Telephone and Data. Equipment Location: Tenant shall advise Landlord of location of telephone equipment room, if any.
Telephone and Data. (a) Tenant will construct telephone and data rooms within or adjacent to the building core as part of its tenant improvement package.
(b) Landlord shall provide one dedicated 750 square foot main point of presence (MPOP) room for Tenant's telephone and data service entry into the building. This room shall be used exclusively by Tenant.
(c) Landlord shall also construct one dedicated alternate point of presence (APOP) room for alternate telephone and data service entry into the building.
(d) Landlord shall provide one non-exclusive 500 square foot fiber optic hub room for telephone and data service into the building. The MPOP, APOP and fiber rooms are not alternates, all will be required.
(e) Landlord shall provide dedicated empty conduits from the outside of the building near available services to Tenant's MPOP, APOP and fiber hub rooms. Secure empty conduits must be provided from the MPOP and APOP to each of the Tenant telephone and data rooms within its space and to its expansion space. Landlord must provide such conduits to serve two locations on each floor of the building occupied by Tenant and conduits must be provided between each of the two locations.
(f) Landlord shall provide an adequately sized empty conduit between the MPOP and the APOP.
Telephone and Data. (i) As a part of Landlord’s Work Landlord shall construct, and thereafter Landlord shall operate, maintain, repair and replace, a telecommunications infrastructure (“Landlord’s Telecommunication Infrastructure”) consisting of:
(1) two (2) rooms in the basement level of the Building (each a “Building NetPOP Room”) as shown on the Schematic Design Drawings,
(2) not fewer than two (2) 4-inch conduits, not fewer than one (1) of which runs from the boundary line of the Land into each Building NetPOP Room,
(3) two (2) vertical pathways for conduits, one from each of the Building NetPOP Rooms to the top floor of the Building (each a “Building Telecommunications Wiring Room”) as shown on the Existing Drawings, and
(4) one (1) room on an upper level of the Building as Landlord shall designate for satellite communications equipment (the “Building SatPOP Room”).
(ii) Tenant shall be permitted to use up to Tenant’s Pro Rata Share of the cross sectional area of the Building Telecommunications Wiring Rooms and the Building SatPOP Room for the installation of such conduits (including pullboxes) as Tenant shall require (a) from the Building NetPOP Rooms and the Building SatPOP Room to any floors or floors of the Premises, or (b) among floors of the Premises. The installation, maintenance, repair and replacement of any such conduits in the Building Communications Wiring Rooms shall be performed by contractors selected by Tenant and approved in advance by Landlord, such approval not to be unreasonably withheld, and, at Landlord’s election, under the supervision of Landlord’s riser manager.
(iii) Tenant shall be permitted to obtain telecommunications service (voice and/or data) from such providers as it elects from time to time. If Tenant shall so request, Landlord shall permit any such providers to install facilities in the Building NetPOP Rooms, subject to availability. Landlord shall not limit the number of, or impose any charge or other requirements on, such providers.
Telephone and Data. Three (3) 4" conduits shall be provided from utility source to the main telephone/telecommunications room for use by the Tenant's and Owner's telephone and data provider. A 4'x8' sheet of plywood shall be secured to the framing of the main telephone/telecommunications room to accommodate equipment, cabling and hardware. Two (2) 4" riser sleeves (one each for tenant and landlord) shall be provided at each floor to allow connectivity between floors. Two (2) 4" spare conduits shall be provided from the main telephone/telecommunications room to a location outside the building to allow for connectivity with future buildings within the development. One (1) 4" access hole with sleeve, cap and appropriate weather proofing in the top floor communications room to the roof shall be provided to accommodate cabling and power runs for rooftop installations. General power receptacles will be provided in all core areas as required by code. A complete code compliant fire alarm system shall be installed to accommodate the entire building (including future Tenant Improvements). Only devices (hams, strobes, pull stations, etc.) for the building's core and shell shall be provided. All devices for the tenant areas shall be designed, furnished, installed and funded through the tenant improvement work. The fire alarm enunciator panel will include a graphic zone plan. • Monument Sign - $15,000.00 • Landscaping - $90,600.00 Not Applicable • Proposal based upon open shop construction. • Civil, structural and architectural design to be completed by Duke Construction Limited Partnership. • FM Global design has not been included for the building systems design. • Special fire suppression systems are not referenced and therefore are not included. • Electrical Service has provided as specified in documents • Pricing for the Data Center has not been included. • Pricing for slide between floors has not been included. • Pricing for alternate facades has not been included • Pricing for LEED Silver has been included. Duke Realty Limited Partnership Attention: Vice President, Asset Management and Customer Service 000 Xxxx 00xx Xxxxxx, Xxxxx 000 Xxxxxxxxxxxx, XX 00000 RE: Lease Agreement between Duke Realty Limited Partnership, an Indiana limited partnership ("Landlord") and _________________________________________, a(n) ________________ ("Tenant") for the Leased Premises located at ____________________________, __________________, ______________ (the "Leased Premises"), dated ____________, 20...
Telephone and Data. The building shell will provide conduit from the street to the base building’s demarcation point. Telephone closets are located for tenant distribution requirements. • • • • • Full height partition, floor to underside of structure, by landlord and tenant. 3 5/8”, 25 gauge metal studs, 16” OC 5/8” type-X drywall, one layer each side, landlord to provide finished partition at common corridor. Tenant to provide finished drywall at suite interior. Cost shared by landlord and tenant, 50% each. Partition taped smooth and sanded to receive paint or wallcovering Partition cavity fully insulated • • • • • Full height partition, floor to underside of structure, by tenant 3 5/8”, 25 gauge metal studs, 16” OC 5/8” type-X drywall, one layer each side (1 hr. Fire rated) Partition taped smooth and sanded to receive paint or wallcovering Partition cavity fully insulated • • • • 9’-6” high partition, floor to 6” above ceiling, by tenant 3 5/8”, 25 gauge metal studs, 16” OC 5/8” type-X drywall, one layer each side Partition taped smooth and sanded to receive paint or wallcovering • 5/8” type-X drywall, one layer, installed below window and at bulkhead above window. Provide “L” bracket to seal opening between glazing and floor, by tenant • • • Shell includes metal studs and insulation, tenant responsible for enclosing perimeter, typ. Windowsill to be anodized aluminum, color: Champagne, included in building shell. Sill height (where xxxxx exist): 2’-10” AFF; underside of window head: 8’-10” AFF (VIF) Xxxxx are not to be modified, cut or removed, typ. • 5/8” type-X drywall, one layer over 2 V” metal stud or furring strips, floor to 6” above ceiling as required to enclose column, by tenant. • • • • • • 3’-0” x 8’-0” flush, solid core wood, Mohawk Flush Doors, Inc., prefinished premium 2000, to match Building Standard Hollow metal knock-down frame, 2” face, 16 gauge cold-rolled steel, factory primed to receive paint Falcon “Quantum” series entry lockset #B501, lever handle Xxxxx (or equal) 4 1⁄4 x 4 1⁄2 hinges, #BB 1168, stainless steel ball bearing, 2) pair Door equipped with Closer: Dor-o-matic or equal, Silencer: Ives or equal, Wall or Floor Stop: Rockwood Manufacturing or equal All hardware to match brushed chrome, US26D finish. • • 3’-0” x 7’-0” flush, solid core wood, Mohawk Flush Doors, Inc., prefinished premium 2000, birch to match Building Standard Hollow metal knock-down frame, 2” face, 16 gauge cold-rolled steel, factory primed to receive paint Falcon “Quantum” serie...
Telephone and Data. (a) ONTRACK will construct telephone and data rooms within or adjacent to the building core as part of its tenant improvement package.
(b) Liberty shall provide one dedicated 300 square foot Main Point of Presence (MPOP) room for ONTRACK's telephone and data service entry into the building. This room shall be used exclusively by ONTRACK.
(c) Liberty shall also construct one dedicated Alternate Point of Presence (APOP) room for alternate telephone and data service entry into the building.
(d) Liberty shall provide one non-exclusive fiber optic hub room for telephone and data service into the building. The MPOP, APOP and fiber rooms are not alternates, all will be required.
Telephone and Data. (a) Tenant will construct telephone and data rooms within or adjacent to the building core as part of its tenant improvement package.
(b) Landlord shall provide dedicated space within the main point of presence (MPOP) room for Tenant's telephone and data service entry into the building.
(c) Landlord shall provided dedicated empty conduits from the outside of the building near available services to the Base Building MPOP
(d) The extension of the Xxxxx Xxxxxxx Companies communication riser from the 13th floor south communication room through the 14th floor mechanical room can be accommodated at Tenant's expense.
Telephone and Data. County shall provide at its cost installation of all telephone and data lines (including Wi-Fi) serving the Premises. Notwithstanding the foregoing, Tenant shall pay, from the Operating Expense Account, the cost to install any additional telephone or data lines or Wi- Fi it may require beyond those in place on the Community Space as of the date hereof, and Tenant shall be responsible for payment for any such additional telephone lines or data services it may require in the Helpline Space. Such installation shall be subject to County's advance written consent. All costs related to use of any telephone and data lines or Wi-Fi serving the Premises during the term hereof (including any extension or holdover) shall be paid from the Operating Expense Account, except that any telephone or data lines or Wi-Fi serving the Helpline Space shall be separately billed and Tenant shall be solely responsible for paying for all outbound calls from telephone lines serving the Helpline Space. In no event shall Tenant be entitled to access the Main Communications Room ("MCR") without County's prior written consent.
Telephone and Data. In new gypsum drywall partitions only, Landlord will provide raceways for the Tenant supplied and installed telephone telephone and data systems. Raceways may be through the metal studs of the gypsum drywall partitions, or in conduit(s) as required, with junction boxes and/or plaster rings. 1. Tenant is responsible for entire telephone system, other than that which is defined under Base Building, including distribution from the existing telephone closet on the ground floor, and for all of the Tenant’s central and branch equipment, distribution panels, wiring, instruments, etc.