Design and Construction Standards and Required Approvals Sample Clauses

Design and Construction Standards and Required Approvals. In the event the Project includes construction the following provisions are incorporated into this Agreement:
AutoNDA by SimpleDocs
Design and Construction Standards and Required Approvals a. The Agency understands that it is responsible for the preparation and certification of all design plans for the Project. The Agency shall hire a qualified consultant for the design phase of the Project or, if applicable, the Agency shall require their design-build contractor or construction management contractor to hire a qualified consultant for the design phase of the Project.
Design and Construction Standards and Required Approvals. 1) Grantee shall undertake the design, construction, and Consultant Construction Engineering Inspection (“CCEI”) of the Project in accordance with all applicable federal, state and local statutes, rules and regulations, including any other applicable standards and specifications. A professional engineer, registered in Florida, shall provide the certification that all design and construction for the Project meets the minimum construction standards established by Grantee.
Design and Construction Standards and Required Approvals. The Agency is responsible for the design, construction, and maintenance of the Project in accordance with all applicable federal, state and local statutes, rules and regulations, including FDOT standards and specifications. A professional engineer, registered in Florida, shall provide the certification that all design and construction for the Project meets the minimum construction standards established by FDOT and applicable Florida Building Code construction standards. The Agency shall submit all plans or related construction documents, cost estimates, project schedule, and applicable third party agreements to FDOT for review and approval prior to installation of the Project. The Agency is responsible for the preparation of all design plans for the Project, suitable for reproduction on 11 inch by 17 inch sheets, together with a complete set of specifications covering all construction requirements for the Project. Six (6) copies of the design plans shall be provided to FDOT’s District Design Engineer, at   . FDOT will review the plans for conformance to FDOT’s requirements and feasibility. FDOT’s review shall not be considered an adoption of the plans nor a substitution for the engineer’s responsibility for the plans. By review of the plans, FDOT signifies only that such plans and improvements satisfies FDOT’s requirements, and FDOT expressly disclaims all other representations and warranties in connection with the plans, including, but not limited to the integrity, suitability, or fitness for the intended purpose or whether the improvements are constructed in accordance with the plans. FDOT’s review of the plans does not relieve the Agency, its consultants or contractors of any professional or other liability for the plans. All changes required by FDOT shall be made by the Agency and final corrected plans shall be provided to FDOT within thirty (30) days. The Agency shall be responsible for locating all existing utilities, both aerial and underground, and for ensuring that all utility locations be accurately documented on the construction plans. All utility conflicts shall be fully resolved directly with the applicable utility. Section 337.403, Florida Statutes, shall determine whether the utility bears the costs of utility work. The Agency shall bear the costs of utility work not required to be borne by the utility by Section 337.403, Florida Statutes. The Agency shall be responsible for monitoring construction operations and the maintenance of traffi...
Design and Construction Standards and Required Approvals a. The Agency is responsible for the design, construction, and maintenance of the Project in accordance with all applicable federal, state and local statutes, rules and regulations, including the Department standards and specifications. A professional engineer, registered in Florida, shall provide the certification that all design and construction for the Project meets the minimum construction standards established by the Department and applicable Florida Building Code construction standards. The Agency shall submit all plans or related construction documents, cost estimates, project schedule, and applicable third party agreements to the Department for review and approval prior to installation of the Project. The Agency is responsible for the preparation of all design plans for the Project, suitable for reproduction on 11 inch by 17 inch sheets, together with a complete set of specifications covering all construction requirements for the Project. A copy of the design plans shall be provided to the Department’s District Design Engineer, located at 000 Xxxxx Xxxxxxxx Xxxx Xxxxxx, Xxxxxxx 00000 . The Department will review the plans for conformance to the Department’s requirements and feasibility. The Department review shall not be considered an adoption of the plans nor a substitution for
Design and Construction Standards and Required Approvals a. The Agency is responsible for the design, construction, and maintenance of the Project in accordance with all applicable federal, state and local statutes, rules and regulations, including the Department standards and specifications. A professional engineer, registered in Florida, shall provide the certification that all design and construction for the Project meets the minimum construction standards established by the Department and applicable Florida Building Code construction standards. The Agency shall submit all plans or related construction documents, cost estimates, project schedule, and applicable third party agreements to the Department for review and approval prior to installation of the Project. The Agency is responsible for the preparation of all design plans for the Project, suitable for reproduction on 11 inch by 17 inch sheets, together with a complete set of specifications covering all construction requirements for the Project. A copy of the design plans shall be provided to the Department’s District Design Engineer, located at 000 XX 00xx Xxxxxx Xxxxx, XX 00000 . The Department will review the plans for conformance to the Department’s requirements and feasibility. The Department review shall not be considered an adoption of the plans nor a substitution for the engineer’s responsibility for the plans. By review of the plans, the Department signifies only that such plans and improvements satisfies the Department’s requirements, and the Department expressly disclaims all other representations and warranties in connection with the plans, including, but not limited to the integrity, suitability, or fitness for the intended purpose or whether the improvements are constructed in accordance with the plans. The Department’s review of the plans does not relieve the Agency, its consultants or contractors of any professional or other liability for the plans. All changes required by the Department shall be made by the Agency and final corrected plans shall be provided to the Department within thirty (30) days.
Design and Construction Standards and Required Approvals. (a) The Agency agrees to undertake the design, construction, and Consultant Construction Engineering Inspection (“CCEI”) of the Project in accordance with all applicable federal, state and local statutes, rules and regulations, including FDOT standards and specifications. A professional engineer, registered in Florida and pre-qualified by FDOT, shall provide the certification that all design and construction for the Project meets the minimum construction standards established by FDOT.
AutoNDA by SimpleDocs
Design and Construction Standards and Required Approvals. In the event the Project includes construction the following provisions are incorporated into this Agreement: The Recipient is responsible for obtaining all permits necessary for the Project. In the event the Project involves construction on the Department’s right-of-way, the Recipient shall provide the Department with written notification of either its intent to: Award the construction of the Project to a Department prequalified contractor which is the lowest and best bidder in accordance with applicable state and federal statutes, rules, and regulations. The Recipient shall then submit a copy of the bid tally sheet(s) and awarded bid contract, or Construct the Project utilizing existing Recipient employees, if the Recipient can complete said Project within the time frame set forth in this Agreement. The Recipient’s use of this option is subject to approval by the Department. The Recipient shall hire a qualified contractor using the Recipient’s normal bid procedures to perform the construction work for the Project. For projects that are not located on the Department’s right-of-way, the Recipient is not required to hire a contractor prequalified by the Department unless the Department notifies the Recipient prior to letting that they are required to hire a contractor prequalified by the Department. The Recipient is responsible for provision of Construction Engineering Inspection (CEI) services. The Department reserves the right to require the Recipient to hire a Department pre-qualified consultant firm that includes one individual that has completed the Advanced Maintenance of Traffic Level Training. Notwithstanding any provision of law to the contrary, design services and CEI services may not be performed by the same entity. Administration of the CEI staff shall be under the responsible charge of a State of Florida Licensed Professional Engineer who shall provide the certification that all design and construction for the Project meets the minimum construction standards established by Department. The Department shall have the right to approve the CEI firm. The Department shall have the right, but not the obligation, to perform independent assurance testing during the course of construction of the Project. Subject to the approval of the Department, the Recipient may choose to satisfy the requirements set forth in this paragraph by either hiring a Department prequalified consultant firm or utilizing Recipient staff that meet the requirements of this paragrap...
Design and Construction Standards and Required Approvals a. The Agency is responsible for the design, construction, and maintenance of the Project in accordance with all applicable federal, state and local statutes, rules and regulations, including the Department standards and specifications. A professional engineer, registered in Florida, shall provide the certification that all design and construction for the Project meets the minimum construction standards established by the Department and applicable Florida Building Code construction standards. The Agency shall submit all plans or related construction documents, cost estimates, project schedule, and applicable third party agreements to the Department for review and approval prior to installation of the Project. The Agency is responsible for the preparation of all design plans for the Project, suitable for reproduction on 11 inch by 17 inch sheets, together with a complete set of specifications covering all construction requirements for the Project. A copy of the design plans shall be provided to the Department’s District Design Engineer, located at . The Department will review the plans for conformance to the Department’s requirements and feasibility. The Department review shall not be considered an adoption of the plans nor a substitution for the engineer’s responsibility for the plans. By review of the plans, the Department signifies only that such plans and improvements satisfies the Department’s requirements, and the Department expressly disclaims all other representations and warranties in connection with the plans, including, but not limited to the integrity, suitability, or fitness for the intended purpose or whether the improvements are constructed in accordance with the plans. The Department’s review of the plans does not relieve the Agency, its consultants or contractors of any professional or other liability for the plans. All changes required by the Department shall be made by the Agency and final corrected plans shall be provided to the Department within thirty (30) days.

Related to Design and Construction Standards and Required Approvals

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Suspension of unsafe Construction Works (i) Upon recommendation of the Authority’s Engineer to this effect, the Authority may by notice require the Contractor to suspend forthwith the whole or any part of the Works if, in the reasonable opinion of the Authority’s Engineer, such work threatens the safety of the Users and pedestrians.

Time is Money Join Law Insider Premium to draft better contracts faster.