Assumptions and Exclusions. 1. It is the City’s intent that the interactive Project water feature will be a packaged system and that the manufacturer will be responsible for its engineering. Working with the City and Steering Committee, the Design Team will help to facilitate the selection of the desired appearance and water effect, and produce the necessary performance specifications for this work to be bid competitively.
Assumptions and Exclusions. 7.1 Scope is subject to assumptions and exclusions This Scope has been based upon, and is subject to, the following assumptions and exclusions.
Assumptions and Exclusions. Geotechnical services are included in this proposal. • Materials sampling and testing to establish the structural capacity of various buildings components is included in this proposal. • Periodic preliminary conferences with DSA are assumed to be required and are included in this proposal. • Accessibility improvements to the Center Street entrance will be required. • With the exception of mechanical shafts, stairs, and elevator enclosures, the non- structural elements of the interior such as partitions and ceilings are assumed to be removed. • No major changes to the building area or exterior enclosure are proposed with the exception of changes associated with added lateral force resisting systems. • Various schemes for structural improvements have been explored and offer different opportunities for the layout and size of interior spaces. New lateral force resisting systems may include drilled piers and footings; shotcrete, concrete masonry or plywood shear walls; additional nailing at plywood shear walls and floor diaphragms; drag members; blocking and strapping. The specific approach for structural improvements will require approval by the Division of the State Architect (DSA) in order to convert this building for use as a community college facility. • The thermal performance of the building may be improved by adding roof and wall insulation. • Replacement of exterior glazing systems is not included due to cost considerations. • Restroom fixture capacity appears to be sufficient under current code if the number of new classrooms is limited. However, if additional classrooms are desired, an increase in the number of restroom fixtures will be required. The test fit assumes that the restrooms will be renovated or expanded at their current location to utilize the existing sewer connection. • The existing elevator is assumed to require modernization but not replacement. • The open stair is assumed to be removed. • The project is assumed to include replacement of all mechanical systems. • The project is assumed to include provision of a new fire sprinkler system and fire alarm system. • The project is assumed to include provision of telecom infrastructure including dedicated MDF/IDF rooms. We hope this brief summary is a useful reference for your review of our proposal. The completed report, entitled “0000 Xxxxxx Xxxxxx Test Fit Summary”, dated July 16, 2014, includes additional information regarding the proposed renovation and conversion. We appreciate the op...
Assumptions and Exclusions. 1. The Project will require Caltrans review and approval of the Environmental Document and Technical Studies. Caltrans is the NEPA Lead Agency.
Assumptions and Exclusions. MBCO is under the assumption that NewQuest will be dedicating the east 900 feet of right-of-way by plat out of a 21.89 acre parcel referenced by FBCAD No. R484346; therefore MBCO will not be completing a Category 1A Condition II boundary survey for the above-referenced tract of land. • MBCO must be provided with the recorded plat for the 21.89 acre parcel dedicating the east 900 feet of the proposed Xxxxx Plantation ROW. • MBCO under this proposal will not be monumenting the east 900 feet of the proposed Xxxxx Plantation Dr. XXX as this should be monumented by the platting surveyor. • MBCO will be given sub meter locations of the geotech boring locations and boreholes will be marked with lath and flagging in the field prior to surveying. • MBCO will be given right of entry and access to the areas needed to perform our services per this proposal in a timely manner. • MBCO will not be responsible for obtaining right of entry per this proposal.
Assumptions and Exclusions. 1. Additional work related to non-performance by other consultants is not included.
Assumptions and Exclusions. 1. CGA shall perform the construction administration support services and shall certify this project. CMA limited construction support services shall be limited to attendance at the pre-bid meeting, minor RFIs and review of shop drawings.
Assumptions and Exclusions. 1. Internal assessments of existing pipes via closed-circuit television (CCTV) is not included in this scope of services.
Assumptions and Exclusions. 1. No projects identified in the Master Plan will be executed under this Task Order. AE2S will issue additional task orders to complete any projects identified in the Master Plan as needed. Owner Responsibilities