Traffic Maintenance Sample Clauses

Traffic Maintenance. A. In the event that any of the work is conducted within any public right of way the CONTRACTOR shall be responsible for proper Maintenance of Traffic (MOT). Unless otherwise specified, the standard specifications to be used for the work shall be as promulgated by the Florida Department of Transportation (F.D.O.T). B. Maintenance of traffic shall be the responsibility of the CONTRACTOR, is part of the CONTRACTOR’S proposal price, and shall conform to F.D.O.T.’s most current editions of “STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION,” 2015 edition (or latest edition), or FDOT “ROADWAY AND TRAFFIC DESIGN STANDARDS,” 2015 (or latest edition), or FDOT “MANUAL OF UNIFORM MINIMUM STANDARDS FOR DESIGN, CONSTRUCTION AND MAINTENANCE FOR STREETS AND HIGHWAYS,” 2015 (or latest edition), Federal Highway Administration (FHWA) “MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD),” 2015 (or latest edition), and all supplemental specifications thereto. These documents can be ordered from F.D.O.T, Maps and Publications Department, 000 Xxxxxxxx Xxxxxx, Xxxxxxxxxxx, Xxxxxxx, 00000-0000, or by going to the F.D.O.T. website at: xxx.xxx.xxxxx.xx.
AutoNDA by SimpleDocs
Traffic Maintenance. All traffic control shall be subject to approval by the City Traffic Engineer (Transportation Department 540-853-2385). The City Traffic Engineer is not the City Project Manager. Changes to the traffic control plan, as directed by the City Traffic Engineer, shall not be a basis for additional compensation. The Contractor shall submit a traffic control plan for review and approval prior to mobilization. All lane and street closures and detours shall be coordinated with the Transportation Department. Note that the Stormwater and Transportation Departments are separate departments. Traffic control plans shall be submitted within the specified number of days outlined in the Submittals (Section 01350) portion of this specification.
Traffic Maintenance. Employees in the class of Traffic Maintenance Worker II/Traffic Maintenance Leadworker who possess a valid Level I or higher Work Zone Traffic Safety Specialist Certificate and a valid Level III or higher Signs and Markings Specialist Certificate issued by the International Municipal Signal Association shall receive sixty dollars ($60) per month.‌
Traffic Maintenance. 4.11.1 Do not close or obstruct streets, sidewalks, driveways, etc., without permission from authorities having jurisdiction. Do not place or store materials in street, sidewalks, parking areas, etc., unless so authorized.
Traffic Maintenance. All weeklong vacation requests for the fiscal year must be in writing to the Superintendent of Operations or Fleet Services Manager or their designees no later than May 31 for the succeeding fiscal year. Between November 30th and April 1st Vacations of less one week duration may be granted on a first come, first serve basis depending on operational needs of the respective department.
Traffic Maintenance. The Contractor’s attention is directed to Section 6 and Section 12 of the Sacramento County Standard Construction Specifications and these Special Provisions. The Contractor shall be responsible for maintaining local property access and access to existing public cross streets within the limits of this contract. The Contractor shall be responsible for the safety of traffic within the project limits and on the approaches to the project. The Contractor shall provide 24-hour advance notification to the occupants of the property to which the existing access will be closed for a period of time exceeding 2 hours. Notification may be verbal to the occupant of the property or by written notice placed on or near the building entrance or the property access point to be closed. When doing work on a major street, the Contractor may, with the Contract Manager’s approval, close the traffic lanes in accordance with the Sacramento County Standard Construction Specifications. Lane closure shall not be allowed without the proper advance warning devices and signing and flag person control in conformance to the Sacramento County Standard Construction Specifications, and these Special Provisions. At the completion of each working day, all existing lanes of traffic shall be open to traffic. Provisions must be made for the uninterrupted passage of emergency vehicles through the project limits at all times, regardless of the controlled traffic conditions existing at that time. The Contractor shall do all traffic maintenance work as specified herein without direct payment.
Traffic Maintenance. The Contractor's attention is directed to Section 7-1.04, "Public Safety," and Section 12, “Temporary Traffic Control,” of the State Standard Specifications, the Uniform Manual of Traffic Control Devices (the latest edition of the California Supplement), and these Special Provisions. Typically, a minimum of one (1) traffic lane (not less than 3.66 m (12 feet wide), per direction, shall be allowed for closure during construction activity, or as defined within the approved traffic control plan. All other traffic lanes shall be open for public vehicular traffic at all times during non- construction activity. No work that interferes with public traffic shall be performed between 3:30 p.m. and 8:30 a.m. except work required under Section 7-1.03, "Public Convenience," and Section 7-1.04, "Public Safety" or by special approval of the Contract Manager. Prior to performing any work, under this contract the Contractor shall prepare and submit a Traffic Control Plan (TCP) to the Contract Manager for review. Note: To avoid delays, the Contractor is encouraged to submit in advance, several standard TCP’s covering the most common maintenance situations anticipated, prior to the start of the contract period. ALL night work (if any) requires a MANDATORY Traffic Control Plan (TCP), for each occurrence. If traffic controls are required for any operation under this contract to ensure the safety of workers and the public, a TCP must be submitted to the Contract Manager four (4) working days in advance of performing said operation. Contractor must receive written approval from the Contract Manager, or their designee, prior to implementing any traffic controls and notify Police, and Fire at least twenty-four (24) hours in advance of implementing the traffic controls. Review and approval of a TCP by the Contract Manager, or their designee, is based upon general conformance with Federal, State and local regulations and standards and does not relieve Contractor of responsibility for the safety of its workers and the public. If any component in the Contractor's traffic control system is displaced, damaged, or ceases to operate correctly, from any cause, during the life of the work, the Contractor shall immediately repair said component to its original condition or replace said component and shall restore the component to its original location, noncompliance may result in work stoppage by the Contract Manager. The Contract Manager, or their designee, shall review and approve all TCP...
AutoNDA by SimpleDocs

Related to Traffic Maintenance

  • Routine Maintenance (i) CRC shall be responsible for Routine Maintenance when necessary or desirable to maintain the Shared Assets in a safe operating condition, and to permit and facilitate (A) the performance by CRC of its obligations pursuant to this Agreement, and (B) the use of Shared Assets by the Operators in accordance with this Agreement. (ii) CSXT or NSR, directly or through their respective affiliates, may perform the work which CRC performed prior to the date of this Agreement when (A) CRC does not possess the skills needed for such work, (B) CRC lacks the necessary employees to do such work in a timely fashion, or (C) CRC does not possess the equipment needed to do such work. CRC and the party performing the work shall agree to a reasonable fee for such work prior to performance. CRC, CSXT and NSR may agree to have additional work performed either by CSXT, NSR or their affiliates.

  • System Maintenance The Trust understands that USBFS will perform periodic maintenance to the System(s), which may cause temporary service interruptions. To the extent possible, USBFS shall notify the Trust of all planned outages and will perform any necessary maintenance during non-business hours.

  • Project Maintenance The Local Government shall be responsible for maintenance of locally owned roads and locally owned facilities after completion of the work. The State shall be responsible for maintenance of the state highway system after completion of the work if the work was on the state highway system, unless otherwise provided for in existing maintenance agreements with the Local Government.

  • Account Maintenance Trade Allocations Trade Reporting; (Futures) Daily Trade Checkout Daily Statement Reconciliation

  • Property Maintenance Maintain all of its property that is necessary to or useful in the proper conduct of its business in good working condition, ordinary wear and tear excepted.

  • REPAIRS; MAINTENANCE The Owner hereby gives power to the Agent to supervise repairs, improvements, alterations, and decorations to the Property as well as purchase and pay bills for services and supplies. The Agent shall obtain prior approval of the Owner for all expenditures over $ for any single item. Prior approval for lesser amounts shall not be required for monthly or recurring operating charges or if emergency expenditures over the maximum are, in the Agent’s opinion, needed to protect the Property from damage, prevent injury to persons, avoid suspension of necessary services, avoid penalties or fines, or suspension of services to tenants required by a lease or rental agreement or by law, including, but not limited to, maintaining the Property in a condition fit for human habitation as required by applicable law.

  • General Maintenance Borrower shall maintain the Project Site and all improvements thereon, including lighting and signage, in good condition, free of debris, waste and graffiti, and in compliance with the applicable provisions of the Anaheim Municipal Code. Borrower shall maintain the improvements and landscaping on the Project Site in accordance with the Maintenance Standards (as hereinafter defined). Such Maintenance Standards shall apply to all buildings, signage, lighting, landscaping, irrigation of landscaping, architectural elements identifying the Project Site and any and all other improvements on the Project Site. To accomplish the maintenance, Borrower shall either staff or contract with and hire licensed and qualified personnel to perform the maintenance work, including the provision of labor, equipment, materials, support facilities, and any and all other items necessary to comply with the requirements of this Agreement. Borrower and its maintenance staff, contractors or subcontractors shall comply with the following standards (collectively, “Maintenance Standards”): (i) The Project Site shall be maintained in conformance and in compliance with reasonable maintenance standards for comparable first quality affordable housing projects, including but not limited to painting and cleaning of all exterior surfaces and other exterior facades comprising all private improvements and public improvements to the curbline. The Project Site shall be maintained in good condition and in accordance with the custom and practice generally applicable to comparable first quality affordable apartment complexes in the County of Orange (the “County”). (ii) Landscape maintenance shall include, but not be limited to: watering/irrigation; fertilization; mowing; edging; trimming of grass; tree and shrub pruning; trimming and shaping of trees and shrubs to maintain a healthy, natural appearance and safe road conditions and visibility, and irrigation coverage; replacement, as needed, of all plant materials; control of weeds in all planters, shrubs, lawns, ground covers, or other planted areas; and staking for support of trees. (iii) Clean-up maintenance shall include, but not be limited to: maintenance of all sidewalks, paths and other paved areas in clean and weed-free condition; maintenance of all such areas clear of dirt, mud, trash, debris or other matter which is unsafe or unsightly; removal of all trash, litter and other debris from improvements and landscaping prior to mowing; clearance and cleaning of all areas maintained prior to the end of the day on which the maintenance operations are performed to ensure that all cuttings, weeds, leaves and other debris are properly disposed of by maintenance workers. Governmental Lender agrees to notify Borrower in writing if the condition of the Project Site does not meet with the Maintenance Standards and to specify the deficiencies and the actions required to be taken by Borrower to cure the deficiencies. Upon notification of any maintenance deficiency, Borrower shall have commenced to cure such deficiency within thirty (30) days and shall diligently act to correct, remedy or cure such deficiency within no more than sixty (60) days. If the written notification states the problem is urgent relating to the public health and safety of the City of Anaheim or Governmental Lender, then Borrower shall have forty-eight (48) hours to rectify the problem. In the event Borrower does not maintain the Project Site in the manner set forth herein and in accordance with the Maintenance Standards, Governmental Lender shall have, in addition to any other rights and remedies hereunder, the right to maintain the Project Site, or to contract for the correction of such deficiencies, after written notice to Borrower, and Borrower shall be responsible for the payment of all such costs incurred by Governmental Lender.

  • Emergency Maintenance LightEdge reserves the right to perform emergency Service maintenance as needed outside the Scheduled Maintenance window, in which case LightEdge will make a reasonable effort to notify the Customer if feasible under the circumstances. Any such maintenance will be considered an “Emergency Maintenance”. All Service SLAs will apply during Emergency Maintenance.

  • Planned Maintenance (a) Subject to any modification or amendment of this Agreement made pursuant to Section 4.2(c) or Section 7.3(d), Planned Maintenance occurring during the Delivery Term shall be coordinated and scheduled in accordance with this Section 9.6. Seller shall perform all Planned Maintenance (including Major Planned Maintenance) in a manner that optimizes the generation and benefits to Buyer of the Contract Energy, Storage Energy, and other Products (e.g., during off-peak periods and low-irradiance periods) and, without limiting the foregoing, either (i) outside of Daylight Hours or (ii) during the months of October and November only, during Daylight Hours; provided, however, that the foregoing restrictions shall not apply to any Planned Maintenance that Seller is required to perform pursuant to any applicable manufacturer warranty that cannot reasonably be performed by Seller subject to such restrictions. (b) Seller shall deliver to Buyer a proposed schedule for Planned Maintenance in respect of each Contract Year (“Planned Maintenance Schedule”) no later than ninety (90) Days before the start of such Contract Year. Planned Maintenance Schedules submitted by Seller shall (i) comply with the second sentence of Section 9.6(a) and (ii) include reasonably detailed descriptions of the Planned Maintenance to be performed, the Days and times in which each type of Planned Maintenance is scheduled to be performed, the estimated amount(s) of Contract Capacity and Storage Capacity that will be unavailable due to Planned Maintenance and the total number of hours that Seller expects that the Contract Capacity and Storage Capacity will be unavailable due to Planned Maintenance. The general form for the Planned Maintenance Schedule is set forth in Schedule 9.6. (The Planned Maintenance descriptions reflected in the general form set forth in Schedule 9.6 are provided for indicative purposes only, and are not necessarily representative of the detail, time periods, or certainty required for a Planned Maintenance Schedule hereunder.) (c) Buyer shall have the right to disapprove, in its reasonable discretion (provided that Buyer shall have the right to disapprove, in its sole and absolute discretion, any Planned Maintenance proposed by Seller that is inconsistent with the terms of this Agreement), any Planned Maintenance set out in any Planned Maintenance Schedule proposed by Seller for any Contract Year, except for any Planned Maintenance that (i) is scheduled to occur outside of Daylight Hours or during Daylight Hours during the months of October and November or (ii) Seller is required to perform pursuant to any applicable manufacturer warranty and that is scheduled to occur in compliance with Section 9.6(a). If Seller submits its Planned Maintenance Schedule for a Contract Year in accordance with the requirements of this Agreement and Buyer does not disapprove of any Planned Maintenance set out in such Planned Maintenance Schedule by sixty (60) days after submission, then such Planned Maintenance Schedule shall be deemed approved. If Buyer, in the exercise of its discretion as set forth above, disapproves any Planned Maintenance in such Planned Maintenance Schedule within the applicable time period specified above after its submission, Buyer shall notify Seller and the Parties shall use Commercially Reasonable Efforts to agree upon and finalize a mutually acceptable Planned Maintenance Schedule for the applicable Contract Year. Seller shall conduct Planned Maintenance during such Contract Year only in accordance with an agreed Planned Maintenance Schedule; provided, however, that Seller may (A) move Planned Maintenance included in an agreed Planned Maintenance Schedule that is not Major Planned Maintenance, so long as such move is consistent with the terms of this Agreement (including the second sentence of Section 9.6(a)) or, with respect to Major Planned Maintenance, if such Major Planned Maintenance is scheduled to occur outside of Daylight Hours or during Daylight Hours during the months of October and November and (B) schedule and perform Planned Maintenance not reflected in the Planned Maintenance Schedule so long as such Planned Maintenance is scheduled to be performed outside of Daylight Hours or during Daylight Hours during the months of October and November and Seller provides Buyer at least two (2) weeks’ prior written notice of such Planned Maintenance; provided further that Buyer shall have the right to advise Seller of periods when Buyer prefers, based on solar irradiance, supply, market and other conditions, that any Major Planned Maintenance be deferred, and Seller shall use Commercially Reasonable Efforts to comply with such request. (d) Seller shall use Commercially Reasonable Efforts to complete any Planned Maintenance and place the Facility back into full commercial operation as soon as reasonably possible. If Seller determines that any Planned Maintenance scheduled in an agreed Planned Maintenance Schedule no longer needs to be completed or will not consume the entire time scheduled therefor in the agreed Planned Maintenance Schedule, Seller shall provide (i) a Generation Forecast to Buyer reflecting the forecasted amount of Delivered Energy during each affected interval that takes into account such change and (ii) in the case of any Major Planned Maintenance, a written notice declaring the cessation and termination of the applicable Major Planned Maintenance period (in which event, the Major Planned Maintenance period shall terminate in accordance with the terms of such Generation Forecast and written notice).

  • Road Maintenance Purchaser shall maintain roads, commensurate with Purchaser’s use, in accor- dance with Road Maintenance Requirements in C5.31 and the Road Maintenance Specifications. Performance of road maintenance work by Purchaser may be required prior to, during, or after each period of use. The timing of work accomplishment shall be based on Purchaser’s Op- erating Schedule under B6.31.