General Building. This Indefinite Delivery-Indefinite Quantity Construction Contract (Contract) is between Sourcewell, 000 00xx Xxxxxx Xxxxxxxxx, X.X. Box 219, Staples, MN 56479 and Alco Building Solutions, 00000 Xxxxxxxx Xx, Unit A, Arcadia, California 91006 (Contractor). Sourcewell is a State of Minnesota local government agency and service cooperative created under the laws of the State of Minnesota (Minnesota Statutes Section 123A.21) that offers cooperative procurement solutions to government entities. Participation is open to federal, state and municipal governmental entities, K-12 and higher education entities, nonprofit entities, tribal governments, and other public entities located within the United States. The Contractor desires to contract with Sourcewell to provide construction services to entities that access Sourcewell’s indefinite delivery-indefinite quantity (IDIQ) construction contracts within the Service Region.
General Building a. Floor slabs shall be level with no greater than standard creative office deviations in elevation (i.e., no more than 1/8” over 10 feet), and smooth surfaces, and ready for carpet installation. Any floor levelling or trenching shall match the existing floors with regards to color and aggregate as Tenant will be utilizing concrete floors throughout.
b. All penetrations through rated assemblies and systems shall be sealed and fireproofed if required by building regulations.
c. Existing interior surfaces of ceilings, exterior walls and floor areas that are intended to become finished surfaces, pursuant to all applicable building and energy codes, shall be sandblasted and/or ready to receive finishes, or be detailed per Tenant’s plans. Surfaces that will receive sheetrock, insulation, or other coverings, do not require sandblasting.
d. All building core and common areas (interior and exterior), including stairwells, and utility rooms shall be fully upgraded, painted and complete pursuant to plans and specifications mutually agreed to between Landlord and Tenant, and shall be constructed in compliance with applicable codes and regulatory agency requirements. Landlord shall provide the keying and hardware for the Base Building, which hardware styles, finishes and materials shall be subject to Landlord’s and Tenant’s reasonable agreement. For clarity, Landlord’s Work shall include repainting of the entire exterior of both the Phase I Premises and the Phase II Premises (unless otherwise mutually agreed by Tenant and Landlord in their respective reasonable discretion).
e. Landlord shall furnish and install all sky lights and windows/perimeter window systems (min NC 35) pursuant to the Approved Working Drawings for Landlord’s Work, with finishes and materials subject to Landlord’s and Tenant’s reasonable approval.
f. Landlord shall provide at the ground or garage area(s) for Tenant’s secured bicycle and general storage items.
g. Landlord shall cause Landlord’s Work to be constructed to include any Specialized Improvements as directed by Tenant (as further set forth in (j) below). Any Specialized Improvements not set forth in (j) below shall be at Tenant’s sole cost and expense and may cause Tenant Delays.
h. Conduit pathway from Tenant’s premises to roof, as well as provisions on the roof for mounting of limited communication equipment.
i. As part of the Phase II Work, the Roof Deck shall be constructed at Landlord’s sole cost and expense in the area depicted on t...
General Building. (a) The space must comply with all applicable federal, state, or local laws, statutes, ordinances, codes, rules and regulations relating to the public health, safety and welfare.
(b) The building shall comply with the Uniform Building Code, latest edition, or the most current code adopted by the city and county where the building is located, National Electric Code, Uniform Plumbing Code, NFPA 101, SMACNA, ASHRAE, ADA and all Local Ordinances and Regulations.
(c) The Lessor must comply with all applicable statutes, ordinances, codes, rules and regulations covering notice of the opening of a medium restriction Residential Facility for Juveniles.
General Building. COSTS General Building costs, including, but not limited to exterminating, professional fees, administration and miscellaneous expenses for the Building will be allocated by Common Interest Percentage.
General Building. Lot 1 General Building Blaenau Gwent Region Lot 2 General Building Monmouthshire and Gwent Police Region Lot 3 General Building Torfaen Region Lot 4 General Electrical Blaenau Gwent Region Lot 5 General Electrical Monmouthshire and Gwent Police Region Lot 6 General Electrical Torfaen Region
General Building. Replace Roof
General Building. The Licensee is directly responsible for all damages to the facility’s property or equipment by its contractors, exhibitors, vendors, guests, and/or staff. Associated costs due to damages, removal and/or cleaning, is the responsibility of the Licensee.
General Building a. The Building structure is designed and constructed to UBC,79 (the building code at the time the Building was constructed) and each floor of the Building is capable of accommodating dead and live loads customary for office use and equipment incidental thereto.
b. All existing penetrations through rated assemblies and systems are sealed and fireproofed.
c. All Building core areas, including lobbies, corridors, elevators, stairwells, utility rooms, and restrooms are fully complete and were constructed in compliance with applicable codes and regulatory agency requirements at the time they were initially constructed. Notwithstanding the above, Tenant shall accept the condition of all Building core areas that exist within the Tenant’s Premises in their “as-is” state and Landlord shall not be responsible for upgrading any of these areas that exist within the Tenant’s Premises in order to meet current building codes and regulatory agency requirements.
d. Unsecured bicycle parking is provided in the garage and is to be shared between all tenants within the Project.
e. Landlord is in the process of modernizing the elevators and shall do so in accordance with the terms of Section 1.1.5 of the Lease.
f. Landlord will be responsible for correcting any site common area-related ADA items (i.e. items that exist within the Project but outside the Tenant’s Premises) to the extent they encumber the Tenant’s ability to obtain a permit or a final sign-off for occupancy. Date: ______ To: ________________________ Copy to: ________________________ Re: ______ Dated: ______ Between: CA-COLORADO CENTER, L.L.C., a Delaware limited liability company, Lessor or Landlord, and ______, a ______, Lessee or Tenant Suite Number ______, on the floor of the building located at ___________________ Xxxxx Xxxxxx, XX 00000 and that the following terms and conditions are accurate and in full force and effect: Base rent schedule From To: ______ ______ Monthly Rent$ Rent checks are Payable to: [APPROPRIATE ENTITY] Mailed to:[APPROPRIATE ADDRESS] All other inquiries to:Boston PropertiesFour Xxxxxxxxxxx XxxxxxXxxxx Xxxxx, Xxxxx XxxXxx Xxxxxxxxx, XX 00000 Telephone: 415-772-0700Fax: 000-000-0000 If the Lease Commencement Date is other than the first day of the month, the first billing will contain a pro rata adjustment. Each billing thereafter, with the exception of the final billing, shall be for the full amount of the monthly installment as provided for in the Lease. Pursuant to Article 2 of the ab...
General Building. Daily: Monthly: Semi-Annually: Daily: Daily: Daily:
General Building. A. Elevators ---------
1. Clean light lenses and replace burned out bulbs.
2. Spot clean walls.
3. Use paste wax or appropriate treatment on finished metal.
4. Clean edges, corners and tracks.
5. Vacuum carpet and remove gum, tar, etc. adhering to floors.
6. Shampoo carpet, as necessary.
7. As necessary, dust ceiling.
8. Damp clean elevator doors and call buttons.
B. Lobby -----
1. Machine scrub lobby floor using only Ivory Liquid soap with water
2. Clean all class entrance ways and side panels.
3. Empty all ash urns.
4. Spot clean marble walls, mailboxes, security desk, etc.
5. Dust all horizontal ledges.
6. Damp clean elevator doors and call buttons.
C. Day Crew - Services -------------------
1. Police and replenish supplies in all women's restrooms, to include sanitary supplies.
2. Vacuum all passenger elevators twice each day - once before lunch and once after.
3. Clean all ash urns twice each day.
4. Clean all glass entrance doors in main lobby.
5. Dust mop and/or damp mop all marble floors in main lobby once each day, as well as granite plaza area.
6. One utility man to clean service area, hallway and dock area.
7. Supply toilet tissue, soap and towels in mens' and ladies' restrooms.
8. There will be a constant surveillance of public areas to insure cleanliness.