at their current location to utilize the existing sewer connection. • The existing elevator is assumed to require modernization but not replacement. • The open stair is assumed to be removed. • The project is assumed to include replacement of all mechanical systems. • The project is assumed to include provision of a new fire sprinkler system and fire alarm system. • The project is assumed to include provision of telecom infrastructure including dedicated MDF/IDF rooms. We hope this brief summary is a useful reference for your review of our proposal. The completed report, entitled “0000 Xxxxxx Xxxxxx Test Fit Summary”, dated July 16, 2014, includes additional information regarding the proposed renovation and conversion. We appreciate the op...
Assumptions and Exclusions. It is the City’s intent that the interactive Project water feature will be a packaged system and that the manufacturer will be responsible for its engineering. Working with the City and Steering Committee, the Design Team will help to facilitate the selection of the desired appearance and water effect, and produce the necessary performance specifications for this work to be bid competitively.
Assumptions and Exclusions. MBCO is under the assumption that NewQuest will be dedicating the east 900 feet of right-of-way by plat out of a 21.89 acre parcel referenced by FBCAD No. R484346; therefore MBCO will not be completing a Category 1A Condition II boundary survey for the above-referenced tract of land. • MBCO must be provided with the recorded plat for the 21.89 acre parcel dedicating the east 900 feet of the proposed Xxxxx Plantation ROW. • MBCO under this proposal will not be monumenting the east 900 feet of the proposed Xxxxx Plantation Dr. ROW as this should be monumented by the platting surveyor. • MBCO will be given sub meter locations of the geotech boring locations and boreholes will be marked with lath and flagging in the field prior to surveying. • MBCO will be given right of entry and access to the areas needed to perform our services per this proposal in a timely manner. • MBCO will not be responsible for obtaining right of entry per this proposal.
Assumptions and Exclusions. The Project will require Caltrans review and approval of the Environmental Document and Technical Studies. Caltrans is the NEPA Lead Agency.
Assumptions and Exclusions. The Engineer is not responsible for the Contractor’s means and methods, construction sequencing, or site safety. • The Engineer’s observations and inspections are intended to monitor compliance with the contract documents and do not guarantee the performance of the Contractor’s work. • Any additional services or work beyond the scope defined herein will require an amendment or separate agreement, and corresponding fee adjustment.
Assumptions and Exclusions. 0000 Xxxxx Xxx, Xxxxx 000 Miami FL 33145 Phone: (000) 000-0000 Fax: (000) 000-0000
Assumptions and Exclusions. 1. PCCA will provide readily available data related to the material to be dredged (full geotechnical data, calculations, and quantities). Delivery of berth geotechnical data and quantities by August 30, 2019 is critical to meeting the schedule as described above.
2. PCCA will provide readily available historical PA data (as-built plans, geotechnical information, and magnetometer information if available).
3. The design for SS2 must be coordinated with land owners/representatives and planned project.
4. This scope of work does not include permitting or agency coordination activities.
5. This scope of work does not include any associated real estate activities.
Assumptions and Exclusions. 1. Payment of all railroad fees, and any plan check, permit and filing fees will be paid by City.
2. Preparation of SWPPP, if required, will be by Contractor.
3. The construction drawings will be prepared in a single package. Preparation of multiple or phased construction packages are not included.
4. Consultation and permit coordination with agencies other than those noted in this proposal is not included.
5. Preparation of the GO-88B application(s) and coordination with UPRR, the CPUC and others for their concurrence and ultimate approval by the CPUC for the crossing improvements shall be performed by the City.
6. Except for submission of engineering submittals as described above and limited coordination for their review by UPRR and attendance at described field meetings and calls, all coordination with UPRR, including for execution of Preliminary Engineering agreement (PE Letter), Construction and Maintenance agreement(s) and Right-of-Entry or other agreements shall be performed by the City.
7. Administration of construction contract, negotiation of construction change orders and processing acceptance and final payment for construction work will be performed by City.
8. Bid Support Services are not included.
9. Full or part-time on-site construction representation is not included.
10. Review of Contractor’s shop drawings and construction submittals is not included.
11. Preparation of as-built drawings based on Contractor mark-ups are not included.
Assumptions and Exclusions. 1. Property boundary, American Land Title Association survey and topographic survey, and construction staking, are not included. All survey required for the project will be performed by the City or others.
2. Costs for flagging, if necessary, are not included.
3. Geotechnical engineering investigation is not included. The City or others will perform geotechnical analysis and provide the geotechnical report.
4. Site visits and in-person meetings other than those listed in this proposal are not included.
5. Environmental assessment or investigation of the site for the presence of hazardous or toxic materials in the soil, groundwater or air is not included.
6. Flood studies or area-wide hydraulics and hydrology studies are not included.
7. Traffic studies and other special studies are not included.
8. Payment of all railroad fees, and any plan check, permit and filing fees will be paid by City.