Conceptual Design Phase Sample Clauses

Conceptual Design Phase. The Design Consultant shall work with the Project Team to create a conceptual design by: December 1 ,2015
AutoNDA by SimpleDocs
Conceptual Design Phase a. If required, provide request for proposal documents and other assistance to Authority for obtaining additional topographic survey information to supplement existing information as necessary to support design work. Topographic survey shall be provided in Texas Xxxxxxx Grid Coordinates, North American Datum (NAD) 83-Texas South Zone 4205 and both North American Vertical Datum (NAVD) 88 and Mean Low Tide (MLT) datums and shall be tied to the Authority’s horizontal and vertical benchmark network as presented in the current PCCA Project Manual. Contract will be held directly by Authority.
Conceptual Design Phase. N/A for Supplemental Agreement No. 1 Cost $106.00 $492.00 $204.00 3. RECONNAISSANCE PHASE Project Manager $41.00 4 $164.00 Lead Project Engineer II $34.00 8 $272.00 Survey Project Manager $34.00 2 $68.00 Registered Land Surveyor $39.00 2 $78.00 Technician II $20.00 3 $60.00 Survey Chief $32.00 16 $512.00 Surveyor I $23.00 2 $46.00 Surveyor II $28.00 2 $56.00 4. RIGHT OF WAY DESIGN PHASE Project Manager $41.00 28 $1,148.00 Lead Project Engineer II $34.00 40 $1,360.00 Staff Engineer $26.50 44 $1,166.00 Registered Land Surveyor $39.00 18 $702.00 Technician II $20.00 24 $480.00 5. FINAL DESIGN PHASE Project Manager $41.00 27 $1,107.00 Lead Project Engineer II $34.00 56 $1,904.00 Staff Engineer $26.50 59 $1,563.50 6. BIDDING AND CONSTRUCTION PHASE N/A for Supplemental Agreement No. 1 TWM Labor Sub‐Total 355 hrs $11,488.50 TWM Payroll Overhead, Gen. & Admin Overhead (Est. at 167.49% X Subtotal) $19,242.09 Total Labor and Overhead $30,730.59 TWM Fixed Fee (14% X Total Labor and Overhead) $4,302.28 TWM Facilities Capital Cost of Money (FCCM) Rate (0.27% X TWM Labor Subtotal) $31.02 TWM Total Labor, Overhead & Fixed Fee $35,063.89 Other Direct Costs Mileage: 236 miles Rate = $ 0.575 Subconsultant: TSi Geotechnical, Inc. Subconsultant: Civil Design, Inc. DBE % = 14.5% Title Commitments: Completed by City of Wildwood Printing, Postage, and Copies $135.70 $0.00 $6,002.76 $300.00 Direct Cost and Subconsultant Subtotal $6,438.46 Total Supplemental Agreement No. 1 $41,502.35 Summary (Design Phase) Original Agreement $187,957.93 Supplemental Agreement $41,502.35 TOTAL $229,460.28 12/23/2020 ATTACHMENT B: ESTIMATE OF COST Supplemental Agreement No. 1 Local Agency: City of Wildwood, Missouri Section: N/A Project: TWM Project No. : TAP-5536(611) - Manchester Road Shared Use Path 180024 Project Length: 0.69 miles = 3640 linear feet Anticipated Construction Cost of Project: $1,020,000 TWM Staff Time Estimate Hours by Classification Total Cost Per Task Total Hours Basic Scope of Engineering Services Estimated Sheet Count QA/QC Project Manager Lead Project Engineer II Staff Engineer Senior Structural Engineer Structural Engineer III Survey Personnel Survey Project Manager Registered Land Surveyor Technician II Survey Chief Surveyor I Surveyor II A. Additional Project Management and QA/QC 2 12 6 $802.00 Phase Sub-Total = $106.00 $492.00 $204.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $802.00 $802.00 A. N/A $0.00 Phase Sub-Total = $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ...
Conceptual Design Phase. A. Verify Owner’s program so that Architect and Owner have a mutual understanding of the Project requirements.
Conceptual Design Phase. Xxxxxx-Xxxx will provide an initial concept plan and 65% PS&E plans with an initial Engineer’s
Conceptual Design Phase. The Architect will participate with and assist the Owner and Construction Manager, as required, in developing and refining the general concept for the Project described in Article I in accordance with the Design Schedule from time to time in effect.
Conceptual Design Phase. The CONSULTANT will complete a conceptual streetscape design along the Manchester Road (Route 100) corridor as described in the above General Project Scope section. The following tasks will be performed to achieve these goals:
AutoNDA by SimpleDocs
Conceptual Design Phase. 1. Coordinate topographic survey for south half of Garret Field Park.
Conceptual Design Phase. Objective: To develop two conceptual level alternatives and to clarify and define OWNER requirements for the Project for the project descriptions provided in Section 1.2 described below:
Conceptual Design Phase. The preliminary conceptual design shall be utilized on this project to clarify and define the extent of work and improvements proposed as part of this improvements. This submittal will comprise primarily of a planometric concept layout of site features to be repaired, replaced, removed, restored and modified to accommodate the needed improvements.